INITIAL SETTING TIME OF CEMENT

Поделиться
HTML-код
  • Опубликовано: 15 янв 2025

Комментарии • 32

  • @rameshgadidesi4625
    @rameshgadidesi4625 3 года назад

    Finally you not showing initial setting time value . actually initial setting time before 30 min naa.

  • @thirunavukarasu0079
    @thirunavukarasu0079 2 года назад +2

    👌

  • @SoudagerAamer
    @SoudagerAamer 5 лет назад +1

    0:22 That's needle isn't it?

  • @samarthanreddy4117
    @samarthanreddy4117 5 лет назад +2

    0.85×32% equals 0.272 sir.. how did u get 68ml? Could u please explain that

    • @yasamnaresh5634
      @yasamnaresh5634 5 лет назад +5

      In serial no 3 the percentage of water taken is 32% i.e 80ml..at 32%we obtained standard consistency.so for IST we have to take 0.85*80=68ml..

    • @rohitgooner878
      @rohitgooner878 5 лет назад +1

      The Weight of cement taken in this case is 250g.
      So, 32% of 250 = 80ml
      0.85 * 80 = 68ml

    • @ashwinichinu2681
      @ashwinichinu2681 5 лет назад +1

      Tq u sir

    • @janninoenecio78
      @janninoenecio78 4 года назад

      @@rohitgooner878 where did 0.85 came from?

    • @shantharam2699
      @shantharam2699 2 года назад

      Actually just 24% water is enough of cement weight bro

  • @rajaram-pu2tn
    @rajaram-pu2tn 3 года назад +2

    Don't give half half information 1)when ur add water timer should starts 2) for make penidation should need 2differnt diameter needle 3)use for determine initial setting time for 3mm needle 4)use for final setting time smaller mean 1mm 5)waterquantity=0.85×standard consists ofwater(like 0.32)×weight of cement (may you take 250 gram)

  • @sanjeeviglesias6293
    @sanjeeviglesias6293 5 лет назад +2

    The cement weighing 300g is taken and it is mixed with Percentage of water as determined in consistency test. The cement paste is filled in the vicat mould. The square needle of cross section 1mm× 1mm is attached to the moving rod of the vicat apparatus. The needle is quickly released and it allowed to penetrate the cement paste in tge begging the needle penetrate completely.it is then taken out and dropped at a fresh place the procedure is repeated at regular intervals till the needle does not penetrate completely the needle should penetrate upto about 5 mm measured from bottom. The initial settings time is the interval between the addition of water to cement and the stage when needle cease to penetrate completely.thia time should be about 30 minutes for opc

  • @civilengineeringbykrishans9406
    @civilengineeringbykrishans9406 4 года назад +1

    Good video

  • @JohnPeter-cf9rv
    @JohnPeter-cf9rv 4 месяца назад

    தமிழ் வாழ்க வளமுடன்

  • @mandanmishra5660
    @mandanmishra5660 4 года назад +2

    No better performance by you, 1)you don't obey the gauging rule. 2)you don't obey the time period. 3)I don't understand how you use gauging trowel by one hand. 4)pouring water is too slow.

  • @mdshahbaz8054
    @mdshahbaz8054 5 лет назад +1

    Thank you sir.

  • @cockerala1633
    @cockerala1633 5 лет назад +1

    Thank you sir

  • @Right_ToServe
    @Right_ToServe 4 года назад

    Sir I think u r added again some of water... 🤔🤔

  • @ravipatel9316
    @ravipatel9316 5 лет назад +1

    But, lastly you not showing what is exect initial setting time...

    • @mgmwgl
      @mgmwgl 5 лет назад

      @Ravi Patel.. its 35 minutes

    • @vishnuvardhan7135
      @vishnuvardhan7135 5 лет назад

      @@mgmwgl but our Is standard initial setting time of cement is 30.
      But , experimentaly you get 35.
      Could you please tell us sir

  • @bhagatuttam1452
    @bhagatuttam1452 4 года назад

    Good knowledge sir ,

  • @omkarutekar8950
    @omkarutekar8950 5 лет назад +1

    take 400 gm of cement hame to aisa bata yaa hai

  • @KShireesha-uj2dx
    @KShireesha-uj2dx 2 месяца назад

    250/100 *32=80
    0.85*80=68

  • @badalkumar6603
    @badalkumar6603 4 года назад +1

    Galat testing kiya hai.

  • @uwiringiymanajohn2352
    @uwiringiymanajohn2352 3 года назад

    E

  • @gautamkadam4067
    @gautamkadam4067 5 лет назад +1

    सब गलत कर रहे हो.

    • @sanjeeviglesias6293
      @sanjeeviglesias6293 5 лет назад

      The cement weighing 300g is taken and it is mixed with Percentage of water as determined in consistency test. The cement paste is filled in the vicat mould. The square needle of cross section 1mm× 1mm is attached to the moving rod of the vicat apparatus. The needle is quickly released and it allowed to penetrate the cement paste in tge begging the needle penetrate completely.it is then taken out and dropped at a fresh place the procedure is repeated at regular intervals till the needle does not penetrate completely the needle should penetrate upto about 5 mm measured from bottom. The initial settings time is the interval between the addition of water to cement and the stage when needle cease to penetrate completely.thia time should be about 30 minutes for opc

  • @arunkumar2929
    @arunkumar2929 3 года назад

    👎👎👎👎

  • @thetechnicalaspirants357
    @thetechnicalaspirants357 5 лет назад

    Thank u sir

  • @gopalakrishnapodilapu7599
    @gopalakrishnapodilapu7599 3 года назад +1

    Thank you sir