Sprinklermatic - Fire Pumps, Controllers, and Holding Tanks

Поделиться
HTML-код
  • Опубликовано: 3 янв 2025

Комментарии • 3

  • @edwardjrerlandiz4983
    @edwardjrerlandiz4983 3 года назад +3

    In regards to the rule on test header. Yes, control valve to be tested annually but flowing for rated and peak can be tested through the flow meter and every 3rd year through the test header. In my opionion i like to see demad while flowing. I love the video and the presentation. Great work for sure.

  • @mikebrisboisieee250
    @mikebrisboisieee250 2 года назад +1

    Thanks