SCE Prospect Ave powerline maintenance

Поделиться
HTML-код
  • Опубликовано: 21 июл 2017
  • SCE rebuilding the power poles and replacing the power lines on Prospect Ave between Aviation and 16th Street.
  • ВидеоклипыВидеоклипы

Комментарии • 19

  • @michaelmorgan7893
    @michaelmorgan7893 Год назад

    With those plastic insulators that are lightweight when compared to the old porcelain/glassware, they make easy work of lifting those new crossarms into place.

  • @benbensch3461
    @benbensch3461 20 дней назад

    Do you keep the power on when do that

  • @Henry-vq6tl
    @Henry-vq6tl 2 года назад +2

    They look like a contracting firm hired by your local power company

    • @jolyonwelsh9834
      @jolyonwelsh9834 Месяц назад

      Are they in the union?

    • @Henry-vq6tl
      @Henry-vq6tl Месяц назад

      @@jolyonwelsh9834 🤷🏽‍♂️

    • @chacehart7286
      @chacehart7286 22 дня назад

      @@jolyonwelsh9834100% Herman Weisseker is a IBEW 47 signatory contractor for Edison.

  • @jimlandreth555
    @jimlandreth555 Месяц назад

    Never seen crossarms hung that way , bucket/lift makes things easier.

  • @chrislopez349
    @chrislopez349 5 лет назад +3

    This actually looks like a 4kv cut over not sure what the primary voltage is they’re cutting over to.

    • @linehandibew6205
      @linehandibew6205 3 года назад +2

      The new pot they were hanging on that pole was a 4kv can. Looks like they’re keeping same voltage but just upgraded wire pots and arms. Wish they would let us take a mass outage like that in New York lol. We pull wire in hot parallel everything in and remove everything with line hot.

    • @Bananahammock88
      @Bananahammock88 3 года назад +1

      @@linehandibew6205 yeah California is usually the same.

    • @chasefrank8143
      @chasefrank8143 6 месяцев назад +1

      A lot of your old 4kv was stuff put up back in the early 40s late 30s. Even for a cut over in Baltimore you got a 90% chance your taking a decent outage. Probably why they got guys on hooks. Need every swinging dick in the yard to get it done in the time frame.

  • @jolyonwelsh9834
    @jolyonwelsh9834 Месяц назад +1

    4KV that's pretty low by today's standards. Nowadays they use 7.2KV to ground, 12,470 volts phase to phase.

    • @kgeitzel3293
      @kgeitzel3293 23 дня назад +1

      Is that each phase or total?

    • @mxslick50
      @mxslick50 5 дней назад

      @@kgeitzel3293 Phase to phase, 3 phase delta (no primary neutral). SCE has a hard-on for delta primary in a large portion of their service territory.

  • @sircampbell1249
    @sircampbell1249 20 дней назад

    Cheap wooden poles

    • @mxslick50
      @mxslick50 5 дней назад

      Wood poles have become almost, if not more, expensive than steel or concrete. (Due to the pressure treating and strength required.) And, in earthquake prone areas, wood poles won't crack or bend like concrete and steel can.

    • @sircampbell1249
      @sircampbell1249 5 дней назад +1

      @mxslick50 only uses steel here