    Hello there, maybe you can help me: I am currently building a concrete whirlpool in germany (concrete floor. walls are made with concrete bricks). how much time do i have to wait to apply the sealing slurry and install the glass mosaik tiles after the concrete floor has been poured? under the concrete floor is a polyethylene tarpaulin. and under that is gravel. someone i know said at least 3 weeks, because the concrete has to dry and can not breathe if sealed from both sides. I hope you understand what i am talking 😅

    • @Buildahottub
      @Buildahottub  3 месяца назад +1

      Sure - its normally only a week max if you have cooler temperatures - but the concrete you have used tshould have that information on - hope that helps - Andi

    • @c3.
      @c3. 3 месяца назад

      @@Buildahottub Thank you 💪