Sennebogen 870R unloading dredged spoil with 6.000 liter Kinshofer grab.
HTML-код
- Опубликовано: 3 дек 2024
- Unloading dredged spoil with over 5 cycles a minute with 6 m3 grab. Because the material is very much fluid I can grab without first completely opening the bucket which saves a lot of time. However the fluid material costs loads of time cleaning up.
This was 741m3 in a little less than an hour.