Bengaluru Chennai Expressway Progress Update | All You Need To Know

Поделиться
HTML-код
  • Опубликовано: 17 окт 2024

Комментарии • 800

  • @vinu85
    @vinu85 Год назад +110

    Love the fact that you showed the two existing ones graphically and compared that with the new one coming up. Just absolute praise to each and everyone in your team.

  • @gouravsingh8217
    @gouravsingh8217 Год назад +437

    Nitin Gadkari is having a close watch on all your videos.

    • @dronemanYT
      @dronemanYT  Год назад +62

      I Hope so 😊

    • @prannoy8420
      @prannoy8420 Год назад +97

      @@dronemanYT he recently posted photos from your videos of Bengaluru mysuru eway and even gave courtesy by mentioning you below.

    • @detroitofasia2632
      @detroitofasia2632 Год назад +3

      He Has nothing to do with Kaveri River water sharing Tribunal.
      He is having silent watch on Nationalisation of Rivers.

    • @mkskn9575
      @mkskn9575 Год назад

      Mayirula 😂

    • @rsgprakasam
      @rsgprakasam Год назад

      Why not in English?

  • @vinu85
    @vinu85 Год назад +245

    So proud of you guys showing South India and (hopefully North East and Kashmir). Most of us from South probably know more about all the expressways and link roads in UP because YT/Twitter accounts are filled with them. Than South India's highway developments. Nitin Gadkari said in the parliament the most costliest state for Highway development is Kerala due to high cost of land acquisition.

    • @dronemanYT
      @dronemanYT  Год назад +26

      Thanks for the appreciation, 😊
      we will keep continue covering Sothern region ✌️

    • @KK-wk1id
      @KK-wk1id Год назад +30

      It's southern India not South India

    • @nsharat5498
      @nsharat5498 Год назад +20

      @@KK-wk1id is this English Grammar class??? 😂

    • @Cooperisbooed
      @Cooperisbooed Год назад +9

      Only issue I see is existing highway got upgraded to 6 lane only after 4 lane were getting jammed. So this must also be a 6 lane highway. Else we citizens again need to face hardship of construction and deviation.

    • @vinu85
      @vinu85 Год назад +7

      @@Cooperisbooednot sure if your watching any of these vids. They are all extendable to more lanes. There's lot more planning than the earlier govts. Second and foremost no roads will EVER be enough. Singapore is barely the size of Mumbai and still traffic is relatively smooth because cars are so expensive it has the highest taxes in the world. It is intended to stop people from buying cars in the small countrym. So if you don't want traffics jams check out Singapore. But if you want drive a car, stay in India.

  • @sampathkumar8171
    @sampathkumar8171 Год назад +161

    Nitin Gadkari ji is a gift to the nation. The speed with which he is executing his projects to
    take India to the highest level with regard to our infra-structure, is apparent in the completion of numerous projects in record number of distance and time, most importantly, with out compromising on the quality of the project. His name will go in golden letters, in the history of the nation, as the man who gave India an excellent infra-structure, both road and waterways!
    Salutes, Nitin Gadkari ji! 🙏👏👏💐

    • @vinu85
      @vinu85 Год назад +3

      His statue is defn going to come up in Nagpur one day.

    • @jvgeorge1474
      @jvgeorge1474 Год назад +6

      Well said.A sincere and committed leader, with clear thinking and progressive ideas. An asset of. India

    • @sushantparmar3076
      @sushantparmar3076 Год назад

      Delhi merrut expressway is best project

    • @sowmitriswamy6718
      @sowmitriswamy6718 Год назад

      Not so fast. Look at quality issues on the Banglaore Mysore expressway. Flooding a week after inauguration!

    • @voldemort6596
      @voldemort6596 Год назад +6

      That's why vote for BJP again. Lets make BHARAT great again.

  • @santoshchannappa5850
    @santoshchannappa5850 Год назад +25

    Happy to see good progress on this very important project!

  • @mostlybasic
    @mostlybasic Год назад +13

    Doing great work. Unparalleled. Kudos to your efforts. We always see your videos on our 65inch tv.. everyone in famiygets updated with latest developments in country.

  • @pv8929
    @pv8929 Год назад +58

    Can you cover NH66 it's the most overlooked stretch and one of the most fatal roads? As Mr Gadkari seems to be following your work he may pay more attention to the stretch once it is showcased on this channel...🤞

  • @dr.n.mohan-738
    @dr.n.mohan-738 Год назад +11

    Towards Bangalore City side it would be of great advantage If the express way is further taken forward from Hoskote and directly connected to the outer ring road (ORR) skipping the ever present traffic jams at Krishnarajapuram . Otherwise it will be the same story of getting into slow moving traffic and traffic jam. This means that it will not be possible to fully take advantage of the benefit from this express way unless we resolve the above issues of traffic jam and slow moving traffic between Hoskote and ORR. Secondly three lanes would be more safe as the vehicles in the event of break down can safely be parked on the side lane.

  • @vishwasreddy8169
    @vishwasreddy8169 Год назад +13

    Will be a huge boost for automobiles and other assembly and manufacturing hub in malur region...

  • @Mr.J.78
    @Mr.J.78 Год назад +25

    Can you please cover shiradi ghat (bangalore - mangalore highway) as well? It looks more like excavation area than national highway.

  • @venugopaln821
    @venugopaln821 Год назад +4

    Kudos to you for this great video, and a great initiative from the GoI . Roadways are like the nervous system of the country. so seeing these getting implementedx at least now is always a welcome sign.
    1 question though: why not make the road 8 lane at the start itself instead of planning to expand it later ?? will it not be a overhead considering that is a major economic corridoor ?? the logistics, cost will be more and the hinderance also will be high if planned alter .

    • @kanakTheGold
      @kanakTheGold 6 месяцев назад

      Only in Delhi and North, they spend lakhs of crores unnecessarily on tier2 cities. While in southern states, they are sidelined.

  • @shreekumarc
    @shreekumarc Год назад +17

    Commendable project, and thanks for the video.
    My only point - in a country of 1.4bn population - constructing a 4 lane highway between two major capital cities is short sightedness. Even if it can be expanded to 8 lanes later. Rather, 8 lanes should be constructed straightaway with provision to expand it to say 12 lanes later. Constructing 8 lanes at today's cost will be comparatively cheaper than in the future.

    • @dhirajsharma663
      @dhirajsharma663 Год назад +5

      Sir environment and land acquisition major problem in southern India part so expressway is only 4 lane

    • @Ravikalavidh1259
      @Ravikalavidh1259 Год назад

      Is it 4 way each side ( total 8 roads for too & fro ) or 2-2 way each side ( total 4 roads too & fro ) ?

    • @SebinMatthew
      @SebinMatthew Год назад +1

      considering that south india only has 25cr out of the 1.4bn population, i dont think its necessary. UP and the northern states definitely need 8 lane expressways as once those states get richer, the vehicle density is going to explode.

    • @vee5931
      @vee5931 Год назад +1

      @@SebinMatthew dude you haven't travelled in southern india i guess.. It has nothing to do with population. Its a port city and connecting to startup hub of India.. Have seen so many trucks jam packed in current highway.. Definitely need minimum 6 lanes. When they can do 8 lanes in noman lands like UP where people tax is half of what south indian states pay

    • @kanakTheGold
      @kanakTheGold 6 месяцев назад

      @@vee5931 Yes, the 40 Cr population of UP, Bihar is mostly using public transport. But here, even the 25 Cr population needs freight, industrial traffic demands met. Some folks are just gaslighting here, lol.

  • @sadenb
    @sadenb Год назад +18

    South India should have a lot more expressways considering it is the most industrialized area of India.

    • @ayandas7752
      @ayandas7752 Год назад

      lol
      a frog in a well thinks that's an ocean

    • @Tamilian861
      @Tamilian861 Год назад

      @@ayandas7752 u talk about north indians???

    • @ayandas7752
      @ayandas7752 Год назад

      @@Tamilian861 anyone who thinks their respective area is most industrialized, developed, educated etc. Isn't that simple sir/ma'am?

    • @sadenb
      @sadenb Год назад

      @@ayandas7752 Dude . I am from Kolkata , staying in the US . I have enough experience of the world to judge things for myself.

    • @ayandas7752
      @ayandas7752 Год назад

      @@sadenb from Kolkata staying in US, have enuf experience.. lol.. I live in Frankfurt, was born in Auckland, schooling in India, UK.. job in Dubai and Germany still don't know anything about the world... find hilarious when chutiyas go abroad for some time and think they have seen the world.

  • @Akash_.
    @Akash_. Год назад +20

    Bro Come to Port of Trivandrum (Vizhinjam) which is being Built by Adani's...It will show the best scenic view of India's True Beauty! 🇮🇳

  • @ReghurajIyer
    @ReghurajIyer Год назад +5

    Good job Droneman 👌 nice update. Good that you added a watermark in the middle, I've noticed many others are using your footage. I think even Gadkari ji's videos and photos were taken from yours.

  • @kirik-mj1mh
    @kirik-mj1mh Год назад +24

    At least they would make it 6 lanes at this moment of time... Although provision is kept for 8 lanes..in future, as this corridor is mainly ment for economic purpose.. heavy trucks and other slowly moving vehicles will not maintain lane discipline .. as same thing happening between tumkur to Bangalore ( Pune - Bangalore Highway)which is very much difficult to ride as govt has made SEZ in this heighway .

    • @chintandoshi21
      @chintandoshi21 Год назад +1

      well they have limited budet else the cost will increase to 25000 cr

    • @drkamalesh70
      @drkamalesh70 Год назад +6

      @@chintandoshi21 I am sure within 10 years of inauguration they will be forced to expand it with another 30,000 cr cost.

    • @SharkFishSF
      @SharkFishSF Год назад +2

      Expressway means no 2 wheelers or 3 wheelers, so trucks will strictly have to maintain slow lane because there's no bike or auto in the slow lane.

    • @kaushiksankaran
      @kaushiksankaran Год назад +6

      @@chintandoshi21 gadkari ji says there is no issues for budget for road infra. Infact even smaller cities have wider expressways under construction. Bangalore and Chennai are tier 1 cities. They deserve a bigger and better one.

    • @tusharbansal9362
      @tusharbansal9362 Год назад +2

      @@kaushiksankaran it should be 8 lane wide bcz Bengaluru and Chennai are mega economic powerhouse of India. There will be lot of transportation in this this highway

  • @chennareddyindla2349
    @chennareddyindla2349 Год назад +1

    Thank you sir, for telling its width ROW 90 meters and median 9meters. Genaraly reporters won't collect such technical data.

  • @drkamalesh70
    @drkamalesh70 Год назад +7

    Excellent video. I have one query, why this expressway is 4 lane? ..why not a minimum 6 lane? (especially when it is planned for 8lane)
    I remember, Gadkariji once stated all expressways will be made with minimum 6 lanes..
    I am sure 10yrs after inauguration of this road (which is connecting two major economic city if India), they will have to expand it again with a higher cost..

    • @srinitaaigaura
      @srinitaaigaura Год назад +3

      Land is available for 8 lanes so expansion will not be an issue. The issue is demand. We don't want a financial failure.

    • @drkamalesh70
      @drkamalesh70 Год назад +1

      @@srinitaaigaura I don't remember any expressway in India which has become a failure. More so when the expressway is connecting two major financial hubs with one of them being a port city...i don't see this EW being a failure. Out of 4 lanes...2 lanes will be occupied by heavy vehicles and trucks etc ... leaving only 2 lanes other traffic...i don't think a speed of 100km/h will be possible. This will lead to traffic snarls and total time will be close to 4 hours..or so..

    • @SharkFishSF
      @SharkFishSF Год назад +1

      Earth work is done for 8 lanes I think. So just readying the 4 extra lanes should be easy.

    • @drkamalesh70
      @drkamalesh70 Год назад +4

      @@SharkFishSF the issue is the space for the future expansion is the median. Now whenever expansion is done, the heavy machinery used for construction will create bottleneck for the other lanes. For example u can see the brownfield expansion of Delhi- Panipat highway. When most construction on expansion of this highway was underway, traveling to Chandigarh from Delhi took about 6 hrs!! (For a distance of 270 odd km). So any future expansion in an existing highway or expressway will hamper vehicular movement in that way. This defeats the purpose of expressway. Either iur planners lack the foresight or this is done deliberately to hike up construction cost so that everyone benefits..

    • @SharkFishSF
      @SharkFishSF Год назад +3

      @@drkamalesh70 definitely cost overruns planned. Without that, it's impossible for contractors to do business with the govt. This is why these things don't even come under the purview of law.

  • @srinitaaigaura
    @srinitaaigaura Год назад +16

    Unless this expressway comes all the way to Maduravoyal and connects with Chennai Outer Ring Road (which is why Phase 4 is the most critical one), or better still finds some way to be extended all the way from Maduravoyal to Koyambedu's cloverleaf interchange (maybe the Port Maduravoyal expressway will help people reach Marina beach speedily), the horror stretch from Sriperumbudur onwards will still be a huge roadblock. However this route is much shorter than going via Vellore Krishnagiri and Hosur. Hope NH48 will also get due development. I travel up and down this stretch at least monthly. Driving from Walajapet is a nightmare. In future this expressway may directly link to Hosur as well. A direct route from Vellore to Arakonam, Thiruvallur and Chennai following the rail line as far as possible will also be useful for people travelling to the North and West of Chennai.

    • @SKumar-kp7fq
      @SKumar-kp7fq Год назад +1

      There is an elevated flyover plan which is on hold from Maduravoyal straight to Madras port for all the industries in the Sriperumbudur stretch which would have separated commercial traffic of the industries needing to go Madras port from normal commuters sparing the nightmare stretch but for some reason it did not complete and it is held up in courts. One can still see the pillars raised for same which would confuse if you are new to Chennai. I read years ago that the slum dwellers who were affected in the projected path went to courts but understand that all of them have been relocated to OMR think this new highway is the reason its not being resumed.

    • @Ravikalavidh1259
      @Ravikalavidh1259 Год назад

      Is it 4 way each side ( total 8 roads for too & fro ) or 2-2 way each side ( total 4 roads too & fro ) ?

    • @Dhanuhammer
      @Dhanuhammer Год назад

      @@SKumar-kp7fq those pillars on Maduravoyal were layed back in 2009 for Port Maduravoyal Expressway, but they'll not be utilised it seems
      And under phase 4, maybe they'll link the Bengaluru Chennai Expy with Port Maduravoyal Expressway

    • @kanakTheGold
      @kanakTheGold 6 месяцев назад

      @@Ravikalavidh1259 2+2 both sides considered = 4 lane combined main carriageway, too small for major cities.

  • @nandbala
    @nandbala Год назад +3

    Very good video. Well done 🎉 The initiative deserves high level of appreciation 👍👏👏 However, 8:07 8:07 Starting it as 4 way is a short sighted approach for such a high density and high volume route. The challenge will continue to be from Sriperumbudur to Chennai city. Moreover, it’s high time that heavy vehicles are strictly prohibited on the first lane, ie., fastest lane.

  • @mahendrapathak1661
    @mahendrapathak1661 Год назад +54

    In Indian driving conditions and styles, any highway with less than 3 lanes on each side is difficult to drive on.

    • @ravindradaundkar9905
      @ravindradaundkar9905 Год назад +6

      Right and 4 lane shouldn't be called an expressway.

    • @nikhilPUD01
      @nikhilPUD01 Год назад +5

      @@ravindradaundkar9905 3 lanes is expressway... 4 lanes is adition to 3 lanes for traffic control.

    • @santhoshd9591
      @santhoshd9591 Год назад

      There's diff b/w highway & expressway , point to be noted

    • @chrisfrancis7842
      @chrisfrancis7842 Год назад +2

      Absolutely. Having 5 lanes on one side and having 5 trucks using all the five lanes parallelly spoils the purpose of the expressway.

    • @nikhilPUD01
      @nikhilPUD01 Год назад

      @@chrisfrancis7842 Yup 😂
      We need CCTV with an AI system to solve this habit of breaking rules and driving crazy... risking the lives of everyone.

  • @ramusekar424
    @ramusekar424 Год назад +31

    BJP should cover all the projects. A project a day even won't fit into 365 days. That much work going on slow and steady. Hatsoff modi. He transform every district of India. 👌🏻🔥

    • @coppeenajumudeen1924
      @coppeenajumudeen1924 Год назад

      Telangana Kerala and tamilnadu role models for India. Has gmc in 90 percent districts. While no Bihar less than 40 percent ha ha ha ha . Poor Northies.

  • @sruviews5223
    @sruviews5223 Год назад +2

    If you ever decide to cover any road in Andhra/Telangana...it would be (i) Suryapet Khammam i.e. almost complete (ii) Khammam to Deverapalli new greenfield expressway (iii) Khammam-Kodad.....and (iii) Vijayawada East Bypass.

    • @dronemanYT
      @dronemanYT  Год назад

      Thnks for the details 🤗 keep suggesting

  • @shashankkulkarni993
    @shashankkulkarni993 Год назад +11

    Currently indian government doing fantastic job towards development of roads railways air water ways energy and defence sector is key for agriculture tourism logistics

    • @mastermn4085
      @mastermn4085 Год назад

      Air travel elites can afford. I don't know which place u r from. Try getting a train ticket n Travel to eastern states or northern states. Railways SL n pls do send me a reply. Caution pls book 120 days in advance for confirmed tickets .kindly reply in September

    • @mastermn4085
      @mastermn4085 Год назад

      U will find the real improvement of railways

    • @mastermn4085
      @mastermn4085 Год назад

      Don't just see th fancy trains . Travel like a comman man in daily trains

  • @InfrastructuraRomania
    @InfrastructuraRomania Год назад +6

    Most impressive!
    I subbed ❤️
    Greetings from Bucharest Romania!
    👍🙋🇹🇩💯

  • @arjunhar4866
    @arjunhar4866 Год назад +5

    Bro why is no youtuber covering the second biggest expressway of india the Amritsar-Jamnagar expressway which is said to break all record of speed of construction and to be opened in Sept 2023.....Why haven't you covered bro?

  • @bothamreddy
    @bothamreddy Год назад +13

    India is going to witness the Best and massive infra growth in another 5 years under visianary leardership of Modi and Bob the builder Nitin Gadkari

    • @deepak9239
      @deepak9239 Год назад

      Bob the builder.. nice name

    • @SampathkumarP
      @SampathkumarP Год назад +3

      Could have been better if not for the corruption of Modi

  • @akshaykhandve1122
    @akshaykhandve1122 Год назад +5

    Im overwhelmed with seeing such progress of my country. Thank you Government of India. Thank you Modi ji. 🙏🇮🇳

  • @ThePhandey
    @ThePhandey Год назад +1

    Let’s go India! It’s India’s time to shine!!

  • @jalandarjagtap4453
    @jalandarjagtap4453 Год назад

    Great work by great Gadkari ji, amazing achievements proud of you Modi ji Gadkari ji 🙏

  • @surelaks1
    @surelaks1 Год назад +1

    Thanks for sharing. with land acquisition still a challenge in some areas, doubt whether it will see the light of the day next March. what do you think?

  • @fouzia411
    @fouzia411 Год назад

    A VERY GOOD BEGINNING STARTING FROM BANGALORE TO MYSORE
    AND
    NOW BANGALORE TO T CHENNAI

  • @rpworld5288
    @rpworld5288 Год назад +1

    Hello I am first time seen such a massive drone picture... I felt like watching some international english movie.. great thanks

  • @dinakaranannadhorai2721
    @dinakaranannadhorai2721 Год назад +1

    I wish it could have been made as 6 ways or 8 ways lane !!!! Then easily we could reach in 2 to 2.5 hours

  • @shaankarreddybn3536
    @shaankarreddybn3536 Год назад +5

    Your post production is highly professional. Thanks for covering this sector.

  • @deekshantbelwal1269
    @deekshantbelwal1269 Год назад +3

    Awesome work Droneman ji...aise hi drone uda ke aap Dronacharya ban jaoge ek din

  • @indradevabhakt6244
    @indradevabhakt6244 Год назад

    Nice video 🍻.. Really liked the graphics (Font text letters..Road.maps..etc) which you have used in this video, which looks very high end and appealing for the video along with your smooth narration. Overall,l a well made video 👍👍👍☺

  • @Gowthamsgalleryvlogs
    @Gowthamsgalleryvlogs Год назад

    Awesome sir, Great effort you putted toshow us, Really appriciate ur work.
    Thank u so much, Keep rocking

  • @daneshwarbais433
    @daneshwarbais433 Год назад +2

    Gajjab rod hai good update sir 👍👍❤️❤️👍

  • @detroitofasia2632
    @detroitofasia2632 Год назад

    Look at the thumbnail.
    Vast Habitat fragmentation.
    Existing Roads is more than Enough.
    Save Environment Save Wildlife Save Nature.

  • @anitosh
    @anitosh Год назад +1

    Your soothing voice, video quality, graphics and post production are too good.

  • @chennaikaaran7668
    @chennaikaaran7668 Год назад +1

    ❤watching Tamilnadu country ,chennai city …in future🎉🎉🎉🎉…

  • @kuladeepreddy2885
    @kuladeepreddy2885 Год назад +1

    Good job... well collected data

  • @saragadamsuryasankar5893
    @saragadamsuryasankar5893 Год назад +1

    Why are we not planting trees on both sides? We need small flower bearing inbetween the two ways so that light from opposite vehicle can be avoided.

  • @joyn7
    @joyn7 Год назад +3

    Nitin Gadkari is gem

  • @sumugansumugan9544
    @sumugansumugan9544 Год назад

    Good job 👍, seems 3 intersection it will be getting apart from Hoskot and Sriperumperdhur
    1.Kolar or Palmanar ( Chitoor )
    2.Manimangalam (Vellore)
    3.Paranthur ( Chennai's second Airport )

  • @yerramsettydeepak647
    @yerramsettydeepak647 Год назад +5

    The merge point of expressway with NH4 old madras road is 20km from Tinfactory flyover start which is gateway to Benguluru. In Chennai in Google maps tied work is not yet visible but sriperumbudur toll plaza to Koyambedu is 33km. But the merging point is beyond that so that means around 40km. Distance now is 322km and of central railway stations are taken another 25km making 347km vs train distance 358km.

    • @kanakTheGold
      @kanakTheGold 6 месяцев назад +1

      Yes, thats why you can cover current distance 262km i maybe 3 Hrs. But you will spend another 3 hours in city limits of both Bangalore and Chennai. Need to bring the starting points much closer to KR Puram and Koyambedu respectively. May be build an elevated 4 lane within city limits for seamless non stop travel. Else not much benefit compared to the other 2 existing routes. Particularly because this new expressway is only 4 lane and doubt if you can maintain 90 kmph for sustained periods of time. Even a 6 lane might have helped maintaining higher max speed.

    • @kanakTheGold
      @kanakTheGold 6 месяцев назад

      VB from MGR to SBC takes 4h 15m. KJM to MGR VB takes 4 hrs similarly. Need overall time on expressway to not be significantly more. It will be 6 hours still, point to point.

  • @jagamemes
    @jagamemes Год назад

    March -2024 is that the deadline for roadways and railway?? Lane too

  • @princegopal4566
    @princegopal4566 Год назад

    आप बहुत अच्छे से समझाते भी हो और बहुत अच्छे से बोलते भी हो ❤️❤️❤️❤️👑👑👑👑

  • @rajiraji9274
    @rajiraji9274 Год назад

    Waaahhh ! Extraordinary road connectivity

  • @samyakdahale5434
    @samyakdahale5434 Год назад +2

    Is Rs 17000 Cr. only construction cost or (construction + land acquisition cost)?

    • @ravindradaundkar9905
      @ravindradaundkar9905 Год назад +1

      Considering its greenfield and not concrete seems like cost is all inclusive.

    • @ravindradaundkar9905
      @ravindradaundkar9905 Год назад

      @Gotham City Its a greenfield elevated expressway.

  • @chakravarthit.7259
    @chakravarthit.7259 Год назад +1

    From Bangalore to Vijayawada direct express way is really very very urgent need. At least 20-30yrs waiting need it is. There is not direct route now. This is peoples very very long pain it is. Bangalore->Tirupati->Naidupeta->touch the Chennai NH here to reach Vijaywada. This is really very very long (L shape) route & very very time consuming it is. Diagonal connectivity between Bangalore & Vijayawada VERY VERY URGENT need for the people. If not Vijayawada, at least the connectivity should be landed at Chilakaluripeta (or) at least at Ongole. Similarly train route as well should be created along this high way diagonally. Train travel also greatly time consuming between these 2 cities Vijayawada & Bangalore. Since last 23+ yrs i am seeing some day this will happen, so far nobody taken up this. Hope Sri Nitin Ghatkari ji will look into this very very long requirement on high priority. thank you.

  • @InfrastructuraRomania
    @InfrastructuraRomania Год назад +3

    Very interesting content indeed 🔥
    Cheers from Bucharest Romania!!

  • @Juniordatascientist-k8d
    @Juniordatascientist-k8d Год назад +3

    Bro update on Hyderabad-vizag and Hyderabad-raipur expressways 🥺🥺🙏

  • @Ravikalavidh1259
    @Ravikalavidh1259 Год назад

    Is it 4 way each side ( total 8 roads for too & fro ) or 2-2 way each side ( total 4 roads too & fro ) ?

  • @srinuvankadari
    @srinuvankadari Год назад +2

    Great work team please make a video on satellite town ring roads that’s being constructed around bangalore which even Gadkari ji mentioned recently

  • @hafizullaasadulla6490
    @hafizullaasadulla6490 Год назад

    Nice presentation
    Please highlight on tree plantation along side
    Good effort

  • @yahiabhisachhai8025
    @yahiabhisachhai8025 Год назад +1

    Banguluru-mysore expressway ka under construction stretch ka update kaha hai?

  • @nidheesh_ackerman
    @nidheesh_ackerman Год назад +1

    Update on Bangalore Mangalore highway?

  • @harinarayhan6374
    @harinarayhan6374 Год назад

    Gudipalla to mudravayalle,service roads in melpadee,melvantapuram, bannavaram, Tirumalpur, parndur,sunguvarchatram, sriperumbudur, irukattukotti ,ponnamalli etc.

  • @hasnainp
    @hasnainp Год назад +3

    should 262kms take 4 hrs at max speed of 120 kmh?

    • @gjn17
      @gjn17 Год назад +1

      100 is max on highway

  • @VijithAnandh
    @VijithAnandh Год назад

    Great project by the Central Government !

  • @anbaking1247
    @anbaking1247 Год назад +1

    Lets 'thank' the NATURE, TREES, GREENERY, WATER BELTs, AGRICULTURAL LANDs for allowing Humans to lay this road on "THEM". Even this road is possible by means of an Elevated Highway instead of occupying huge acres of land. Well, are we matured to care for the Nature?. All we need is Development and ship the natural resource by tagging it as Economy Booster.
    May Nature Excuse Us and Bless Better Ways to Deal Them

  • @yerramsettydeepak647
    @yerramsettydeepak647 Год назад

    Thank you for making videos of southern metro expressway. Appreciate your team efforts in coverage of video.

  • @chakravarthit.7259
    @chakravarthit.7259 Год назад +1

    From Bangalore to Chennai already 2 best route are there. Putting effort & resourses on 3rd route !! From Bangalore to Vijayawada direct express way is really very very urgent need. At least 20-30yrs waiting need it is. There is not direct route now. This is peoples very very long pain it is. Bangalore->Tirupati->Naidupeta->touch the Chennai NH here to reach Vijaywada. This is really very very long (L shape) route & very very time consuming it is. Diagonal connectivity between Bangalore & Vijayawada VERY VERY URGENT need for the people. If not Vijayawada, at least the connectivity should be landed at Chilakaluripeta (or) at least at Ongole. Similarly train route as well should be created along this high way diagonally. Train travel also greatly time consuming between these 2 cities Vijayawada & Bangalore. Since last 23+ yrs i am seeing some day this will happen, so far nobody taken up this. Hope Sri Nitin Ghatkari ji will look into this very very long requirement on high priority. thank you.

  • @prabhasdhfs
    @prabhasdhfs Год назад

    Just to reduce 70km they are doing this??

  • @rathanapparathanappa5077
    @rathanapparathanappa5077 Год назад +1

    Actual date of completion

  • @arunk7183
    @arunk7183 Год назад +1

    Appreciate Nithin Gadkari...

  • @kanakTheGold
    @kanakTheGold 6 месяцев назад

    Good video. I still do not understand why it will take 4 hours to cover 260 km on a continuous expressway. The 120 km BLR-MYS expressway takes under 80 minutes to cover. So by same maths, BLR- CHN Expressway distance f 260 km should be covered in 2hr 45m to 3 hrs time max (Avg speed of 85-95 kmph). 4 hours is too much for an expressway I believe. May be you'll another 1 hour within Bangalore and another 1 hour within Chennai city cores. So point to point (house to house) will still be 5 Hrs or 5:30 hours if you take a half hour break. Today end to end takes 7-8 hours. S some 2 hours reduce. Would have been better if half time reduced. Still decent, as other 2 routes will et decongested, and this will lead to more economic development.

  • @venkateshavenkatesha9763
    @venkateshavenkatesha9763 Год назад

    We appreciate your effort in showcasing the progress of this Express Way

  • @nato6648
    @nato6648 Год назад +2

    we travel chennai-bangalore in 5 hrs in existing 6 lane road

  • @MrPoornakumar
    @MrPoornakumar Год назад

    Beautiful video. Congrats !

  • @cipherlens
    @cipherlens Год назад +1

    There are some factual errors in the video.
    1. The old madras road (hoskote) route is 334 kms
    2. The Hosur Krishagiri route is 346 km.
    The new highway will also be around 330 km. It starts from Hoskote and connects to Sriperumpadur in the old highway.
    Reaching Hoskote is the biggest challenge. It will take 1.5 hrs from the city. It is not also connected to NICE road which makes it use less for trucks.
    There is no need to construct this new highway. That's why from 8-lane it became 4-lane suddenly

  • @Sri_369
    @Sri_369 Год назад

    Nitin Gadkari sir salutes to you sir🙏🎉 👌👏

  • @srikanthd6436
    @srikanthd6436 Год назад

    Great Info and Nice Coverage through drone

  • @harisheh7001
    @harisheh7001 Год назад +1

    🙏,Please make it a 🛣️ 800 Lane Road Expressway 🛣️ 🔄🔃 with a Limited Speed Limit of 2000Km/Hr-4000Km/Hr.

  • @habeeburrahman541
    @habeeburrahman541 Год назад +7

    First like 🤗

    • @dronemanYT
      @dronemanYT  Год назад

      Bhai Ye to abhi tak public nehi kaya, apko kaise dikha ?

    • @otakuROHIT
      @otakuROHIT Год назад

      @@dronemanYT magic

  • @zahid_h
    @zahid_h Год назад

    Please make a video on Bengaluru and Mangaluru Expressway

  • @DruvRatee
    @DruvRatee Год назад +1

    We need Chennai to Mumbai Expressway!!

    • @kanakTheGold
      @kanakTheGold 6 месяцев назад

      Already Banalore to Pune expressway planned. They're planning to extend it till Mumbai by having bypass at Pune outer. If they link the BLR-CHN expressway to Tumkur road at BLR North (via BLR PRR/ STRR), then yes, you have a Chennai - Mumbai link also.

    • @DruvRatee
      @DruvRatee 6 месяцев назад

      @@kanakTheGold touching Bengaluru is waste of time! It should be via Chennai-Andhra-Pune-Mumbai

  • @vigneshvignesh-wc1ct
    @vigneshvignesh-wc1ct Год назад

    Amenities highway ?

  • @mnarasimha3351
    @mnarasimha3351 Год назад

    Bro ,when was start bangalore to Vijayawada green field highway works?

  • @sarfarazadpodhi
    @sarfarazadpodhi Год назад

    They should also focus on current NH4 express way. Which between Chennai to RANIPET. Roads are really bad here

  • @santoshk7538
    @santoshk7538 Год назад +1

    Nyc1 Bhai 😍

  • @The-TravelNFoodVlogger
    @The-TravelNFoodVlogger Год назад +2

    Great work. Please try to cover surat-chennai economic corridor

  • @chrisfrancis7842
    @chrisfrancis7842 Год назад +1

    Excellent progress. But even if there are 5 lanes on each side, and if 5 trucks or slow paced vehicles use all the 5 lanes parallely, then the purpose of the expressway is lost there. Without bringing out real good lane discipline and driving behavior by us, there is no proper utilization of the expressway.

  • @rajasekhare9573
    @rajasekhare9573 Год назад

    Build under ground tunnels ro carry water, gas, electrical and electronic wires etc for optimal utilisation of highway land

  • @Prakash_Chikkabasava
    @Prakash_Chikkabasava Год назад

    It will connect to peripheral ringroad it won't get direct connection to bengaluru city since to avoid traffic.

  • @GKSUSK
    @GKSUSK Год назад

    Which place is this..

  • @OmPatel-xo4ei
    @OmPatel-xo4ei Год назад

    Delhi Mumbai Expressway ke Sohna se Video series banao 👍 .... Inauguration he so ...Sohna Se Dausa ...Or Dausa se Mumbai tak kab Complete hoga iske liye public Curious hogi ...Or Nitin Gadkari Or NHAI & Gov. Officials ke Nazar me Aane Ka Chance he 👍

  • @917439
    @917439 Год назад +1

    They should have put a parallel high speed railline also, this would have made passenger movement in 1 hr without the need of airline. The express is for freight and cars, highspeed for people movement.

    • @souravchakraborty8861
      @souravchakraborty8861 Год назад

      I think they will, remember there is a provision for extra lanes ...

    • @kanakTheGold
      @kanakTheGold 6 месяцев назад

      @@souravchakraborty8861 Mysore- Bangalore- Chennai Bullet Train route is said to be aligning to some extent with both the BLR- CHN and BLR-MYS Expressways. But project completion is planned in 2051 !

  • @nitinkumar-oo5ox
    @nitinkumar-oo5ox Год назад +2

    Sir raipur vishakha patnm expressway ko bhi cover kro

  • @mohammedabbasraza3881
    @mohammedabbasraza3881 Год назад +1

    Plz NH 69 AND NH 73 TUMKUR SHIMOGA HIGHWAY PLZ

  • @jaynesh123
    @jaynesh123 Год назад

    This expressway should also be linked to Bengaluru mysuru expressway.. it will boost economy at very vast level which one cannot even imagine..

    • @kanakTheGold
      @kanakTheGold 6 месяцев назад

      PRR , if done will do so. It will connect Whitefield/Hoskote through Bommasandra to NICE Toll plaza on Mysore road side and completely bypass Bangalore Est to South to West and cover this distance in about 50 minutes, which currently takes 1.5 - 2 hours.

  • @ChiefMinisterTamilNadu
    @ChiefMinisterTamilNadu Год назад

    Super come fast this work

  • @bakulratanpara037
    @bakulratanpara037 Год назад

    Why 4 hours for 262km? If it’s all expressway with 120km speed limit , it shouldn’t take less then 2.5 hours .

  • @Suresh_Mahato
    @Suresh_Mahato Год назад +1

    Nice shot doremon

  • @sanjayhegde7718
    @sanjayhegde7718 Год назад

    Informative video, Also mention who is the contractor who is building the Roads

  • @manigandanvairam1266
    @manigandanvairam1266 Год назад

    Visionary P. Chidambaram started this project long back.. good that current govt picking it and trying to.complete

  • @shreyasms6786
    @shreyasms6786 Год назад +1

    If possible can you please update Tumkur to Shivamoga 4 lane work progress ?

  • @dhananjaikrishna7347
    @dhananjaikrishna7347 Год назад +1

    What would be the approx time to reach Chennai once completed?