Shivalaya Construction is the contractor for Pkg 16. They were given a 2 yr deadline in 2021 to complete this and it looks like they will take another 2 yrs. So a total of almost 5 yrs for just 27km. This company should be blacklisted.
Absolutely stunning content! Every video brings the beauty of India's National Highways to life. Your stunning visuals and storytelling make me feel like I'm right there on the journey. Keep up the fantastic work! Jay Hind Jay Maharashtra !
I dont understand the reason why companies such as shivalaya construction and roadway solutions are awarded contracts after knowing their pathetic history .Surely lots of politics is involved .Even after so mucb delay ,these companies are not blacklisted yet .
One suggestion... The Red mask you use to highlight a patch, is not effective and we cannot see it clearly, to counter that, you can invert the mask and make rest of the area look like its in shadow (I am talking about black colour and then adjusting It's opacity) & then the area you want to highlight, you can leave it as it is, or increase the exposure or Brightness whichever makes it look better.... Rest, the graphics, text ate top notch... Thanks...❤
This is a major mess that I’m seeing first time on the so-called premier highway. Do you know if Shivalaya, the contractor, is still on this project … or Bhaag Gaya? The way things look today, the highway may not even complete for another 3-4 years. I’m bringing it to the notice of the minister Gadhkari, only he can get things going. Thanks
Btw, I called Nitin Gadhkari’s office. Couldn’t find him there but one of his assistants said they’re familiar with the delays and they’re working on it and things will change soon. Let’s hope they do or will get them to answer again.
I dont understand how planning was done samrudhi marg even if it opens completely but there is no connection from mumbai end and looking at work it will not complete before 2026😢
Bhai eastern expressway hai mumbai me woh bhi wide hi hai... And again thane to bhiwandi to nashik road expansion chal raha hai jo ki direct expressway pe milta hai with various entry points. Mumbai me kya building todenge abhi land acquisition ke liye?😂 Isliye iska solution road expansion hai.
नितिन गडकरी ने कहा है कि कोकण में काम करना सबसे मुश्किल है। लैंड एक्विजिशन करना ही सबसेमुश्किल है। जमीन बहुत थोड़ी थोड़ी लोगों के नाम पर है। उसमें भी कई भी बात होते हैं।
The land-management and laws are from colonial era. No digitization, all corrupt officials and many legal disputes make this even more difficult. The govt. really needs to bring land reforms to accelerate development. These idiots can't even get new owner name on property tax bills automatically after sale of property.
Companies janti hai election hai 😐😐😐,..kauns jeetega uske baad kaam karege... Maharashtra mai pawar ke adamiyo ki companies hai , corruption chalta hai , sab infrastructure projects ruke hue hai,..sab neta corrupt hai,..
Really? Please go check 'China Tofu Dreg Projects', you will understand the reality. Also, people have to accept whatever the government offers. There is option to go to the court and complain if there's an injustice. It's easy to say China is the best.
Droneman we appreciate your efforts. it's sad to see that billion dollar projects like this whether delhi mumbai express way,or wdfc,or samrudhi mahamarg, not getting completed due to some meters of land acquisition.
MR Gadkari ji warned Punjab Govt, stated clearly he will hold or terminate the pending major projects if land was not available. Now What about his own Home state with double engine kin sarkar 😂😂. This is Democracy .😊
इस सड़क के आसपास पास फल (केसर केरी, नींबू, संतरा), सब्जी(भिंडी, प्यास,आलू, टमाटर),भाजी (मेथी , धनिया) मसाला (काली मिर्च),दाल ( चना दाल, मग, मठ ),,,,,, के पौधे लगाए पेट्रोल डीजल का धुवा दाल में आयेगा
Nice video ! as it looks this part of project may take a very long time to complete. If the MVA Congress govt comes to power, all these projects including the bullet train project will be stopped. Very unfortunate.
Public bi land deney mai government ke sath cooperation nahi karti hai or jahan land clearance hai fir political involvement hoti hai that why project are delayed in india
All politicians buy land from locals by using goons etc at low rate and then earn multiple times from govt. rates. Here Pune's civil airport location keeps changing every five years due to same reason. So called IT hub does not have it's own airport. Thanks to all pathetic Maha leaders.
Clearly there are people with vested interest that are creating hurdles in completion of the whole project...shame their contribution in national development is zero
भाई आपके व्हिडिओ बहोत अच्छे होते है. पर मैं बहोत दिनो से एक डिझाईन सर्च कर रहा हू पर मुझे नाही मिल रहा क्या आप उसके बारे मैं व्हिडिओ बना सकते हैं. दिल्ली मुंबई एक्स्प्रेस हायवे पर पॅकेज नंबर 15 मैं जी मुंबई नाशिक हायवे आता है. उसका इंटर चेंग का exact डिझाईन क्या होगा. ऊस पर एक व्हिडिओ बनाओ ना भाई प्लीज
@@dronemanYTTrue. But i think India me kafi sare projects bahut slow speed me chal rahe hai. Don’t know why. Like Bangalore Vijayawada Expressway, Surat Chennai Expressway. Raipur Vizag Expressway. İsme se koi bhi complete nahi hoga 2025 tak.
@@dronemanYTreal fact batau ,,Biden kutta ki loot se all projects slow speed mein hai ,, last 4 year mein Biden kutta ne 32 lakh crore extra loota crude (fuel ) pe. ,,,, trump aayega to kam thoda spreed payega ,,ye bahut deep level ki bat hai ,,
It's very disappointing. Such projects are completed on time in Southeast Asia, like Malaysia, Vietnam, and Thailand. Shame on the government and shame on the contractors. There is no way India can be a developed nation in 2047 with such delays in infrastructure development.
Thanks Droneman for keeping us updated. Great coverage! 👌
While Progress on project is pathetic, drone shots are amazing…you are doing great work!
Thanks a lot!
@@dronemanYT indor Metro train video plz
प्रत्येक व्हिडिओ भारताच्या राष्ट्रीय महामार्गांचे सौंदर्य जिवंत करतो. तुमचे जबरदस्त व्हिज्युअल आणि कथाकथन मला असे वाटते की मी प्रवासातच आहे. विलक्षण काम सुरू ठेवा! जय हिंद जय महाराष्ट्र
अगदी खरे बोललात..👍
होय दादा👍🏻
Shivalaya Construction is the contractor for Pkg 16. They were given a 2 yr deadline in 2021 to complete this and it looks like they will take another 2 yrs. So a total of almost 5 yrs for just 27km. This company should be blacklisted.
They might've purchased some electoral bonds of a particular party that's why this company still isn't blacklisted 🤷🤔
Shivalaya is doing good work @ NH66 Thrissur package; must be local issue
@@Vannu-q5s TMC? DMK? They have the highest electoral bonds per MP in the country.
@@Sankar85 What are you saying?Their work is the most pathetic of all the reached in Kerala. Now I understood why.
@@Juggernaut8519it's the issue in Maharashtra, why mention DMK and TMC here, wth??
Absolutely stunning content! Every video brings the beauty of India's National Highways to life. Your stunning visuals and storytelling make me feel like I'm right there on the journey. Keep up the fantastic work! Jay Hind Jay Maharashtra !
Glad you liked it!
@@dronemanYTVideo editing app name please??
बहुत ही सही जाणकारी दी अपने..
आप ही की video's देखकर मैं byroad video's बनाता हू..
"आपली मराठी" चॅनेल पर..
कल ही एक व्हिडिओ अपलोड किया है.
I dont understand the reason why companies such as shivalaya construction and roadway solutions are awarded contracts after knowing their pathetic history .Surely lots of politics is involved .Even after so mucb delay ,these companies are not blacklisted yet .
Because of electrol bond
Probably they have some connections with ruling governments.
Do you know what electoral bonds were
Thank you Dromeman for all latest updates
The brutal reality is that we dream of competing with China but still are two biggest cities are not connected by expressways.
China is a communist dictatorship. We are a parliamentary democracy with antinational elements seeded in our system. Understand the difference.
One suggestion...
The Red mask you use to highlight a patch, is not effective and we cannot see it clearly, to counter that, you can invert the mask and make rest of the area look like its in shadow (I am talking about black colour and then adjusting It's opacity) & then the area you want to highlight, you can leave it as it is, or increase the exposure or Brightness whichever makes it look better....
Rest, the graphics, text ate top notch...
Thanks...❤
You are doing a tremendous work ❤
Good covering by Drone
Thanks
Thanks🎉 🙏 waiting for next video
Thanks!
This is a major mess that I’m seeing first time on the so-called premier highway.
Do you know if Shivalaya, the contractor, is still on this project … or Bhaag Gaya? The way things look today, the highway may not even complete for another 3-4 years.
I’m bringing it to the notice of the minister Gadhkari, only he can get things going.
Thanks
Btw, I called Nitin Gadhkari’s office. Couldn’t find him there but one of his assistants said they’re familiar with the delays and they’re working on it and things will change soon.
Let’s hope they do or will get them to answer again.
Showing realtime North Direction will be much helpful...
I dont understand how planning was done samrudhi marg even if it opens completely but there is no connection from mumbai end and looking at work it will not complete before 2026😢
Bhai eastern expressway hai mumbai me woh bhi wide hi hai... And again thane to bhiwandi to nashik road expansion chal raha hai jo ki direct expressway pe milta hai with various entry points. Mumbai me kya building todenge abhi land acquisition ke liye?😂 Isliye iska solution road expansion hai.
By road video's "आपली मराठी" यूट्यूब चॅनेल वर आहे..
Drone man चे व्हिडिओ is best .👌
नितिन गडकरी ने कहा है कि कोकण में काम करना सबसे मुश्किल है। लैंड एक्विजिशन करना ही सबसेमुश्किल है। जमीन बहुत थोड़ी थोड़ी लोगों के नाम पर है। उसमें भी कई भी बात होते हैं।
The land-management and laws are from colonial era. No digitization, all corrupt officials and many legal disputes make this even more difficult. The govt. really needs to bring land reforms to accelerate development. These idiots can't even get new owner name on property tax bills automatically after sale of property.
First view is another achievement 😅
🙂
When will you upload nagpur mumbai expressway package 15 and the 16 progress
Bhai tum kisiko support karte ho ? BJP ya khangress?
Sabko lagta hai unka view first view hai😂😂
सर काम को देखते हुए कम से कम 1 साल जरूर लगेगा
Companies janti hai election hai 😐😐😐,..kauns jeetega uske baad kaam karege...
Maharashtra mai pawar ke adamiyo ki companies hai , corruption chalta hai , sab infrastructure projects ruke hue hai,..sab neta corrupt hai,..
Why every project gets delayed in maharashtra earlier bullet train now expressway
Only one word "UDDHAV"
Bahut sundar vidio h aur informative to h hi .. Sir aap itne proper video kaha se late ho
Titwala-Baneli land acquisition is very critical ,
Why and what's problem?
2050 tak kam complete hoga.. Aisa lgta hai muze😂
महाराष्ट्र में नागपुर हैदराबाद एक्सप्रेसवे, संभाजी नगर नांदेड़ हैदराबाद एक्सप्रेसवे, पुणे बेंगलुरु एक्सप्रेसवे पर काम जल्द शुरू होना चाहिए।
Development in Maharashtra on all major infrastructure projects is very slow especially when it comes to in and around Mumbai
That's why China is the best 😍🇨🇳
Really? Please go check 'China Tofu Dreg Projects', you will understand the reality. Also, people have to accept whatever the government offers. There is option to go to the court and complain if there's an injustice. It's easy to say China is the best.
Using a chinese drone for shots like this as well
Video with map will be better understood
Droneman we appreciate your efforts. it's sad to see that billion dollar projects like this whether delhi mumbai express way,or wdfc,or samrudhi mahamarg, not getting completed due to some meters of land acquisition.
Nice coverage
I like your videos .......pls also share a video on current of status of Dahisar (Check Naka) to Virar ....worst condition of ROADS
MR Gadkari ji warned Punjab Govt, stated clearly he will hold or terminate the pending major projects if land was not available.
Now What about his own Home state with double engine kin sarkar 😂😂.
This is Democracy .😊
Bhai shab great job mp border to godhra tak be update dedo
FOCUS ON INCOMPLETE PACKAGES OF DELHI MUMBAI EXPRESS WAY
Maharashtra ke project means extra 10 years leke chalna chaiye😅
Lack of motivation from government
No dear it's all builder is under pressure of sahard pawar under
Nice video - no idea why work is stopped but 😢😢😢
Very good Maharashtra government
Aise hi kam krte rho, jaldi kam ho jayega😊
its not Maharashtra govt.. its central govt
@@hemantsonawane153 Sorry my mistake
First comment finnally
🥰
इस सड़क के आसपास पास फल (केसर केरी, नींबू, संतरा), सब्जी(भिंडी, प्यास,आलू, टमाटर),भाजी (मेथी , धनिया) मसाला (काली मिर्च),दाल ( चना दाल, मग, मठ ),,,,,, के पौधे लगाए पेट्रोल डीजल का धुवा दाल में आयेगा
Jai shree ram only🔥
Very Poor Progress 😊 ..Virar - JNPT Spur ..shayad 2030 tak ban jaye ..NE-4 Should be renammed as Delhi-Baruch Expressway 😊
Hi, Any updates for beyond the Bharuch to Surat ?
Nice video ! as it looks this part of project may take a very long time to complete. If the MVA Congress govt comes to power, all these projects including the bullet train project will be stopped. Very unfortunate.
That’s why political stability is very important. Maharashtra is rotting these days!
Yes BJP is most responsible...anyway Delhi Mumbai expressway is not useful for maharashtra so doesn't matter.
Sir please make videos in 21:9 aspect ratio
Can you please make video on JNPT-Shivare eway section
@Droneman
Please make video on Virar alibaug package18. For seamless connectivity with Pune
Jaha project slow hota hai waha quality mein compromise hota hai
Fast execution mein kainsa quality mil rahan hain?!
2029 ke loksabha election tak ban jayega
दिल्ली मुंबई एक्सप्रेसवेराइट ओके
looks like it going to take another 10 yrs
WE SHOULD COMPLETE DELHI MUMBAI EXPRESS WAY ON MISSION MODE IF WE WANT TO BE SUPER POWER UP TO 2047
bro how and from where do u select the background music
❤
मुंबई से दिल्ली कब ओपन होने वाला है
Everything that passes through Mumbai, gets delayed!!
Muze mere ghar se wagholi se wakad tak express way chahiye😂😂
Public bi land deney mai government ke sath cooperation nahi karti hai or jahan land clearance hai fir political involvement hoti hai that why project are delayed in india
All politicians buy land from locals by using goons etc at low rate and then earn multiple times from govt. rates. Here Pune's civil airport location keeps changing every five years due to same reason. So called IT hub does not have it's own airport. Thanks to all pathetic Maha leaders.
It will be completed by 2029
Clearly there are people with vested interest that are creating hurdles in completion of the whole project...shame their contribution in national development is zero
Bhai sabse bada hurdle land acquisition hota hai ... Ab ye jabardasti delayed lag raha for xyz reason
@@kamalrathod25 Haan, sahi hai, kuch log isme se personal profit ke liye project delay karte hain, a. Ya to paisa chaiye, ya b. Credit
🎉🎉
Effect of land acquisition causing work progress almost stopped
Please cover Atal Setu to costal road connectivity progress.......
Ye nahi ban raha expressway pura... Abandoned ho jayega ye bhi Mumbai Goa Expressway ki tarah
Now please cover MAHSR C3 packages
Plz make update video on kalyan murbad highway
I think this expressway will open just before 2029 loksabh election maybe
Solapur - Ratnagri Highway Update Please 🙏🏼
👍
Want you to make video on amaravathi Andhra Pradesh
@Droneman will there be a exit at this underpass 5:49 (Badlapur village road) ?
Nope..
Kuch to dosti hogi mumbai sa
Also kalyan yard remodeling update
भाई आपके व्हिडिओ बहोत अच्छे होते है. पर मैं बहोत दिनो से एक डिझाईन सर्च कर रहा हू पर मुझे नाही मिल रहा क्या आप उसके बारे मैं व्हिडिओ बना सकते हैं.
दिल्ली मुंबई एक्स्प्रेस हायवे पर पॅकेज नंबर 15 मैं जी मुंबई नाशिक हायवे आता है. उसका इंटर चेंग का exact डिझाईन क्या होगा. ऊस पर एक व्हिडिओ बनाओ ना भाई प्लीज
Bro please remove the hizzing sound during voiceover .It if audible even with background music .
Bhai NH 160 Thane Bhiwandi road widening ka progress video please
Kindly upload kalyan badlapur 3rd 4th rail line update
Dadar, bandra, Andheri से Delhi Mumbai expressway कहां से join होगा, please update 🙏
Looks like you would have to use NH48 to travel till Virar and from there you can get onto Delhi-Mumbai Expressway.
@@vaibhavdlv Thank you 😊
Lagta nhi hai 2025 tak bhi ban paega 😢
Maharashtra me yehi haal hai,, jadatar projects ka
@@dronemanYTBhai Uddhav Thakre ne 2.5 saal sare projects delay kar diye
@@dronemanYTTrue. But i think India me kafi sare projects bahut slow speed me chal rahe hai. Don’t know why. Like Bangalore Vijayawada Expressway, Surat Chennai Expressway. Raipur Vizag Expressway. İsme se koi bhi complete nahi hoga 2025 tak.
@@dronemanYTNot only Maharashtra, Come to gujarat once and you will be shocked to see the stalled and slow work of delhi mumbai expressway.
@@dronemanYTreal fact batau ,,Biden kutta ki loot se all projects slow speed mein hai ,, last 4 year mein Biden kutta ne 32 lakh crore extra loota crude (fuel ) pe. ,,,, trump aayega to kam thoda spreed payega ,,ye bahut deep level ki bat hai ,,
Please give new update of virar to vadodra nd vadodra to godhra
2 saal baad toll
Murbad 📍
This package will be completed in January 2029 just before Lok Sabha elections.
Go Fakirstan
समृद्धि महामार्गराइट का वे
कभी पूरा नहीं होने वाला प्रोजेक्ट
एक से एक बहाने हैं पूरा न होने के
U P me योगी जी के पास होता तो कब का पूरा हो गया होता।
Hi Droneman, where do you stay? Can we meet in-person for a coffee?
It's very disappointing. Such projects are completed on time in Southeast Asia, like Malaysia, Vietnam, and Thailand. Shame on the government and shame on the contractors. There is no way India can be a developed nation in 2047 with such delays in infrastructure development.
India ❌ China ✔️
Contractor ke maa ke death ho gae es leya kaam baad pada ha 😢😢
😂😂😂😂
BKC bullet train station update please 🙏
kolhapur ratnagiri highway ?
Kolhapur people don't want to give land for highways, forget about highways passing through kolhapur
@@shirishherwade6680 bro land acquisition was already done.
Very irresponsible contractor, should be fined
Where is murbad interchange?
Election is the reason?
After assembly elections
भाई, महाराष्ट्र के लोगो को ये सब नाहि चाहीये, BJP क्यू इतना पैसे खर्च कर राही हैं,
,
खर बोलला ,आपली माणस खरच खूप वेडी आहेत त्यांना मुस्लिमांचा पुळका आहे.. विकास आणि हिंदुत्व नाही पाहिजे.. उस्मान ठाकरे, शरदउदिन मिया ला आपल मानतात..😢
Bc Maharashtra ka tax he our tumhara state hamare tax pe chal raha he our tum log bhi
अभी महा वाले घबराये नहीं.. हिमाचल की तरह टॉयलेट टैक्स भी लगेगा...... आने दो कांग्रेस को..... 😂😂😂😂😂😂😂😂😂
@@ashutoshMishra-yb8md aagayi congress to tikegi nhi logo ko sabak milega lock down ka bhule pagal vidharbh marathwada vale
विकास नहीं होना तो गडचिरोली जिला में जाकर रहे वहा पर विकास नाम की कोई चीज नही है😊😊😊😊😊😊
Can someone be kind enough to tell me what soundtrack this is?
Bill pass nahi huvna rahenga,sab ka comission calculation ho rha hai
Mota moti kaha jaye to kamm bilkul nahi ho raha hai, Maharashtra Mai sabhi project slow chal raha hai...