Thanks for the timely updates about national highways.I have to regularly commute by car from my home at Baranagar and my place of posting at Ranaghat.I regularly take Dunlop->Belghoria->Nimta>kalyani Expressway> Kampa> Jaguli>NH34 route .the only problem is between kampa and Jaguli and sodepur Nimta.otherwise the road is now in very good condition.I would have been very happy had there been a flyover communicating kampa more to jaguli.please do share any update regarding this part of the road.
Thanks! Actually, the Kampa interchange flyover (6+ km long) for connecting NH-12 is now ready and all set to open anytime! So very soon, you will be able to take this mega flyover directly from Kalyani Expressway. I discussed about it in this video: ruclips.net/video/UOBYO8tHy4E/видео.html
Amar bari sontoshpurer kachei amake niyomito jatayat korte hoi nh12 diye kintu rajberia por theke rasta chomotkar holeo , rajberia theke sontoshpur obdi rashtar obostha khub valo noi tar sathe temni jam hoi garir goti 35km/ hr beshi hoi na er sondher por obostha ero traffic ero chap aro bare,apnar information ta sune anondo pelam asha kori khub dhrutoi kaaj suru hobe .
Happy new year! Map e to underpass er location Adhata High School er pashe dekhache. Apanar oi duto crossing er majhe! Tabe kaj shuru hole, ektu edik odik hote pare. Best.
Fully agree. Oi railgate o tar ashe pasher jaigar kichu na korte parle, somosya aro barbe. Ei muhurte oi 2.5 km niye kono plan er byapare amar jana nei. Best wishes.
Belgharia expressway ar kalyani expressway r jonno j connecting flyover ta toiri hoche sei rastai akta bari niye akhon o case cholche tat kono update ache kin?
Haan, eta amar plan e ache. Ekhon 2 ta tender i award hoe geche. Eder modhye Falakata -Salsalabari Section (Package II-A, 41 km) er kaj peyeche Dhatarwal Construction/PRL (JV). Ar Dhupguri - Falakata (Package II-B, 29 km) er kaj peyeche: S&P Infra/Skylark Infra (JV). Best.
Dada kalyani more theke iskon gechilam ei road diye ,, road bhalo no doubt but prochur more achhe rastay jekhane national highway te barricade kora for local traffic which is very very bad for fast moving traffic ,, sob kotay over bridge ba flyover dorkar chilo ,, moreover access control o nei with proper service lane ,, in comparison Kalyani expressway is a marvellous piece of construction n way better than NH12
Thanks! Eta amar plan e ache. Ami age eta niye alochona korechilam ruclips.net/video/EzGxBWcKeZQ/видео.html. Ekhon sudhu Binnaguri Bypass (Fulbari) te 5.1 km er tender baki ache. Baki part er contract award hoye geche.
Dada NHAI er biruddhe abhijog jananor upay bolun. Siliguri r Fulbari theke Jalpaigudi jaower NH e matro 2 km rasta bohu bochor 4 lane kora hocche na. Ebar complain korte hobe😢
আপনি যে এই তথ্য গুলো তুলে ধরেন, আপনার কাছে কি আগে কত সময় লাগত আর এখন কত লাগছে/লাগবে সেই তথ্য আছে? কারণ Google maps এ দেখলে কিন্তু সময়ে কোনো পরিবর্থন দেখা যায় না!
এই কাজের সরকারী সময় সীমা মাত্র ১৮ মাস। যেহেতু এখানে বড় কোনও নদী ব্রিজ নেই। তবে হাতে কলমে ২-৩ বছর সময় ধরে রাখা ভাল, দেখা যাক। প্রসঙ্গ ক্রমে জাগুলী - কৃষ্ণনগরের (৬৭ কিমি) নতুন কাজ শেষ হতে চার বছর লাগল (Sep 2020 তে KCC নতুন করে কাজ শুরু করেছিল)।
গোলাম দা এক নম্বর থেকে বারাসাত অবধি তিন টে বড় ক্রসিং দোলতলা, ডাক বাংলো, মধ্যমগ্রাম এখানে এখন যা জ্যাম হয় তাতে এখানে ওভারব্রীজ না হলে কোনো দিনও NH 34 Kalyani express way এর সমকক্ষ হবে না।
Oi road tar onk issue ache oi issue nah mitle kaj start holeo abr stop hoye jabe Tr moddhe 1st land accusation, r public land er valuation, then ai road kaj start korle diversion er kono jaiga nei so amr mone hoy onk time lagbo sob kichu mitmat hoye complete hote
@@mr.rohitchowdhury3082 Ebr Madhyamgram, Barasat er gari gulo ki vbe jabe? Truck nah hoy chole jabe Barasat thk 87 bus chole Borojaguli obdhi seta ki vbe jabe?
Murshidabad e total 3 te notun flyover/over-bridge hobe. Ami amar ager video te eta niye alochona korechilam: ruclips.net/video/UOBYO8tHy4E/видео.html Best,
পরিষ্কার দাদা। সুন্দর বিশ্লেষণ। আপনার ভিডিওমানেই আলাদা। Congrats
অনেক অনেক ধন্যবাদ। শুভেচ্ছা সহ।
❤ একটা গুরুত্ব পূর্ণ তথ্য প্রদানের জন্য ধন্যবাদ।
অনেক ধন্যবাদ। শুভেচ্ছা সহ।
অসাধারণ উপস্থাপনা!
অনেক ধন্যবাদ। ভাল থাকবেন।
Dada apnar video khub bhalolage...... Onek Subhokamona roylo apnar ar apnar poribarer jonno.....
Onek onek dhonyobad, shubheccha roilo.
Sir, you're most trustworthy RUclipsr ❤
Many thanks. With best wishes.
@GolamMHossain
Sir, my humble request Plz NH27 in North Bengal er Situation ta Discuss korar jonno
খুব গুরুত্বপূর্ণ তথ্য । ধন্যবাদ।
ভাল থাকবেন, শুভেচ্ছা সহ।
Very much informative, thanks.
Thank you so much. Best wishes.
খুব সুন্দর তথ্য জ্ঞাপন!
অনেক ধন্যবাদ, শুভেচ্ছা সহ।
আমার ক্ষেত্রে কল্যানী হাইওয়ে বরজাগুলি মুরাগাছা রাস্তা ই ভালো কারণ ইছাপুর থেকে এটাই ভাল। অনেক দিন বাদে আপনার আপডেট পেলাম। অবশ্য আপনার ভ্রমন আপলোড গুলো দেখেছি। ভাল লেগেছে। অগ্রীম শুভনববর্ষের শুভেচ্ছা রৈল আপনার পরিবার ও আপনার জন্য। ভাল থাকবেন।ধন্যবাদ
আপনার মন্তব্য পড়ে খুব ভাল লাগলো। শুভেচ্ছা সহ।
Apnar information er jonno wait kore thaki
Onek dhonyobad! Bhalo thakben.
Not bad as a proposal. I hope the merge ramps in NH-12 are done properly. Some of the merge ramps in Kalyani Expressway are not very well done.
Wish u happy new year... watching u for last 4 years... every time enriching 😊
Onek onek dhonyobad. Best wishes for the new year!
Darun hoyeche video ta...thank you
Welcome, best wishes.
Thanks for the timely updates about national highways.I have to regularly commute by car from my home at Baranagar and my place of posting at Ranaghat.I regularly take Dunlop->Belghoria->Nimta>kalyani Expressway> Kampa> Jaguli>NH34 route .the only problem is between kampa and Jaguli and sodepur Nimta.otherwise the road is now in very good condition.I would have been very happy had there been a flyover communicating kampa more to jaguli.please do share any update regarding this part of the road.
Thanks! Actually, the Kampa interchange flyover (6+ km long) for connecting NH-12 is now ready and all set to open anytime! So very soon, you will be able to take this mega flyover directly from Kalyani Expressway. I discussed about it in this video: ruclips.net/video/UOBYO8tHy4E/видео.html
সমৃদ্ধ হলাম ❤
ধন্যবাদ। ভাল থাকবেন।
Nice explanation
I appreciate it. Thanks!
Very informative video
very good presentation
Thanks a lot! Best wishes.
Please provide construction updates on new Farakka bridges.
I had discussed it in my previous video: ruclips.net/video/UOBYO8tHy4E/видео.html
Presently, last 5 spans are pending for Siliguri-bound lane. Best.
Darun Laglo Dada, eto spasto korey bojhalen. Kintu proshno ekta thakloi, koto diney hobey? 🙂🙂🙂Annano Rajey Koto Sundor Rastha Hochey, Ebong Druto Shokharey, Khali Paschim Bonger Khetre Boddo Dhilemi Hoy. Bhalo Thakben Apnara Sabai.
Top class as usual!
Thanks a lot!
Amar bari sontoshpurer kachei amake niyomito jatayat korte hoi nh12 diye kintu rajberia por theke rasta chomotkar holeo , rajberia theke sontoshpur obdi rashtar obostha khub valo noi tar sathe temni jam hoi garir goti 35km/ hr beshi hoi na er sondher por obostha ero traffic ero chap aro bare,apnar information ta sune anondo pelam asha kori khub dhrutoi kaaj suru hobe .
Apnar comment pore bhalo laglo. Asha kori ebar kaj shuru hobe. Best.
Thx Golam for the information
Welcome! Best wishes.
Happy new year Dada, Dada Adhata more na Adhata gourbanga road a flyover hba please map dakha ektu janaben
Happy new year! Map e to underpass er location Adhata High School er pashe dekhache. Apanar oi duto crossing er majhe! Tabe kaj shuru hole, ektu edik odik hote pare. Best.
অপূর্ব বিবরণ আপনার । সব সুন্দর ভাবে বোঝা গেল । কল্যাণী এক্সপ্রেস ও কি NHAI তৈরী করছে ?
ধন্যবাদ। কল্যাণী এক্সপ্রেসওয়ে রাজ্য সরকারের WBHDCL (পশ্চিমবঙ্গ সড়ক উন্নয়ন নিগম) অধীনে তৈরি হচ্ছে।
" Kobe ebong kotodine " Onshoti asol kotha.
:-)
Krishnanagar to Baharampur er majheo 5 ta single lane ache, oi kaj ta j kobe sesh korbe ke jane
Tabe etar kaj abar shuru hoyeche.
@@GolamMHossaindebagram er road kobe hobe dada 😢
Thank You So Much
You are welcome. Best wishes.
Rail overbridge na hole eta ekta bishal boro bottleneck tairi korbe sir. Oi discrete।portion ta niye ki kono update ache?
Fully agree. Oi railgate o tar ashe pasher jaigar kichu na korte parle, somosya aro barbe. Ei muhurte oi 2.5 km niye kono plan er byapare amar jana nei. Best wishes.
Thanks sir for reply@@GolamMHossain
@@sanjoysaha3228 Okhane kichu হবে না dada Impossible 4 lane banano ওখানে
Barasat city puri Tai flyover connect kare cross karate habe
@@biswajit.chakraborty Okhane Flyover Possible বলে to amr মনে হয় না
Best route MADHYAMGRAM.MURAGACHA.KALYANI EXPRESSWAY.
Belgharia expressway ar kalyani expressway r jonno j connecting flyover ta toiri hoche sei rastai akta bari niye akhon o case cholche tat kono update ache kin?
Latest kono update nei, case ekhono cholche.
Ai kajti kon company peyeche dada bolben ektu...
Mukherjee Associates Infra
Very good good information Sir
Thank you so much! Best wishes.
Golam da, Akankkha more theke Doltala (Airport bypass) je 4 lane houar kotha setar kono update ache?
Na, amar kache kono update nei. Best.
Thank you for details and good information. Expected date of commencement?
Aage 9th December shunechhilam, ekhon sunchhi 2nd Jan theke shuru hote paare.
Kichu pre-construction activities (soil testing, earth-work measurement etc) er kaj kichu din agei shuru hoyeche.
What about Barasat to Bongaon I.e Jessore Rod
Ei rasta full 4-laning er ekhon kono plan nei. Tabe rail-over-bridge gulo hobe.
Dada jessore road er somprosan er kaj kobe theke habe?
Ekhon Jessor road er 4-laning er ar kono plan nei. Tabe rail-over-bridge gulo hobe.
Thanks for the information .
Best wishes.
ha valo legace. like koreci. subscription to age e koreci.
অনেক ধন্যবাদ।
Very good video...👍👍
Thanks so much!
dada road er sathe rail er o update dile valo hoi
Asole, rail er update ami oto bhalo jani na.
Santoshpur er por ki hobe Maddhamgram obdi ???
Unfortunately, apatoto ei 17 km (Santoshpur-Jaguli) chara baki ongsher jonyo kono plan nei ekhon.
Siliguri to Kolkata link road কত দূর?
Kaj kobe theke suru hobe bolte parben?
Kichu din age company pre-construction er kaj (soil-testing, etc) shuru koreche.
খুব ভালো খবর
khub sundor
Thank you!
Estimated time to complete? Any idea.
Officially, it's just 18 months!
@GolamMHossain let us see.
Dada kaj to suru hoi e na, r holeo kaj bondho kore dichhe local public,anek issue ache,kaj kobe suru hobe ektu final janan pls
Belgharia-Kalyani Exp Flyover akta Lane ki age chalu hobe ???
Muragacha te akta lane chalu hoyeche....r ota kodin late hbe
Muragacha Flyover ta jani
Haan, Kalyani-bound flyover age chalu hobe. Oi baki bari duto bhangte deri hole, second flyover (Kolkata-bound) er kaj e deri hobe.
Bari duto kobe vangbe ? official status ki ?
@avijitdas5 আমাদের ভাঙতে হবে ওরা লড়াই করুক
Dhupguri falakata alipurduar salsalabari bypass niye video banan akta
Haan, eta amar plan e ache. Ekhon 2 ta tender i award hoe geche. Eder modhye Falakata -Salsalabari Section (Package II-A, 41 km) er kaj peyeche Dhatarwal Construction/PRL (JV). Ar Dhupguri - Falakata (Package II-B, 29 km) er kaj peyeche: S&P Infra/Skylark Infra (JV). Best.
@GolamMHossain আচ্ছা ধন্যবাদ
কিন্তু ভিডিও চাই 🤣
Kaj ta complete kobe hobe ETA kichu ache
Sorkari bhabe ei kajer somoy seema matro 18 mas. Tabe actual kobe kaj sesh hobe seta bola mushkil. Best.
Dada kalyani more theke iskon gechilam ei road diye ,, road bhalo no doubt but prochur more achhe rastay jekhane national highway te barricade kora for local traffic which is very very bad for fast moving traffic ,, sob kotay over bridge ba flyover dorkar chilo ,, moreover access control o nei with proper service lane ,, in comparison Kalyani expressway is a marvellous piece of construction n way better than NH12
Fully agree. However, any upgrade is better than the current shape of NH-12 in this part. Best wishes.
কোলকাতা এয়ারপোর্ট থেকে কল্যানী এক্সপ্রেসওয়ে পর্যন্ত রাস্তা টা একটু বললে খুব উপকৃত হব।
এখন Airport - NH12 - Mdhyamgram Chowmatha - Sodpur Muragacha - Kalyani Expressway neo bhalo hobe.
Sir, একটা request North Bengal এ NH27 এর অবস্থা ওপর একটা আপডেট দিলে খুব ভাল হতো 🙏
Plz Sir 🙏
Thanks! Eta amar plan e ache. Ami age eta niye alochona korechilam ruclips.net/video/EzGxBWcKeZQ/видео.html. Ekhon sudhu Binnaguri Bypass (Fulbari) te 5.1 km er tender baki ache. Baki part er contract award hoye geche.
@@GolamMHossain 🙏
NH116A এর update janaben sir
Haan, eta niye ekta video asbe. Second round tender o close hoye geche ekhon.
Notun kono toll er sombhona achhe ki dada ei phase e ?
Ar notun toll plaza hobe na. Tabe ei kaj sesh hoar por, ei part er toll Kalyani More e toll plazar total amount bariye debe. Best.
Dada NHAI er biruddhe abhijog jananor upay bolun. Siliguri r Fulbari theke Jalpaigudi jaower NH e matro 2 km rasta bohu bochor 4 lane kora hocche na. Ebar complain korte hobe😢
@@ayonarupmoitra2200 Mahanada Barrage par করে jeta সেটার kotha bol6an ??
@mr.rohitchowdhury3082 Otao hoyeni... Fulbari theke Mahananda barrage obdi rasta khub kharap. R Fulbari theke Jalpaigudi jawar jonno Gondar more obdi rasta 2 lane, tarpor 4 lane suru hoy
@@ayonarupmoitra2200 Accha Coachbehar obdhi ki 4 lane Complete?
@@ayonarupmoitra2200 Coachbehar obdhi 4 Lane koto ta baki?
@@ayonarupmoitra2200Ota notun tender kora hoyechhe, kaaj shuru hobe kichhu din pore.
Dada kaj kobe thake suru hobe ?
Taratari shuru hoye jaoa uchit. Kichu din age contractor pre-construction activity, soil-test etc koreche. Tai ar khub beshi deri hoa uchit noi. Best.
Second farakka bridge er update din
আপনি যে এই তথ্য গুলো তুলে ধরেন, আপনার কাছে কি আগে কত সময় লাগত আর এখন কত লাগছে/লাগবে সেই তথ্য আছে? কারণ Google maps এ দেখলে কিন্তু সময়ে কোনো পরিবর্থন দেখা যায় না!
এই রাস্তায় এখন যা ট্রাফিক থাকে তাতে গড়ে ৪৫ মিনিট লাগে। আর এই কাজ শেষ হওয়ার পর ১৫ থেকে ২০ মিনিট লাগবে। শুভেচ্ছা সহ।
সবই তো বুঝলাম কিন্তু সড়ক সম্প্রসারণ এর কাজ কবে থেকে শুরু হবে আর কাজ শেষ এর সময়সীমা কত দিন দেওয়া হয়েছে??
😊❤❤
এই কাজের সরকারী সময় সীমা মাত্র ১৮ মাস। যেহেতু এখানে বড় কোনও নদী ব্রিজ নেই। তবে হাতে কলমে ২-৩ বছর সময় ধরে রাখা ভাল, দেখা যাক। প্রসঙ্গ ক্রমে জাগুলী - কৃষ্ণনগরের (৬৭ কিমি) নতুন কাজ শেষ হতে চার বছর লাগল (Sep 2020 তে KCC নতুন করে কাজ শুরু করেছিল)।
❤
দাদা nh 116a এর আপডেট দেন
Haan, debo. Ekhon second round tender closed hoyeche.
J kota jai gai over bridge hocche tar tolai voot a bas korbe
ONEK VALO INFORMATION
ডালখোলা থেকে শিলিগুড়ি যাওয়ার রাস্তার অবস্থা খুব খারাপ , এটা নিয়ে একটা ভিডিও করুন দাদা যাতে সরকারের নজরে আসে
গোলাম দা এক নম্বর থেকে বারাসাত অবধি তিন টে বড় ক্রসিং দোলতলা, ডাক বাংলো, মধ্যমগ্রাম এখানে এখন যা জ্যাম হয় তাতে এখানে ওভারব্রীজ না হলে কোনো দিনও NH 34 Kalyani express way এর সমকক্ষ হবে না।
ঐ রুটে মেট্রো রেলের কাজ হবে এবং কাজ শেষ না হওয়া পর্যন্ত ফ্লাইওভারের কাজ শুরু হবে না।
একদম একমত। দুর্ভাগ্যবশত, এই অংশগুলির জাতীয় সড়কের জন্য আর নতুন কোনও পরিকল্পনাও নেই।
হোক।
কল্যাণী এক্সপ্রেস ওয়ে দিয়ে তো সুনদরভাবে বড়জাগুলী পৌছান যাচছে কোলকাতা থেকে । তাই NH 12 সম্প্রসারণ নিয়ে কোন চিন্তা নেই ।
হ্যাঁ, একদম। তবে NH-12 এর এই বাকি কাজটা হলে ভাল।
Onek fast kaj howa dorkar , west bengal onek pichiye, ei tuk tuk kaj hole kono din o up to the mark asbe na
Ekmot. Lets hope for the best.
Oi road tar onk issue ache oi issue nah mitle kaj start holeo abr stop hoye jabe
Tr moddhe 1st land accusation, r public land er valuation, then ai road kaj start korle diversion er kono jaiga nei so amr mone hoy onk time lagbo sob kichu mitmat hoye complete hote
@sudiptomukherjee4685 Kalyani Highway এর NH12 connector jodi open hoya jay tle Direct Traffic ওখানে shift hobe
@@mr.rohitchowdhury3082 Ebr Madhyamgram, Barasat er gari gulo ki vbe jabe?
Truck nah hoy chole jabe
Barasat thk 87 bus chole Borojaguli obdhi seta ki vbe jabe?
@@sudiptomukherjee4685 Tader adjust korta hobe jemon aga hoto onek তাই Traffic Ease hoto jodi Kalyani Highway complete hoye jay
দাদা সন্তোষ পুর মোড়ে ওভার ব্রিজ হবেনা?
না, এই টেন্ডারে হবে না।
Malda, Murshidabad a flyover na thakai prochur time waste ho66e.kono valo khobor ki a6e?
Bhabta RO.B'r 1 maash aage kaaj shuru hoyechhilo, kintu ojana karone abar bondho hoye gechhe.
Murshidabad e total 3 te notun flyover/over-bridge hobe. Ami amar ager video te eta niye alochona korechilam: ruclips.net/video/UOBYO8tHy4E/видео.html