Wow! Nice compilation! Your camera angles on the shots and the camera work and quality were all amazing! Also, around what time of the day did you record these? Because I'm trying to take the Eglinton East bus home everyday afterschool, and I never see them testing the LRT.
Is it just me or why do I want all the LRTs to use Toronto gauge? Some reason it annoys me that the streetcars and LRT have different track guages, because that also means streetcars can't run on the LRT and have it as a LRT and streetcar line(s)
@@andrewisvrycool they can connect line 5 easily to Bathurst and St Clair by ~3 months of construction therefore connecting all the system tho and use line 1’s tracks to get the streetcars to line 6 though it’s unrealistic.
Love the style they did with these trains
Same~ Looks like the LRT in Kitchener!
These are Alstom transportation ion lrts formally bombardier
Wow! Nice compilation! Your camera angles on the shots and the camera work and quality were all amazing! Also, around what time of the day did you record these? Because I'm trying to take the Eglinton East bus home everyday afterschool, and I never see them testing the LRT.
Thanks so much! I had a PA day that day so I went around lunch to film, usually there are a lot of them out and about in the east end all the time
Nice, good to know!@@Transit_80
When will the ttc line 5 open me: when the sun explodes or when pigs fly or both
And just think some time around 2098 people will actually get to ride on them
World’s most expensive model trains.
W video
Thanks so much!
is this done yet!? 😂
The latest I've heard is it should be running with passengers this spring (this didn't come from from Metrolinx and spring is over on June 21)
💕Wow💚💚🧡💚💚💚💚
Why do you not use the train station in the intersection?
The line is not open to the public, these are test trains
Is it just me or why do I want all the LRTs to use Toronto gauge? Some reason it annoys me that the streetcars and LRT have different track guages, because that also means streetcars can't run on the LRT and have it as a LRT and streetcar line(s)
That would be great but the Line 5 tracks and streetcar tracks are not connected either way so
@@andrewisvrycool they can connect line 5 easily to Bathurst and St Clair by ~3 months of construction therefore connecting all the system tho and use line 1’s tracks to get the streetcars to line 6 though it’s unrealistic.
If that’s how slow they move then how many billions of $ were utterly wasted?
Not in Service. No kidding....