  • Here's an exciting progression video of a team at Barrows Excavation building an electrical substation for Carroll Electric in Decatur Arkansas.
    Filmed October 2018 - August 2019
    Created by Mead Media

Комментарии • 5

  • @zachary_smith1
    @zachary_smith1 Год назад +2

    thanks for this

  • @raffywanas3116
    @raffywanas3116 Год назад

    im amazed on that transformer alone 🤩🤩

  • @johnnyelectric7572
    @johnnyelectric7572 Год назад +1

    Beautiful.

  • @ashton09ify
    @ashton09ify 2 года назад

    Can you say induced voltage . No grounds. More then likely that’s at least 115 running along aside there

  • @bdblazer6400
    @bdblazer6400 2 года назад

    no oil catch baisn