P.P. O'Connor M55 Becconsall Bridge Demolition
HTML-код
- Опубликовано: 30 окт 2024
- The demolition of the Becconsall Footbridge over the M55 was carried out over a weekend closure on the 21str January 2022. P.P. O’Connor worked collaboratively with Costain and City Deal. The bridge was taken down safely, accident and incident free within 24 hours resulting in the motorway opening 26hrs ahead of programme.