G+4 Building designing as per DEWA Regulation---Part-7 || SMDB DESIGNING
HTML-код
- Опубликовано: 7 фев 2025
- Distribution of light load inside flats and Common Area
Distribution of power load inside Flats and Common Area
Circuit formation of light and power load
HVAC load distribution and circuit formation
Plumbing load
fire fighting load
load schedule preparation of FDB
load schedule preparation of SMDB's.
oad schedule preparation of MDB
SLD preparation
load cand preparation
Voltage drop calculation
stand by Generator Rating Calculation
Transformer size calculations
#dewa #dewa19 #dewa #design #g+4 #regulation2017 #regulation
• What is prospective fa...
• How to size earth cont...
Well explanation. Please keep making lectures of Electrical Design topics. Thanks a lot.
Keep going
Great videos ♥️
Great video. Waiting for the rest of the series
Sir, request to please upload new more videos on electrical like earthing, network TT TN system and more on electrical measurement at SS, Testing and commissioning...
For the last 5 months no one video has been uploaded
Sir, your videos on electrical are best of the best knowledge on practical
Good video and very useful
Glad you think so!
I am waiting for your next videos
❤
great video Kindly make video of Testing and Comissionong
useful vedio sir
Good video
Thanks.... Any specific load limit for DB, SMDB? Suppose if we have to provide another SMDB after a particular load. Pls reply..
Please upload other parts of this series.....!!!!!
Please explain what is the main difference between MDB and SMDB
And why it is important to use SMDB?
Hai brother
Thanks for you valuable vedio.
What is your openion about Etap software.Is it necessary for all electrical design engineers.
You must require when working in switchgear panel manufacturing and distribution company in other Electrical field not so important like in construction. Just need basic information how to read and understand the sLD
Electrical site engineer or engineer interview questions make videos on this topic
Bro dm electrical engineer test and dewa electrical engineer test both are same or different
Please inform
Load side Neutral wire should be provided with any kind of protection or not ??
Protection like it pass through mcb, elcb ...
Waiting for the remaining portion
Hai eid Mubarak..sir, i am a electrical engineer my experience are only in villa project... I want go next step to learn in electrical..pls guide me to want i to do...next..your vedio is useful to me...
Thanks, after EID W
I will post other balance designing video
@@electricalconcept32 thank u sir
Number1
Kindly update the transformer LT side to MDB cable calculation, which means running cable calculation.
High-rise building the transformer KVA rating is more.
I want to know if the no.of cables will be connected to MDB.
Because of some places will come 7, 11, 15 running cable. I want yo know this calculation.
Kindly post mdb designing as well
Bro thr is 16A breakrvalso right? Then why did u select 20Amp breakr for 13amp current
Please upload part - 8
Please upload balance video
Itz already more than 6 months....no part 8 video released bro
Sir As per DEWA ... when the total connected load is less than 12kw, so, we can use a single phase only for that ...
Am i right?
It is wrong concept
I also point it out bro and it matters other explanation is perfect
After watching your design videos , can I clear interview in dubai for role of electrical engineer?
There are 100 things in electrical designing, my video will surely help you in interview but after watching my video, you will clear the interview it won't be the case. Keep learning
Where are you bro? I hope you will be fine, we are still waiting
Pls upload new vedio
dB L1 calculation is should be . You taken √3 in 3.35 KW. Which is single phase
Formula should be like
I = 3.35*1000/415*0.8
I consider that DB is three phases. As the load on that DB is from a different phase . As you wrote single phase formula then the voltage must be 220 voltage, not 415v
Your What you experienced in life
Low current load no add
Please upload part - 8