  • Distribution of light load inside flats and Common Area
    Distribution of power load inside Flats and Common Area
    Circuit formation of light and power load
    HVAC load distribution and circuit formation
    Plumbing load
    fire fighting load
    load schedule preparation of FDB
    load schedule preparation of SMDB's.
    oad schedule preparation of MDB
    SLD preparation
    load cand preparation
    Voltage drop calculation
    stand by Generator Rating Calculation
    Transformer size calculations
    #dewa #dewa19 #dewa #design #g+4 #regulation2017 #regulation
    • What is prospective fa...
    • How to size earth cont...

Комментарии • 42

  • @moekyawthu8379
    @moekyawthu8379 2 месяца назад +1

    Well explanation. Please keep making lectures of Electrical Design topics. Thanks a lot.

  • @mohammednagy7516
    @mohammednagy7516 6 месяцев назад

    Keep going
    Great videos ♥️

  • @asadsalim1914
    @asadsalim1914 8 месяцев назад +1

    Great video. Waiting for the rest of the series

  • @ElectricianShorts
    @ElectricianShorts 4 месяца назад

    Sir, request to please upload new more videos on electrical like earthing, network TT TN system and more on electrical measurement at SS, Testing and commissioning...
    For the last 5 months no one video has been uploaded
    Sir, your videos on electrical are best of the best knowledge on practical

  • @naserkhan313
    @naserkhan313 10 месяцев назад +1

    Good video and very useful

  • @awaisnawaz9902
    @awaisnawaz9902 9 месяцев назад +1

    I am waiting for your next videos

  • @muhammadabdullah4996
    @muhammadabdullah4996 5 месяцев назад +1

  • @ashfaqahmed-jh1yu
    @ashfaqahmed-jh1yu 8 месяцев назад +1

    great video Kindly make video of Testing and Comissionong

  • @dinakaransabari7600
    @dinakaransabari7600 10 месяцев назад +1

    useful vedio sir

  • @kv848
    @kv848 10 месяцев назад +1

    Good video

  • @LARRY-xc7ss
    @LARRY-xc7ss 2 месяца назад

    Thanks.... Any specific load limit for DB, SMDB? Suppose if we have to provide another SMDB after a particular load. Pls reply..

  • @Baba_trading
    @Baba_trading 9 месяцев назад

    Please upload other parts of this series.....!!!!!

  • @naserkhan313
    @naserkhan313 10 месяцев назад +1

    Please explain what is the main difference between MDB and SMDB
    And why it is important to use SMDB?

  • @mohamedriyas449
    @mohamedriyas449 5 месяцев назад +1

    Hai brother
    Thanks for you valuable vedio.
    What is your openion about Etap software.Is it necessary for all electrical design engineers.

    • @electricalconcept32
      @electricalconcept32  5 месяцев назад

      You must require when working in switchgear panel manufacturing and distribution company in other Electrical field not so important like in construction. Just need basic information how to read and understand the sLD

  • @saiyadansari2333
    @saiyadansari2333 Месяц назад

    Electrical site engineer or engineer interview questions make videos on this topic

  • @balaraju1113
    @balaraju1113 6 месяцев назад

    Bro dm electrical engineer test and dewa electrical engineer test both are same or different
    Please inform

  • @ElectricianShorts
    @ElectricianShorts 10 месяцев назад

    Load side Neutral wire should be provided with any kind of protection or not ??
    Protection like it pass through mcb, elcb ...

  • @lateefuddin367
    @lateefuddin367 5 месяцев назад

    Waiting for the remaining portion

  • @dinakaransabari7600
    @dinakaransabari7600 10 месяцев назад +1

    Hai eid Mubarak..sir, i am a electrical engineer my experience are only in villa project... I want go next step to learn in electrical..pls guide me to want i to do...next..your vedio is useful to me...

  • @rizwansakhawat5325
    @rizwansakhawat5325 6 месяцев назад

    Number1

  • @jaysankar7534
    @jaysankar7534 3 месяца назад

    Kindly update the transformer LT side to MDB cable calculation, which means running cable calculation.
    High-rise building the transformer KVA rating is more.
    I want to know if the no.of cables will be connected to MDB.
    Because of some places will come 7, 11, 15 running cable. I want yo know this calculation.

  • @shifasm5321
    @shifasm5321 9 месяцев назад

    Kindly post mdb designing as well

  • @Vicky32334
    @Vicky32334 3 месяца назад

    Bro thr is 16A breakrvalso right? Then why did u select 20Amp breakr for 13amp current

  • @mallicksaif0079
    @mallicksaif0079 6 месяцев назад

    Please upload part - 8

  • @TalesbyMukesh
    @TalesbyMukesh 5 месяцев назад

    Please upload balance video

  • @ahamedsyed1194
    @ahamedsyed1194 3 месяца назад

    Itz already more than 6 months....no part 8 video released bro

  • @hussainahmad8403
    @hussainahmad8403 10 месяцев назад +1

    Sir As per DEWA ... when the total connected load is less than 12kw, so, we can use a single phase only for that ...
    Am i right?

  • @THE_MATHS_PAPA
    @THE_MATHS_PAPA 10 месяцев назад +1

    After watching your design videos , can I clear interview in dubai for role of electrical engineer?

    • @electricalconcept32
      @electricalconcept32  10 месяцев назад

      There are 100 things in electrical designing, my video will surely help you in interview but after watching my video, you will clear the interview it won't be the case. Keep learning

  • @awaisnawaz9902
    @awaisnawaz9902 5 месяцев назад

    Where are you bro? I hope you will be fine, we are still waiting

  • @harikrishnan2404
    @harikrishnan2404 8 месяцев назад

    Pls upload new vedio

  • @asmoin6922
    @asmoin6922 10 месяцев назад +1

    dB L1 calculation is should be . You taken √3 in 3.35 KW. Which is single phase
    Formula should be like
    I = 3.35*1000/415*0.8

    • @electricalconcept32
      @electricalconcept32  10 месяцев назад

      I consider that DB is three phases. As the load on that DB is from a different phase . As you wrote single phase formula then the voltage must be 220 voltage, not 415v

  • @saiyadansari2333
    @saiyadansari2333 Месяц назад

    Your What you experienced in life

  • @mohammadsonu2724
    @mohammadsonu2724 9 месяцев назад

    Low current load no add

  • @mallicksaif0079
    @mallicksaif0079 4 месяца назад

    Please upload part - 8