Rotary Evaporator Installation

Поделиться
HTML-код
  • Опубликовано: 11 дек 2024

Комментарии • 7

  • @buchilabequipment
    @buchilabequipment  2 года назад

    Time Stamps:
    00:00 Unpacking and content review
    00:51 Mounting the rotary drive unit
    01:57 Fixation of the vapor duct
    02:43 Fitting the condenser
    03:42 Fitting the evaporating flask, glass stopcock, receiving flask
    04:47 Connecting the cooling media tubing
    06:43 Filling of the heating bath
    07:09 Operating the Rotavapor®
    08:25 Feeding solvent during distillation
    09:03 Installing the Vacuum pump V-100: electrical connections and connecting the silencer
    10:34 Fitting and connecting the Interface I-100
    12:49 Connecting a Woulff bottle
    15:34 Connecting the Interface I-100 via the Woulff bottle
    16:51 Connecting the vacuum pump to the condenser and electrical connections
    18:20 Performing a leak test

  • @406.dabber8
    @406.dabber8 8 месяцев назад

    Cool I hope this helps with my rotovap. It didn't come with the best instructions

    • @buchilabequipment
      @buchilabequipment  7 месяцев назад +1

      Hello, sorry to hear that you didn't find our manual as helpful. Did the video help? Do you need any assistance?

    • @406.dabber8
      @406.dabber8 7 месяцев назад +1

      @@buchilabequipment I'll be setting it up very soon haha I will let u know

  • @sitwazheng
    @sitwazheng 11 месяцев назад

    nice😀

  • @putusumardika2951
    @putusumardika2951 6 месяцев назад +1

    Price

    • @buchilabequipment
      @buchilabequipment  6 месяцев назад

      Could you please contact us by our webform: bit.ly/41OeXde