Our department has kept the “how to load” video private, but it’s simple. As we load with our 250’ rear pre-connects, it’s simply 150’ of straight stack hose to the right side. A dump loop is placed after the first course is laid to clear the bed, another loop at 75’. Set the male coupling aside, then load nozzle and last 100’ to the left in a standard minuteman stack. Connect the couplings and you have this load.
Is there a video on how to load this?
Our department has kept the “how to load” video private, but it’s simple. As we load with our 250’ rear pre-connects, it’s simply 150’ of straight stack hose to the right side. A dump loop is placed after the first course is laid to clear the bed, another loop at 75’. Set the male coupling aside, then load nozzle and last 100’ to the left in a standard minuteman stack. Connect the couplings and you have this load.