How to perform Safe / proof load test for over head cranes

Поделиться
HTML-код
  • Опубликовано: 17 ноя 2024

Комментарии • 3

  • @rizwanahmed7382
    @rizwanahmed7382 2 года назад +2

    Good information ! Normally 125% from design/rated capacity is used for testing purpose.

  • @shakilansari8636
    @shakilansari8636 Год назад

    I am EOT crane operator will you give me a job in your company

  • @kiassafety
    @kiassafety 8 месяцев назад

    THE METHOD U FOLLOWED IS NOT CORRECT
    THE STANDARD NOT TELLING LIKE THIS
    PLEASE READ THE STANDARD YEAR 2019