Biomass Boiler Install 5.0 | Pipework and System Design

Поделиться
HTML-код
  • Опубликовано: 7 фев 2025
  • This is where the exciting work starts with the beautiful network of copper pipe and all the components that will make the system meet it's optimum efficiency. The flow and returns from the boiler and buffer tank are in place and pumps and valves being positioned.
    Music buy Jahzzar
    "Scenes from the Zoo" by Jahzzar (www.betterwithm...)
    Follow the blog and subscribe for our updates.
    restorationcoup...
    / restorationcouple
    / restocouple

Комментарии •

  • @zedman442
    @zedman442 9 лет назад +3

    Ooh I do like a bit of copper plumbing gets me all excited. Did I spot a bit of hemp use on the union to the expansion vessel? Not really allowed anymore as this can harbour bacteria regardless of it being supplied for potable water or not, direct or in-direct. You can't beat a bit of hemp and boss white on threaded unions though! Works great on LCS pipe.

  • @peggyt1243
    @peggyt1243 9 лет назад

    Watching your videos has convinced me to never renovate again. I am done with old floorboards, drywall dust and my house full of materials. I have recently finished the renos on this house and my next one will be a new build. You have far more patience than I. I do agree that plumbing can be beautiful.

  • @johncampbell6715
    @johncampbell6715 2 года назад +1

    Pipework is apalling..
    No planning and thi is what you get.
    Looks like a diy job.
    I can guarantee you that you will have constant issues with this system.

  • @marcusmason3440
    @marcusmason3440 5 лет назад

    aaaawwwwww..........comeoooon.......lovely pipework......up against a rough wall !! schoolboy error.......do the wall behind the pipes first.....call me picky......