I like the way you break it down into phases. Breaking down into phases, u see the expenditure less bordered. U motivate me more and more to speed up my project. Thx bro 🙏
Bright thnx for the good job u are doing. How i wish I had met you earlierya guys do a really neat job and prices and charge are way cool. I paid a fortune to get to where i have on my project. But from this day ya guys will do my jobs.
Thank you very much for the insight,my question is that let assume that you are building 3 bedroom storey building on a half plot of land which size let say 100by20,how much are you going to spend from the foundation to the Decking as compared to the 4 bedroom storey building you show us because this 4 bedroom storey building is on 1 full plot........
My brother God richly bless you, you have given me hope in doing something back home I have been so scared due to stories of my friends and even family members I will definitely contact you crunching some numbers with wify first
Thank you Bro Bright, for the educative videos. Could you please give estimate of the quality to iron rods used for the decking and stairs for this project. I was given an estimate of iron rods quantity for my 1300sq ft building. However, I feel like the quantity is too much. A breakdown of the steel work will be helpful. Thanks.
It will depend on the severity of the cracks. There are some cracks caused by the sinking of the laterite, this must be repaired. There are some cracks caused by the hardening of the concrete, this you shouldn't worry about. 😉 Regards. Mr. Bright
Somebody that know what their talking about I love it…..if you’re building in Ghana you gotta share this channel.
Wow! Sir, God richly bless you! You're such an honest man. The Lord is your reward.
Well said. I love how you explain and the encouragement mr Bright.
God bless you. Much love.
Thank you my boss. I admire you alot. Wishing you all the best sir.
I like the way you break it down into phases. Breaking down into phases, u see the expenditure less bordered. U motivate me more and more to speed up my project. Thx bro 🙏
Thank you very much. It is my pleasure.
Bright thnx for the good job u are doing. How i wish I had met you earlierya guys do a really neat job and prices and charge are way cool. I paid a fortune to get to where i have on my project. But from this day ya guys will do my jobs.
Thank you very much for the complement.
This is great information Mr. Bright. We are looking forward to having you work on our building!
Nice one
Thank you for sharing.
I will be happy when I get the same plan for future use
Thank you very much for the insight,my question is that let assume that you are building 3 bedroom storey building on a half plot of land which size let say 100by20,how much are you going to spend from the foundation to the Decking as compared to the 4 bedroom storey building you show us because this 4 bedroom storey building is on 1 full plot........
My brother God richly bless you, you have given me hope in doing something back home I have been so scared due to stories of my friends and even family members I will definitely contact you crunching some numbers with wify first
Thanks alot for the complement. Waiting for your call please.
good deal
Nice one thanks you
Thank you Bro Bright, for the educative videos. Could you please give estimate of the quality to iron rods used for the decking and stairs for this project. I was given an estimate of iron rods quantity for my 1300sq ft building. However, I feel like the quantity is too much. A breakdown of the steel work will be helpful. Thanks.
Thank you very much, Mr. Bright , please how many tons of iron rod thus, 16mm will complete 4 bedroom single story floor casting.
Sorry you didn't touch on the estimate for iron rods during decking
Show inside when done
Thanks for this bro. I saw cracks on my foundation surface after they casted . Is it something I should worry?
It will depend on the severity of the cracks.
There are some cracks caused by the sinking of the laterite, this must be repaired. There are some cracks caused by the hardening of the concrete, this you shouldn't worry about. 😉
Regards.
Mr. Bright
Hi Mr. Bright thank you so much for the information,good work done for madam Rita,may l know the location of the plumber Mr. Fredrick Owusu thanks
Thanks for watching. The plumber is located in kasoa, wherever you are, he will come and work for you.
Eiii GHC 7500 to GHC 6000 for the mason,.
What size of iron rods is good for building a story building
For single storey, 16mm is okay
@@BrightandClara thanks
Amazing 🤩 details 👏👏
Thanks for coming through
Bro, you are doing a very good job.