Caltrain Cab Ride on train 669 from Sunnyvale to Millbrae on April 28, 2023

Поделиться
HTML-код
  • Опубликовано: 6 сен 2024
  • The ride was from 3:38 PM to 4:13PM and includes the departure of the train
    Cabcar 4005
    F40PH 902

Комментарии • 3

  • @commodoresbank
    @commodoresbank Год назад +1

    After watching the cabride, I only watched where progress was going on for electrification. To summarize, not so much going on still, but I do see the hooks on top in RWC for the earth and return wires (not the static or messenger wires), until we could see new cantilevers going up on the approach to Belmont. I see that after passing the now-closed Atherton station, you can see almost all gantries are done put up, and a super-complex one setup (like the one in San Jose Diridon) just right near the RWC power substation. Its a slow construction process, but I could tell finally Zone 2 of the Caltrain corridor is getting the attention after being left out for a long time.

  • @davidbilleci5891
    @davidbilleci5891 Год назад

    Train 669 is not posted on the timetable and it didn't stop at Mountain View. Schedule modification due electrification construction?