Renewing the River Mersey’s Gladstone Lock Gates

Поделиться
HTML-код
  • Опубликовано: 10 сен 2024
  • The video shows the arrival of the Skylift 3, that was used at the Gladstone lock to replace a pair of caissons weighing 300 tons each.

Комментарии •