Lightning Protection System as Per IEC 62305 || Dr. K. Janaki Raman
HTML-код
- Опубликовано: 16 авг 2020
- Click here to Subscribe - bit.ly/3eZDJOg
Full Playlist on Lightning Protection System - bit.ly/318Kkkk
Thank you Dr. K. Janaki Raman Sir, Technical Head- (Transient and Lightning Protection System Vertical, OBO Bettermann India Pvt. Ltd.) for your valuable time.
Lightning protection is a serious, yet often underestimated issue, which requires professional equipment, installed professionally. The purpose of a LPS is to protect buildings from direct lightning strikes and possible fire or from the consequences of lightning currents (non-igniting flash).
“IEC 62305 Protection Against Lightning” is comprised of 4 parts (documents):
- IEC 62305-1 Part 1: General Principles
- IEC 62305-2 Part 2: Risk Management
- IEC 62305-3 Part 3: Physical Damage to Structure and Life Hazard
- IEC 62305-4 Part 4: Electrical and Electronic Systems within Structures
For detailed information Do watch the video.
#lightningprotectionsystem #LPS
Music by Joey Howard - Moment (Instrumental) - thmatc.co/?l=024810F3
Special thanks to Elisha KC sister
Check out her channel here: / @elishakc5483
All the content and images on this channel belong to this channel and are protected under copyright law. Please kindly DON'T copy or reproduce content without channel's prior explicit permission.
* THE PIONEER * Наука
Sir, it was so far the best video. This is the only video I found which is created by Indian with a very clear detailed understanding of the topic. You have explained practical points to be taken care of while designing LPS. After watching this video I have become your fan. I would love to see more videos created by you.
Thank you so much!
We will surely upload more in coming days.
Wow it has proper and detailed info
Very nice lecture indeed.
Wow great👍️
Very nice information Sir.
HAI SIR
A very commanding subject video is not found earlier, in my search for the installation of a solar system.
Great work and presentation.
Er.Mukesh sirohi
Great Stuff
Good job
Very Technical Information #Balajiengineers
Sir can you please tell me how to calculate the number of down conductor and height of the air terminal
Hi Sir , on the MESH system design , may I know what is the height of the conductor over the protection area ? Can we design the MESH system with conductor same height with the protection area and using a clip to clamp the conductor into the surface area , please advise ? tq
Sir, how can I get or purchase the complete standard IEC 62305-2?
sir on my top of house i have lightning arrester by tata solar but still my fan got dameged what is reasons
Is it need to connect All metalic parts(ducts, grills, chiller) in roof (high rise building) to lightning protection mesh..?
i donot think there is need to connect the components to mesh for lightning protection... for internal faults you can ground the other components
hello sir i want to learn IEC 62305 in detail. i want to prepare risk assesment on my own and design LPS and SPD. cplease help me with it
Could some one support me in selection of lightining arresstor?
Thanks for your effort to assist but your intonation doesn't let me gain much
Sorry for the inconvenience...
Mekus mekus