The HealthLine Bus Rapid Transit in Cleveland, Ohio 2023

Поделиться
HTML-код
  • Опубликовано: 21 окт 2024
  • The HealthLine (formerly known as the Silver Line and as the Euclid Corridor Transportation Project) is a bus rapid transit (BRT) line run by the Greater Cleveland Regional Transit Authority in Cleveland and East Cleveland, Ohio, United States. The line runs along Euclid Avenue from Public Square in downtown Cleveland to the Louis Stokes Station at Windermere in East Cleveland. It began operation on October 24, 2008. Its current name was the result of a naming rights deal with the Cleveland Clinic and University Hospitals of Cleveland. The HealthLine is denoted with a silver color and abbreviated simply as HL on most RTA publications.
    The HealthLine's ridership peaked at 5.08 million rides in 2014, but has since declined by over 25% through 2018, with 3.7 million rides that year.
    The Healthline is tied with Connecticut Transit's CTfastrak as the second-top rated BRT system in the United States each with Silver rating according to the BRT Standard. Only ABQ RIDE's Albuquerque Rapid Transit has achieved the top rating of Gold. ~Wikipedia
    -
    Want to use my footage in your videos? Email me at
    timpatsuk1@gmail.com
    and I can provide the raw files from this video (without the filmed by "Timothy Migliore") overlay for a fee.
    See the Places I Have Filmed in (and transit you can find on this channel)
    www.google.com...
    Facebook: / timosha21
    Patreon - Support the Channel (this helps the channel grow and provide more transit content!) : www.patreon.co...
    Filming these systems takes a lot of work: your support helps the channel grow with new videos from across the world and us having an awesome discussion and connecting with other transit enthusiasts across the globe. Thank you all for the comments, superlikes, superchats, and subscribers!

Комментарии • 12

  • @himbourbanist
    @himbourbanist 10 месяцев назад +6

    I like the island platforms, and the all-door boarding on these buses. Looks like they did a good job with this

  • @obifox6356
    @obifox6356 10 месяцев назад +2

    Interesting use of left doors and left lane, reducing interference from cars and trucks at the curb.

  • @danielsamuels5857
    @danielsamuels5857 2 месяца назад

    Nice, and I see that the TSP thing has been reactivated.

  • @Fan652w
    @Fan652w 10 месяцев назад +3

    To my pleasant surprise, this was a very interesting video. There seemed plenty of buses. How often do they run? And though the video was filmed on a Sunday, there were passengers! That contrasts with your recent video of Cleveland light rail. Doors on both sides of the bus is ingenious;. I have only ever seen that once, in Essen in Germany. (Those buses have since been withdrawn.)

    • @aynt_2065
      @aynt_2065 10 месяцев назад

      I believe the HealthLine runs every 15 minutes, which I feel constitutes a headway that's a bit too long to be called BRT, but given that this system seems to actually have dedicated, center-running bus lanes for most of the route, unlike most US "BRT," I'm not gonna hate on it.

    • @Fan652w
      @Fan652w 10 месяцев назад

      @@aynt_2065 Thank you very much for the information.

  • @chromebomb
    @chromebomb 10 месяцев назад +3

    this is a good brt good job ohio

  • @janettemcclelland2959
    @janettemcclelland2959 10 месяцев назад +2

    This inspired the Albuquerque Rapid Transit system.

    • @danielsamuels5857
      @danielsamuels5857 2 месяца назад +3

      The only gold standard BRT in the United States. HealthLine, along with CTFastrak in Connecticut, have been settling for silver to this day.

  • @edwardmiessner6502
    @edwardmiessner6502 10 месяцев назад

    It's an okay BRT lines, what the DOT/FTA calls gold standard, but nothing like Bogata or Curitiba. Those cities have _real_ BRT. The Cleveland RTA could widen the platforms and install enclosures with platform screen doors though, and build wide and enclosed platforms at stops that don't have them so the passengers can be nice and cozy on a cold winter's day.

    • @Jeremiah3322
      @Jeremiah3322 8 месяцев назад

      Well back then we used to have new flyer 60 LFR‘s, and when we ordered these RTA made a mistake they didn’t do the correct measurements. The bus doesn’t lineup on the platform correctly when we ordered the old buses they measured it and had all the platforms built exactly the same height of the bus but now that we have the new buses they don’tmatch exactly so the bus drivers have to be 2 inches away from the curb

  • @sepruecom
    @sepruecom 10 месяцев назад

    probably the cheapest health related service in the entire USA...