Actually you are right but l upgrade the design from Ash& Gad For example My design ever the Single phase meter in the house will enjoy the three phase live from ECG My design whe you change to phase 1 on the Changeover the power pass through some process before go to distribution board (DB) It go to AVR, SPD and RCD before go to DB there is another RCD in distribution board. Thank you for your comments
Hahahaha 😁😁😁 you just more my day Boss Electrical work is possible everything can happening. I trust me nothing like that is not going to happen because l have provided all the safe devices Thank you
I’ve been following you for sometime now. Keep up with the educational content 😊. I have a quick question. In preparation for the earth installation, does one need to get charcoal, and oil to bury the earth rod in?
Thank you so much I appreciate it a lot In scientifically when you bury Four basket of charcoal and you Water in the place it can 3 to 4 month without Dry Actually that is what good earth needed. A good earth need this to maintaining it less ohs always Thank you keep on share it for us
Accra -Spintex Road Coca-Cola round about opposition Saudi yard Kumasi - Tech Ayigya zongo opposite affordable house🏠 Call us or whatup +233(0) 542902016 W
dear friend , i seen from bangladesh , your work procedure very nice, i appreciate you. i am also electrical engineer .
Thank you very much
I really really appreciate it a lot
Good to know there are other Good electrical engineers. Do you did mention Ash& Gad.I could see some differences.
Actually you are right but l upgrade the design from Ash& Gad
For example
My design ever the Single phase meter in the house will enjoy the three phase live from ECG
My design whe you change to phase 1 on the Changeover the power pass through some process before go to distribution board (DB)
It go to AVR, SPD and RCD before go to DB there is another RCD in distribution board.
Thank you for your comments
Well experienced engineer ❤. Keep the good job going 🎉
Thank you Very Boss
I appreciate it a lot
Good work 👏 👏 👏
Thank you Boss
Please did the design from Asher&Gad caught fire?
Hahahaha 😁😁😁 you just more my day Boss
Electrical work is possible everything can happening.
I trust me nothing like that is not going to happen because l have provided all the safe devices
Thank you
I’ve been following you for sometime now. Keep up with the educational content 😊. I have a quick question. In preparation for the earth installation, does one need to get charcoal, and oil to bury the earth rod in?
Thank you so much
I appreciate it a lot
In scientifically when you bury
Four basket of charcoal and you
Water in the place it can 3 to 4 month without Dry
Actually that is what good earth needed.
A good earth need this to maintaining it less ohs always
Thank you keep on share it for us
Hi, your location please?
Accra -Spintex Road Coca-Cola round about opposition Saudi yard
Kumasi - Tech Ayigya zongo opposite affordable house🏠
Call us or whatup
+233(0) 542902016
W
Please think about your safety too, Electrical engineers don't wear jewellery when working.
I was wearing it before the video because of the demonstrations and there is no electricity to
Thank you for your comment
I appreciate it a lot