Это видео недоступно.
Сожалеем об этом.

Northampton north relief road progress dec 23'

Поделиться
HTML-код
  • Опубликовано: 15 дек 2023
  • From Windhover end including new roundabouts, and showing surfaced road as far as new railway crossing.

Комментарии • 5

  • @mickmeadows2040
    @mickmeadows2040 5 месяцев назад +1

    Thanks Richard. Looks like traffic are heading up past Smiths upto Broughton and if heading for Moulton Park will head back into Kingsthorpe via Whitehills and more traffic congestion. Crazy

    • @richardz9321
      @richardz9321  4 месяца назад

      Updated video over Easter (see link above) this is prior to whole road out to Chapel Brampton being closed so it can be linked up to new road correctly

  • @johnmoon4163
    @johnmoon4163 7 месяцев назад

    Thanks for the video. Doesn't look like much "progress" to me.

  • @richardz9321
    @richardz9321  7 месяцев назад

    Apologies for little 'shaky' footage, but at least you can see how that end of the road at least has progressed

  • @richardz9321
    @richardz9321  4 месяца назад

    Easter update; ruclips.net/video/vliJOp2ltPQ/видео.html