  • In this video we will show you step by step, how to install a flat roof finished with flexible resin.
    Thank you for visiting. I hope you enjoyed watching my video and I am looking forward to seeing you again.
    Here are my social links:
    Facebook:
    profile.php?...
    Instagram:
    yes_constructio...
    Tiktok:
    / yesconstructionltd
    LinkedIn:
    / daniel-urbanowicz-370b...

Комментарии • 71

  • @jilltyrell6741
    @jilltyrell6741 23 дня назад +2

    fantastic very useful video thankyou

  • @abzcyclingadventures4918
    @abzcyclingadventures4918 7 месяцев назад +3

    Great job,
    Done to perfection 👌

  • @aaronmunden3069
    @aaronmunden3069 7 месяцев назад +2

    Enjoying your videos, keep up the great work!

  • @franksexton4083
    @franksexton4083 7 месяцев назад +2

    Great job once again! Keep those videos coming with plenty of explanations thanks ❤️🏴󠁧󠁢󠁳󠁣󠁴󠁿👏🤙

    • @yesconstructionltd
      @yesconstructionltd  7 месяцев назад +1

      Thank you very much 😊
      Yes, I know I need to improve. I am preparing a nice video about silicone rendering where there is going to be a lot of explaining and talking.
      I know it sounds silly because I am talking to my own camera so there is no pressure, but sometimes I forget how to speak English 😅
      I am getting better though.
      I appreciate your comment, thanks !

    • @franksexton4083
      @franksexton4083 7 месяцев назад

      You’re doing great keep it up 🤙

  • @moksudkhan
    @moksudkhan 7 месяцев назад +1

    Excellent work!

  • @tonygilmour9104
    @tonygilmour9104 5 месяцев назад +1

    Excellent job - well done

  • @user-ve1fe8vg2c
    @user-ve1fe8vg2c 7 месяцев назад +2

    accurate and professional work, keep it up👍👌

  • @ferdousurbanowicz9180
    @ferdousurbanowicz9180 7 месяцев назад +1

    Amazing work 👌👌👍👍

  • @nickbranch3588
    @nickbranch3588 7 месяцев назад +1

    Great videos

  • @dariuszgwiazdowskiqd1040
    @dariuszgwiazdowskiqd1040 7 месяцев назад +1

    professional job 👌👍

  • @ianwebster652
    @ianwebster652 7 месяцев назад

    brilliant job

  • @ablubliblabpablublu9066
    @ablubliblabpablublu9066 7 месяцев назад +1

    Dobra robota

  • @user-no7fr5jr7m
    @user-no7fr5jr7m 3 месяца назад +2

    You didn’t install a vapour control later before the insulation. This will cause interstitial condensation between the insulation and timber which is I’ll inevitably deteriorate the insulation and rot the timber. From the video you’ve adhered the insulation straight to the timber substrate.

    • @yesconstructionltd
      @yesconstructionltd  3 месяца назад +1

      Hi
      We did. Take a look again. We laid down the membrane before installing insulation. Building control had to see it as well to sign it off .

    • @user-no7fr5jr7m
      @user-no7fr5jr7m 3 месяца назад +1

      @@yesconstructionltd I do apologise. I’ve seen the full video on your channel. What grp system did you use? Was it an iko product?

    • @yesconstructionltd
      @yesconstructionltd  3 месяца назад +1

      ​@@user-no7fr5jr7m
      😊 No worries
      We use RESTEC FLEX
      Brilliant gear. It's flexible
      www.roofingoutlet.co.uk/products/res-tec-flexitec-2020-resin-20kg?variant=39639333961799&gad_source=1&gclid=CjwKCAiA0PuuBhBsEiwAS7fsNS7o-wRchj3mTRQXsRa5H9FDxo4hojyn4jDOu1FPe4rm0gfnbRfT-RoC4s8QAvD_BwE

  • @skrzypix
    @skrzypix 4 месяца назад +1

    💪👍

  • @rdev1696
    @rdev1696 2 месяца назад +1

    Very neat job but 1 question. Where you put the guttering on the roof, there's no insulation. Will this cause problems down the line? Like a cold spots?

    • @yesconstructionltd
      @yesconstructionltd  2 месяца назад

      Hi
      We have the 150mm Celotex wrapping the gutter from the bottom (in the ceiling) and overlapping it by 200mm, so there are no cold spots.
      Well spotted!

  • @kli309
    @kli309 4 месяца назад +1

    Hi, this is done very nicely! Is the glas glued only or is it also fixed with clips to re wodden frame? Thx, Jacob

    • @yesconstructionltd
      @yesconstructionltd  2 месяца назад

      Hi Jacob
      I am sorry, I missed your comment. I always try to reply to all comments.
      The glass is glued- two layers. One is silicones on top of the opening and the second letter is smaller and it sits inside on the frame so there is no chance for it to slip, fall etc.

  • @plummetplum
    @plummetplum 2 месяца назад +2

    Lovely job. Although im pretty sure that the membrane under the PIR should be a vapour control membrane and is mandatory for warm roof design regs not a luxury?
    Also what do those spiky joist washers do?

    • @yesconstructionltd
      @yesconstructionltd  2 месяца назад +3

      Hello mate
      Thanks for dropping by.
      This was done in times when it was very hard finding supplies. Could not find the VCB anywhere so the building control agreed on using a roof membrane. It's there to protect the plywood from condensation.
      The spiky washers (timber connectors) are to stop the joist from moving independently. If they move, they move together so they work like one massive beam.

    • @plummetplum
      @plummetplum 2 месяца назад +1

      ​@@yesconstructionltdThanks for the info 😊

  • @oneinteriors5179
    @oneinteriors5179 5 месяцев назад +1

    Hi. Great job. What is the size of this extension in meters

  • @ETB9090
    @ETB9090 2 месяца назад +1

    I notice your insulation stops short where you form your trough, which would create a cold spot, how have building control been about this?

    • @yesconstructionltd
      @yesconstructionltd  2 месяца назад

      Hi
      It is insulated from underneath with 150mm celotex. We overlapped by 200 so no cold spot.

    • @ETB9090
      @ETB9090 2 месяца назад

      @@yesconstructionltd Cheers mate I was going to suggest the same and seal with expanding foam 👍👍

  • @DICEGEORGE
    @DICEGEORGE 4 месяца назад +1

    are those skylights double glazed with aluminium edges or what please?
    I need some !

    • @yesconstructionltd
      @yesconstructionltd  4 месяца назад

      Exactly how you described. The glass on the outside is bigger and the one inside is smaller so it fits inside of the opening. It's supported with a wooden frame inside and covered with plasterboard.

  • @bilpat5123
    @bilpat5123 4 месяца назад +1

    Nice job👌, just out of interest would the box gutters which doesnt have insulation underneath cause cold spots inside the ceiling?

    • @yesconstructionltd
      @yesconstructionltd  4 месяца назад +1

      Hi
      The box is insulated from the bottom with 150 mm celotex and we overlapped it by 200mm.
      Building control wouldn't pass the job if it wasn't done. Well spotted!
      I like to have the gutter concealed in the roof. The extension looks a lot neater from the outside.
      Thank you for engaging 😉

    • @bilpat5123
      @bilpat5123 4 месяца назад +1

      @@yesconstructionltd hi, thanks for your reply... Nice work and videos, keep it up 👌

    • @yesconstructionltd
      @yesconstructionltd  4 месяца назад

      @@bilpat5123
      Thank you 😉

  • @ETB9090
    @ETB9090 2 месяца назад +1

    Hi mate I can see that your not using thermabate type cavity closures around your openings are you using an insulated vertical dpc as a thermal break

    • @yesconstructionltd
      @yesconstructionltd  2 месяца назад

      Sometimes we do
      In this case we have the 150mm cavity wool coming all the way up and we lay down dpc on top to prevent any moisture penetrating through.

    • @yesconstructionltd
      @yesconstructionltd  2 месяца назад

      If you check my other video
      5 leaking roofs(thumbnail) you will see that in there we used cavity closure. It's not a regulation to use the closures on top of the wall. You must use them around doors and windows

    • @ETB9090
      @ETB9090 2 месяца назад

      @@yesconstructionltd Hi mate, yes I no that, I just couldn't see cavity closures or insulated dpc in those reveals, still can't to be honest, it just looks like you've returned the blockwork

    • @yesconstructionltd
      @yesconstructionltd  2 месяца назад

      @@ETB9090
      I thought you were talking about the top of the wall on the roof.
      This is an unusual case. The bifold door is 3.6m, each section is 1.2 m triple glazed so very heavy. The door company suggested returning the brickwork in the reveal for strength.
      We then took this thought to building control and he blessed the idea providing that the client agrees. Later we glued insulated plasterboard in the reveal to provide some form of insulation.
      Sometimes we have to tweak the rules to achieve a greater goal and as long as the BC blesses everything, it's all good 😊

    • @ETB9090
      @ETB9090 2 месяца назад +1

      @@yesconstructionltd well if BC have signed it off mate I suppose that's all u need, I notice you've done the same to the window, I get the reason behind it returning the blockwork, but in that situation I would of used Damcor or similar insulated dpc and still returned the blockwork as it's only about 20mm thick, you've had a very flexible BC officer out mate as I there's a lot that probably wouldn't pass that on new construction, on existing to mitigate cold bridging I've used 10mm aerogel in the reveals then bonded plasterboard to it, in all honesty I prefer blk returns it's a better fixing but use Damcor, anyway great videos mate, and thanks for taking the time to answer my questions, cheers👍🏻

  • @mrboyban
    @mrboyban 5 месяцев назад +1

    Hopefully the customer didn't have any issues with the ceiling height....

    • @yesconstructionltd
      @yesconstructionltd  5 месяцев назад

      It was a tricky one. The only way to achieve more height was to install a cold roof but this is not how it was designed by the architects.

  • @jonathantongs1568
    @jonathantongs1568 3 месяца назад +1

    Am I the only one who is mentioning the breather membrane being used as a vcl !😅

    • @yesconstructionltd
      @yesconstructionltd  3 месяца назад +1

      You are the second one actually 😉 This was the time when I couldn't get the VCL even online, and other materials too. I asked the building control and they said that the membrane is fine so we used it.
      Looks like you know the game, good on you mate 👍

  • @robevs100ok
    @robevs100ok 3 месяца назад +1

    why did you use shuttering ply instead of engineering or marine?

    • @yesconstructionltd
      @yesconstructionltd  3 месяца назад

      I was waiting for someone to ask this at some stage 😉
      I couldn't get it on time from Jenson and Selco didn't have it either. I asked the building control if he is happy with normal ply and he was as long as we covered it with a membrane.

  • @zacayo8488
    @zacayo8488 2 месяца назад +1

    Cost?

  • @fazekaslaszlo
    @fazekaslaszlo 7 дней назад +1

    Great video but tbh you’d struggle to find decent roofers like these guys and flat roofs are just not suitable for the UK climate, I have one and it’s a constant struggle with the element 😊

    • @yesconstructionltd
      @yesconstructionltd  4 дня назад

      Hi, and thank you for engaging. There are many ways of finishing a flat roof. In the video we are using top quality materials and the job is executed properly so roofs like this should last a very, very long time.

  • @davidosullivan3432
    @davidosullivan3432 4 месяца назад +1

    half the time lapse and more explaining the detail would make a better video . for example how you showed the connection for timber beams was informative. how is the osb held down ? screws what type of screw? how do you go about fixing the trims ? stick it nail it or screw it? fine telling us its done great but would be much better to tell us how its done . thanks

    • @yesconstructionltd
      @yesconstructionltd  4 месяца назад +1

      Thank you David for your honest opinion and I definitely take that on board.
      I am emotionally connected to the videos so I make many mistakes and I only see them a month later.
      It's also a confidence issue ( talking to camera) but I think I am over that now and I feel a lot more comfortable.
      You are not the first person saying this to me so I am reall trying now to take my videos from a different angle where I explain the stages, layers, materials etc.
      I will be recording how to apply micro cement in the bathroom and a double pocket door installation and I have plan to really go into details.
      Thanks again for the valuable comment

  • @gafffisher
    @gafffisher 2 месяца назад +1

    Do you recommend a vapour barrier on the skylight upstanding where you’ve you’ve installed PIR

    • @yesconstructionltd
      @yesconstructionltd  2 месяца назад

      hi
      We have a barrier as high as the insulation. There is no need to go above it, as there will be no condensation there. All the wood above it is cover with resin and flushings.

    • @gafffisher
      @gafffisher 2 месяца назад

      @@yesconstructionltd I was told to put a sheet of visqueen in before the insulation but your Video didn’t show this. Thanks for the reply