10 Ongoing / Completed Projects in Zambia That Would Blow Your Mind

Поделиться
HTML-код
  • Опубликовано: 26 окт 2024

Комментарии • 179

  • @kandumbuidefonso8753
    @kandumbuidefonso8753 Год назад +29

    Zambia must consider the road between Shesheke and Kazungula that will link Zambia and the port of Walvis Bay in Namibia. This will benefit Zambia a lot.

  • @reubenmunungwe
    @reubenmunungwe Год назад +36

    Except for the Lusaka - Ndola Dual CarriageWay, most of those projects were commissioned around 2020 - 2023.

    • @pietrojenkins6901
      @pietrojenkins6901 Год назад +1

      All new projects should stop because Zambia is heavily in debt.Then look how ordinary people live in Chibolya, Misisi etc.

    • @tamikanamwawa9447
      @tamikanamwawa9447 Год назад

      These ma "will" in the narration confused me 😅 nati ngefi tumona

    • @SCM793
      @SCM793 Год назад +2

      Listen we have developed and invested that’s why we are in debt no good but Zambia will keep developing and invests are never a bad thing that’s how we’ll keep the country growing for the future

    • @musolepaulkaliamba6122
      @musolepaulkaliamba6122 Год назад

      The presentation here is not representing a political party but Zambia as a nation, if you are saying that because of HH's picture don't forget that he is the current Republican President..... So my friend are you still in denial, forget about the past forward we go but we can't forget about your regime's errors of gassing and corruption because they are benchmark lessons not to be repeated ever again.....

    • @petermwamba4968
      @petermwamba4968 Год назад

      ​@@pietrojenkins6901 you don't understand finance. When you are in debt, you don't halt projects. You ensure the projects work and generate revenue that will be used to settle debt

  • @changemuntu
    @changemuntu Год назад +3

    Proud to be s zambian and give my gratitude to our heavenly father and our government ♥️ ❤️

  • @raphaelsorofa4112
    @raphaelsorofa4112 Год назад +10

    As a Zimbabwean I admire such clean projects within our region

    • @reubenphiri2076
      @reubenphiri2076 Год назад

      I like Govts that are infrustracture oriented

  • @MunaileMulenga-tw4dq
    @MunaileMulenga-tw4dq Год назад +4

    If you don't have what to talk about remain silence rather than elaraborating on accomplished things because 99.9percent of the projects are already completed.

  • @giftsiyanga2116
    @giftsiyanga2116 Год назад +27

    Most of the projects you are talking about they are already completed and working while others are yet to be finished and like Lusaka -Ndola dual carriage way hasn't yet started.

  • @Fjdhfyhk
    @Fjdhfyhk 4 месяца назад +2

    My head right now 🤯

  • @kingslj
    @kingslj Год назад +10

    Mate, we appreciate your sharing but next time, plse, share on the the actual projects that are really undergoing development like the Lusaka-Ndola carriageway than on the ones which are already done. Thanks

    • @felixmwansa7822
      @felixmwansa7822 Год назад +1

      So, some one wants to get credit on projects that were already completed before there time?

    • @elvissiwela9151
      @elvissiwela9151 Год назад

      Politics will always be politics

  • @lucasmumbi8976
    @lucasmumbi8976 Год назад +7

    Many projects you have mentioned here have already been completed like two years ago

  • @mothusiletsatsi3279
    @mothusiletsatsi3279 Год назад +1

    wow, great projects from zambia

  • @josphatmulilo6838
    @josphatmulilo6838 Год назад +4

    Most of the projects you are talking about have been done during the pf leadership (mongu/kalabo road,kazungula bridge and many more)

  • @chisambamayondi1088
    @chisambamayondi1088 Год назад +1

    Thanks for sharing.
    Informative, however not without some inaccuracies and inconsistencies.
    Katete and Petauke 😁

  • @ranjitsian5481
    @ranjitsian5481 Год назад

    Good work and nice 👍

  • @gabrielchanda5905
    @gabrielchanda5905 Год назад +1

    KKIA and KAZUNGULA almost done.

  • @NjambaNjamba-r4k
    @NjambaNjamba-r4k 2 месяца назад

    Good work

  • @dorothybwalya8133
    @dorothybwalya8133 Год назад +3

    Well done ba PF 👏

    • @Godfrey..
      @Godfrey.. Год назад

      😂😂 those projects are underway.

    • @chamadominic5305
      @chamadominic5305 Месяц назад

      😅😅​@@Godfrey..
      Erroneous narration...
      All projects completed before 2021 except Lusaka-Ndola dual carriage way...

    • @chingumbeyuku8995
      @chingumbeyuku8995 8 дней назад

      Kwati kapuba most of the projects done under were inherited from the MMD GRZ nothing was originally conceived by them PF fyonse fyali fyakwa Mwanawasa not ba Mr Top notch iwe boss iwe, Get your head out of the sand ba Dorothy 😂😂😂😂

  • @chinunkaglory644
    @chinunkaglory644 Год назад

    These are PF initiated projects.

  • @sakuwundagraham4526
    @sakuwundagraham4526 Год назад

    Continue working Bally God bless you

    • @kennedychanda9961
      @kennedychanda9961 Год назад

      Bally has not started any of late amoung the projects mentioned.

  • @ernestphiri1992
    @ernestphiri1992 Год назад +1

    Katit and Petok road!!! Interesting pronunciations. Good job on the compilation

  • @mubangamulala3429
    @mubangamulala3429 9 месяцев назад +1

    Which one is the Solwezi Mansa road?

  • @abuidnsampala
    @abuidnsampala 3 месяца назад

    We should now start developing our railway network for our economy to thrive!

  • @JanetKamweka
    @JanetKamweka 2 месяца назад

    The Lord has been Merciful towards us🌹🌷🌺😀💯🌲👪👣💕🤗,we thank God for ALL who have contributed to it's development From the First president to current one.We can only Pray for the current President that God may Grant him Great insight and wisdom with his Team to blend every good will Zambia has ever had since.And l like what is happening right now, Prayer: that Zambia should Love God and involve him in every of our dealings and He Will definitely cause Us to Excel beyond our anticipation.Amen

  • @pastorcedrichawkins1685
    @pastorcedrichawkins1685 2 месяца назад

    This all would be well. If the president and leaders would focus on the basics. Sustainable water, food and power for all Zambians. Until this happens, Zambian citizens are behind the eight ball.

  • @changemuntu
    @changemuntu Год назад

    HH wakileka fye may the Lord bless you snf your government 🙏

    • @cholakabaso2250
      @cholakabaso2250 8 месяцев назад

      The current government has no hand in all the projects mentioned except for the Lusaka Ndola dual carriage way which is yet to be commissioned.

  • @kelvynkatongo2792
    @kelvynkatongo2792 Год назад +6

    Most of ghesebprojects have already been undertaken in Zambia. The cost of the Lusaka-Ndola dual carriage has even bee revisited and revised under the new dawn Gov't. Kindly get updated information for a more informed position. Thanks for your interest in our country.

  • @ManuelKanyembo
    @ManuelKanyembo Год назад +1

    Solweze Mansa road which Mansa is mentioned here is it Mansa in luapula province? and solwezi chingola road completed long time ago.

  • @jamesmut3117
    @jamesmut3117 6 месяцев назад

    You described 10 ongoing projects. Did you edit out the part about the completed projects in Zambia that would blow my mind without refactoring your title?

  • @charlesmurimba3246
    @charlesmurimba3246 Год назад +3

    Kazungula bridge is already complete, not 2025 completion date.

  • @nkemisang
    @nkemisang Год назад +2

    The Zambia 🇿🇲 Botswana 🇧🇼 bridge is already finished construction and is operational!

  • @overtonemulenga8139
    @overtonemulenga8139 4 месяца назад

    All these project were done way back in PF, except the lusaka dual carriege way.

  • @tiktokzambia
    @tiktokzambia Год назад

    Zambia ku Chalo ❤❤

  • @simonchipimo1916
    @simonchipimo1916 Год назад

    Correct!!

  • @Asher_87-x1b
    @Asher_87-x1b Год назад +8

    The Lusaka - Ndola Dual Carriage Way will cost around $577 million and is scheduled for implementation in July 2023.
    The rest of the projects mentioned here have been handed over and commissioned.

  • @ChipoMatandiko
    @ChipoMatandiko Год назад +1

    ECL legacy!!

  • @aimsikazwe9502
    @aimsikazwe9502 Год назад

    We're did you get all these completion dates course mongu kalabo road, kazungula bridge, Livingston airport, Ndola airport, are all don and being used 🤷🏿‍♂️

  • @chipegomoonga1672
    @chipegomoonga1672 Год назад +5

    I like the way town names were pronounced.
    Solwezi,Kafue , Kalabo, Kazungula ,Katete and Petauke, 😂😂😂😂

  • @choongomoonga6275
    @choongomoonga6275 3 месяца назад

    Please make an effort to do a little research into the names of our country

  • @pematimenterprisesltd286
    @pematimenterprisesltd286 Год назад

    Great work you are doing HH.
    Big Kudos.

    • @kennedychanda9961
      @kennedychanda9961 Год назад

      H H haven't done anything of late, you can not point out any single projects mentioned above which he has done, all those were done by PF and we are yet to see what he will do anyway?

    • @CharlesMoyo-ir5fr
      @CharlesMoyo-ir5fr Год назад

      Kudos should to data and lungu, apart duel carriage way

  • @kasokatransitlogicltd6399
    @kasokatransitlogicltd6399 Год назад +1

    All these project are long go done. Only Lusaka Ndola dua carange way remaining..

  • @nathanvancesr2409
    @nathanvancesr2409 4 месяца назад

    Amin! Mother Africa is on the mighty ARISE AWOKE! 2020 - 2026 or ELSE!~ EXODUS

  • @JosephMulungwe-jk2gz
    @JosephMulungwe-jk2gz 3 месяца назад

    Why forgetting Ndola _ Mufulira road. Something must be done.

  • @nkundenzhimangalilo3075
    @nkundenzhimangalilo3075 3 месяца назад

    Some of these projects we're done ecl

  • @ramzeekikomeko2697
    @ramzeekikomeko2697 Год назад +1

    Zambi roads will connect to East Africa-uganda or to Tanzania

  • @percychipulu7611
    @percychipulu7611 Год назад +3

    all this projects you have mentioned are completed acept the Lusaka Ndola Dual Carriage Way.

  • @cholakabaso2250
    @cholakabaso2250 8 месяцев назад

    The Mongu Kalobo road was completed 8 years ago in 2016 and all the airports were completed. Otherwise most of these projects have been abandoned by the new government for reasons best known to them.

  • @kaixhoi831
    @kaixhoi831 2 месяца назад

    Ndola is not the 2nd city in Zambia. That spot is for Kitwe.

  • @MiriraiNhliziyo
    @MiriraiNhliziyo 4 месяца назад

    Somebody please take me to zambia or invite me to stay with you in zambia, I'll work and work, l wont be a dependent for more than 6months

  • @Atchinin-ih4wq
    @Atchinin-ih4wq Год назад +1

    Why Livingstone Airport instead of Kaunda Airport?

  • @pursueweazmarecoverall486
    @pursueweazmarecoverall486 Год назад +2

    Are the Zambian Engineers involved in these projects

    • @brianmwiinga8166
      @brianmwiinga8166 Год назад

      Those chaps know nothing. They are just bricklayers

  • @TheMissle
    @TheMissle 4 месяца назад

    How bout we get pour power problems fixed

  • @zaktnguni
    @zaktnguni 3 месяца назад

    It's only the dual carriageway between Lusaka and
    Ndola all those others are already done who are you trying to impress?

  • @jezuschrist7120
    @jezuschrist7120 Год назад +1

    Are Zambia engineers leading in these projects or is it the Chinese who are leading the projects ?

  • @peterchungulo5774
    @peterchungulo5774 Год назад

    All these projects were completed 2 years except Ndola Lusaka Dual carriage way come to zambia and see for yourself.

  • @musathepoet
    @musathepoet Год назад

    You have mentioned the title theme of the video like 20 times

  • @johnsampa3482
    @johnsampa3482 Год назад +2

    All the projects mentioned here were commissioned by the previous Government,PF, to be specific, except for Ndola Lusaka duo c/Way and Mansa Solwezi Road😂

  • @sarahnsemiwe
    @sarahnsemiwe Год назад

    Please we want more roads too much traffic in lusaka

  • @mikesinyangwe2553
    @mikesinyangwe2553 Год назад

    What are you talking about? Those projects finished long time ago except the Ndola duo carage way. Any way you are using social media.

  • @ShimastaMusicTv
    @ShimastaMusicTv Год назад

    Except for the Ndola dual carriage way, the rest where commissioned in 2020 to 2023 and are already working. Update your calendar.

  • @manzewachila1459
    @manzewachila1459 Год назад

    Most of these projects are done

  • @gastonphiri9028
    @gastonphiri9028 4 месяца назад

    This documentary is too outdated. Most of the showcased projects were finalised before 2020

  • @AlvisMambwe
    @AlvisMambwe Год назад

    ur we dreaming ?4get about what roads and concentrate on agriculture, we ur in hunger

  • @Lambertdekhant
    @Lambertdekhant Год назад

    It will have been fantastic if you gave us the length of the roads in construction in Zambia

  • @WebsterMulenga-g3h
    @WebsterMulenga-g3h Год назад

    Who is the weather commententor

  • @mbenembene2841
    @mbenembene2841 8 месяцев назад +1

    Ka-te-te / Pe-ta-u-ke articulate read as the words are.

  • @blessingsmengo9952
    @blessingsmengo9952 Год назад +1

    It's amazing that this video was put up a month ago and has a lot of lies when it comes to time mentioned here. It's a shame.
    Mongu Kalabo road was completed even before Michael SATA died. Please delete these lies.

  • @eliazerlushingakawila5949
    @eliazerlushingakawila5949 Год назад

    Most of projects have been done already. And nothing is happening at the moment. The Lusaka/ Ndola road is yet to start.

  • @evansboydkadongola4347
    @evansboydkadongola4347 Год назад

    👍

  • @shadowshade4954
    @shadowshade4954 Год назад

    Only the dual carriageway is underway, the rest were done by 2020

  • @CheweChewe-lc8ge
    @CheweChewe-lc8ge Год назад

    Edgar Changwa Lungu did most of the things here. Though he was something else.

  • @FortuneBesa
    @FortuneBesa Год назад

    Solwezi/Mansa road?
    Most of the projects mentioned have already been completed and commissioned.

  • @show-kcthearchangel
    @show-kcthearchangel Год назад

    Y are you stating wrong dates coz most of those are already done

  • @bernardmnkole4979
    @bernardmnkole4979 Год назад

    Please get updated information about Zambia before posting ala iwe

  • @adnaans_fishing_adventures
    @adnaans_fishing_adventures Год назад

    We need Lusaka-luangwa road. It’s really bad

  • @ahmcell4842
    @ahmcell4842 Год назад +1

    ❤❤❤❤🇿🇲

  • @mwelwamwale4568
    @mwelwamwale4568 Год назад

    These projects except Mansa Congo DR and Ndola lusaka roads were already finished in the pf govt

  • @chawezimvula8882
    @chawezimvula8882 Год назад +1

    😂😂 only 1x3 class room are built don’t mislead the public

  • @Bantu-860
    @Bantu-860 Год назад

    Zambia must change the colonial name Airpot.

  • @isaachatilima
    @isaachatilima Год назад

    A for effort on the pronunciation. 👍

  • @williemwali9324
    @williemwali9324 5 месяцев назад

    This information in the video is not true, you research properly, most of the projects were done before 2022

  • @samuelngulube2802
    @samuelngulube2802 Год назад

    That's face things Only Ndola Lusaka Carried away Road is new stuff though it was also in PF manifesto Zambian Politics nayo😪😪

  • @luv.aid4n
    @luv.aid4n Год назад

    The Kazungula bridge opened last year 💀💀💀

  • @joshuachipere2047
    @joshuachipere2047 Год назад

    Its Kafue not Curfew

  • @andymuteke419
    @andymuteke419 Год назад

    Silowana is poor but is in Zambia

  • @yelesanibanda4586
    @yelesanibanda4586 Год назад

    Tell the nation the truth,some of those projects are already commission.jst appreciate the pf regime.

  • @thenewpharaoh5100
    @thenewpharaoh5100 Год назад

    ✨✨✨✨✨✨✨✨

  • @branislavkambwili6969
    @branislavkambwili6969 Год назад

    Not surprised..... 😂😂😂😂

  • @theoldtable3228
    @theoldtable3228 Год назад

    Do more research, otherwise we are already way ahead of you as Zambia.

  • @cherryblossom3046
    @cherryblossom3046 Год назад

    Why is there NO ZAMBIAN GOVT FOCUS ON SOLAR? Zambia has natural access to sunshine for most of the year, so why is it that every village in Zambia doesn't have govt provided solar panels for cheap electricity which would really enhance health, education and safety for ALL NATIONALS especially those living in rural areas with no connection to the national urban piwer supply?
    President HH please make it a Zambian government goal to provide SOLAR POWER TO EVERY VILLAGE in the country, in order to ensure that every Zambian can switch on lihts when needed. Solar power is far better for the environment than charcoal and wood burning which onky deforest the cpuntry and cause soil erosion and land desertification. The sun always shines in Zambia, please use it to light up and electrify the nation for national development. May i also suggest that a good railroad / network moves more goods and people across the country, with the least amount of pollution, and, should therefore be a substantial part of the transport projects, not just road construction that cater for vehicle owners. Isn't it aboutvtime that Zambia had a cross country rail network. I believe a realistic 360 degree review of the country's rail network and construction should be a national economic focus to ensure that ALL ZAMBIANS HAVE GOOD ACCESS TO AFFORDABLE EFFECIENT & EFFECTIVE, EDUCATION TRAVEL HEALTH opportunities that GOOD TRANSPORTATION AND DEVELOPMENT brings. This long overdue Mr President. Blessings.

  • @daviesmwape3645
    @daviesmwape3645 Год назад

    Stop misleading people, most projects here are operational

  • @PhackweiiLuanshya
    @PhackweiiLuanshya Год назад

    These projects were born in pf and were assumed to be completed.

  • @dennismwenda1696
    @dennismwenda1696 Год назад

    Outdated Info. Research thoroughly before publishing.

  • @zimcoder
    @zimcoder Год назад

    Zambia is building the tallest building in the world? are you for real?

  • @dukewilliam3660
    @dukewilliam3660 Год назад

    Most of these projects are roads and airports. They don't benefit the general population. They just make it easier to exrra natural resources and transport them out of the country. The citizens are sleeping.
    Nothing about hospitals, clinics, housing, food production, drought prevention. Smh

  • @DyceMusokhiwa-br1ms
    @DyceMusokhiwa-br1ms Год назад +1

    Congratulation Mr President you have done a good work as we compare with our died president of Mw 🤩🤩🤪

  • @misheckwams9748
    @misheckwams9748 Год назад

    Redo your research. All those projects are completed already.

  • @lombepanda36
    @lombepanda36 Год назад

    Please next time make a research you are behind with time.

  • @JCTRResearchUnit
    @JCTRResearchUnit 3 месяца назад

    Get your facts right. These projects were completed a long time age

  • @AustinMoonga-t6c
    @AustinMoonga-t6c 3 месяца назад

    God bless THE UNITED PARTY FOR NATIONAL DEVELOPMENT AND ITS GOVERNMENT. THEY HAVE WORKED HARD TO DO SUCH IMPORTANT GOVERNMENT PROJECTS. GOD BLESS THE PRESIDENT AND HIS GOVERNMENT. LONG LIVE! CONTINUE IN THE POWER OF GOD.

  • @mikewebster-l6e
    @mikewebster-l6e 3 месяца назад

    The orator should check pronunciation of names before attempting this sort of presentation. Also check your facts. Half these projects are done and dusted ages ago.

  • @ernestphiri1992
    @ernestphiri1992 Год назад

    Chipata Mfyu road😂😂