[Faulty Platform Screen Door]SMRT Trains at Bishan

Поделиться
HTML-код
  • Опубликовано: 11 сен 2024
  • Trains were delayed on the NSL this morning by 10 mins (ahem) due to the PSDs at Bishan southbound not working properly. These were the scenes I happened to chance upon.
    Trains featured:
    C151B (621/622)
    C151C (719/720)
    C151C (713/714)
    Filmed on 19 Mar 2021

Комментарии • 31

  • @codelyokofanful
    @codelyokofanful 3 года назад +21

    A whole new meaning to the the word manual operation

  • @LunarTesting23
    @LunarTesting23 3 года назад +7

    I went there that night..!

  • @SG6298G
    @SG6298G Год назад +1

    So many C151Cs!

  • @curiousjj
    @curiousjj Год назад +1

    Why must the train still move slow when the doors are only opened a bit?

    • @jktrainss
      @jktrainss  Год назад

      Safety reasons becos those doors can be opened at any time

  • @verycursedplane6557
    @verycursedplane6557 2 года назад +3

    Was this coded manual? C151C on 2 step braking: first C151C even adjusted position

    • @jktrainss
      @jktrainss  2 года назад +2

      Yep thats why the trains were moving so slow

    • @verycursedplane6557
      @verycursedplane6557 2 года назад

      @@jktrainss also ah at 1:33 u cut out the announcements. It says “due to…..” what it actually said ah

    • @jktrainss
      @jktrainss  2 года назад +1

      @@verycursedplane6557 due to platform screen door fault

  • @SG6298G
    @SG6298G Год назад

    Why ahem?
    And where were you heading to?
    What time?

  • @BOSS99t
    @BOSS99t Год назад +3

    manual screen system😂

  • @curiousjj
    @curiousjj Год назад

    I didn’t see a train fault before

    • @jktrainss
      @jktrainss  Год назад

      Very common nowadays 😂😂😂😨😨😨

  • @realcartoongirl
    @realcartoongirl 2 года назад +2

    HAHA SO FUNNY

    • @curiousjj
      @curiousjj Год назад

      😅 me too I also think it is funny and stupid

  • @JackTeoRides
    @JackTeoRides Год назад

    Looks like they are playing with the doors but they are not

  • @amos8827
    @amos8827 2 года назад

    The stupid platform stuck at the middle

  • @svc855bsoe
    @svc855bsoe 2 года назад

    All KSF Trains will be taken out of service permanently from 2035 to 2040, 8th Generation Trains is to replace all 92 KSF Trains, All Current NSEWL Fleets will be taken out of service permanently by 2040, No more C151, c651, c751b, c151a,b,c trains on nsewl anymore since 2040, they all replace by r151 and r151a aka 8th Generation trains

  • @curiousjj
    @curiousjj Год назад

    Only one difference one train different design

    • @jktrainss
      @jktrainss  Год назад +2

      Yup its a different generation but fairly similar still (C151B & C151C)

  • @SG6298G
    @SG6298G Год назад

    What date?

  • @realcartoongirl
    @realcartoongirl 2 года назад +1

    Be Be Be
    M M M