PS122 Base Load and Peak Load Power Plants

Поделиться
HTML-код
  • Опубликовано: 29 окт 2024

Комментарии • 9

  • @surendrakverma555
    @surendrakverma555 2 года назад +1

    Excellent lecture Sir. Thanks 🙏🙏🙏

  • @053_abdulhannanbhat8
    @053_abdulhannanbhat8 2 года назад +1

    sir after the derivation for minimum cost i did not get how the peak plant should operate for (a1-a2)/(b2-b1). time 9:30. plz explain

  • @ritikgupta7095
    @ritikgupta7095 3 года назад

    Bahut hi saandaar video thi sir ❤️

  • @joydeep8010
    @joydeep8010 8 месяцев назад

    Nicely explained

  • @yogendrapal3633
    @yogendrapal3633 4 года назад

    Kya bat h sir power plant start kR diye thanks sir

  • @sumayashaik6357
    @sumayashaik6357 Год назад

    So helpful sir

  • @monieshrajs5217
    @monieshrajs5217 2 года назад

    Sir @8.00 it is mentioned that x1 - units generated by base load plant is a constant. @8.39 it is mentioned that x1 is variable and being taken as dx1/dp1. which one is correct sir. And if x1 is variable then why x is not a variable quantity sir, which is total units generated in the power plant. I'm confused sir. Please answer me......

  • @apgupta78
    @apgupta78 4 года назад

    Sir do your channel have full nit electronic engineering course

    • @apgupta78
      @apgupta78 4 года назад

      @@lecturesinelectricaleng so what do you provide in ur channel