Sir @8.00 it is mentioned that x1 - units generated by base load plant is a constant. @8.39 it is mentioned that x1 is variable and being taken as dx1/dp1. which one is correct sir. And if x1 is variable then why x is not a variable quantity sir, which is total units generated in the power plant. I'm confused sir. Please answer me......
Excellent lecture Sir. Thanks 🙏🙏🙏
sir after the derivation for minimum cost i did not get how the peak plant should operate for (a1-a2)/(b2-b1). time 9:30. plz explain
Bahut hi saandaar video thi sir ❤️
Nicely explained
Kya bat h sir power plant start kR diye thanks sir
So helpful sir
Sir @8.00 it is mentioned that x1 - units generated by base load plant is a constant. @8.39 it is mentioned that x1 is variable and being taken as dx1/dp1. which one is correct sir. And if x1 is variable then why x is not a variable quantity sir, which is total units generated in the power plant. I'm confused sir. Please answer me......
Sir do your channel have full nit electronic engineering course
@@lecturesinelectricaleng so what do you provide in ur channel