The long pre ring on the level crossing is due to the X2000 Highspeed trains, who have a march speed on 200 km/h (124,3 mph). The automatic ignition unit of the level crossing is placed 3,5 km (2,17 miles) before the level crossing, and the X2000 trains needs 2,5 km (1,55 miles) to made a full stop, if the signal tells the engine driver that the level crossing is not secured.
Double passing trains
And SUPER FAST
Those crossing bells sounded almost musical. But why did it take so long for the gates to go down?
So people have a warning if they are stuck on the tracks
@@SuraLeo
I suppose that makes sense. Thanks for the heads up.
The long pre ring on the level crossing is due to the X2000 Highspeed trains, who have a march speed on 200 km/h (124,3 mph). The automatic ignition unit of the level crossing is placed 3,5 km (2,17 miles) before the level crossing, and the X2000 trains needs 2,5 km (1,55 miles) to made a full stop, if the signal tells the engine driver that the level crossing is not secured.
So people Can see and its not the same as in USA where they go down immediately;-;
Leuk!
den kunde ha stängt av motorn
galet
Ooòoòòooooo
192 -petemmon
4
お
Mgus
ؤ
DAMER ER HØYR-GRAVID MED ROBERT RONESS KLOKKA O8: OO
7j l