Railway crossing Vingåker

Поделиться
HTML-код
  • Опубликовано: 15 янв 2025

Комментарии • 19

  • @maoelanaronny
    @maoelanaronny 3 года назад +5

    Double passing trains

  • @michaelpalmieri7335
    @michaelpalmieri7335 3 года назад +7

    Those crossing bells sounded almost musical. But why did it take so long for the gates to go down?

    • @SuraLeo
      @SuraLeo 3 года назад +1

      So people have a warning if they are stuck on the tracks

    • @michaelpalmieri7335
      @michaelpalmieri7335 3 года назад +1

      @@SuraLeo
      I suppose that makes sense. Thanks for the heads up.

    • @casperklvejensen5541
      @casperklvejensen5541 3 года назад +3

      The long pre ring on the level crossing is due to the X2000 Highspeed trains, who have a march speed on 200 km/h (124,3 mph). The automatic ignition unit of the level crossing is placed 3,5 km (2,17 miles) before the level crossing, and the X2000 trains needs 2,5 km (1,55 miles) to made a full stop, if the signal tells the engine driver that the level crossing is not secured.

    • @noahmga
      @noahmga Год назад

      So people Can see and its not the same as in USA where they go down immediately;-;

  • @levelcrossingspotter-lcsra3368
    @levelcrossingspotter-lcsra3368 4 года назад +4

    Leuk!

  • @meandnature6452
    @meandnature6452 3 года назад +4

    den kunde ha stängt av motorn

  • @utsimba
    @utsimba 6 лет назад +5

    galet

  • @elangalafghany3692
    @elangalafghany3692 3 года назад +1

    192 -petemmon

  • @bartkuijpers7257
    @bartkuijpers7257 3 года назад +2

    4

  • @小川亮司
    @小川亮司 3 года назад +1

  • @leonardoarayalschauy524
    @leonardoarayalschauy524 3 года назад +1

    Mgus

  • @moustawiyassine550
    @moustawiyassine550 3 года назад

    ؤ

    • @robertroness6635
      @robertroness6635 3 года назад

      DAMER ER HØYR-GRAVID MED ROBERT RONESS KLOKKA O8: OO

  • @haal4421
    @haal4421 3 года назад +1

    7j l