yoooo I saw you at Punggol MRT when I was there :) I took the Punggol LRT beforehand, and I saw the MRT departure indicators at the LRT level saying 'NE18 Punggol Coast 3 min'. A rare catch for sure (at least for me), we are really getting a feel of what having P Coast station as an MRT station will be like now :DDD
It’s actually red lights underneath, it’s the Automated Track Inspection system fitted on this particular trainset. ATI trains can be used to inspect the tracks to help detect any rail defects.
at least you found me at Punggol for the first time 😃
ah
yoooo I saw you at Punggol MRT when I was there :)
I took the Punggol LRT beforehand, and I saw the MRT departure indicators at the LRT level saying 'NE18 Punggol Coast 3 min'. A rare catch for sure (at least for me), we are really getting a feel of what having P Coast station as an MRT station will be like now :DDD
ah
ati on🔥🔥
inspecting PGL-PGC be like
Wow C851E ATI on. Hey since the punggol on test and the entire NEL cleaned and fresh look in the tunnel?
Yarrl
🤔
4:10 GET OUTTTTTTTT
7097 says no
Why the nel train burning in bottom
It’s actually red lights underneath, it’s the Automated Track Inspection system fitted on this particular trainset. ATI trains can be used to inspect the tracks to help detect any rail defects.
WOAH I NEED TO CHECK THIS OUT
When PGC opens kzao
Signages to be changed soon once Punggol Coast station is opened
yes
So if their testing for the Punggol Coast Extension, what is going to happen during AM and PM withdrawals? Are they gonna keep testing or what?
that one dunno what happens during weekdays but need to observe
@@markraphaeldivina Went on 20 September, no testing to Punggol Coast. :(
welp