Cherry Creek Minor Tributaries - Joplin Tributary Alternatives

Поделиться
HTML-код
  • Опубликовано: 8 сен 2024
  • The Joplin Tributary exhibits minor erosional issues within its’ open channel, along with opportunities for water quality treatment. This video describes the alternatives evaluated for the Joplin Tributary as part of the Cherry Creek Minor Tributaries Major Drainageway Plan. For detailed information about the three alternatives evaluated here, along with the additional considerations, visit the Alternatives Analysis Introduction video.
    Acronyms Encountered in this video:
    MHFD Mile High Flood District
    CCBWQA Cherry Creek Basin Water Quality Authority
    SEMSWA Southeast Metro Stormwater Authority
    FHAD Flood Hazard Area Delineation
    MDP Major Drainageway Plan
    WQCV Water Quality Capture Volume
    AC-FT Acre-Feet (Volume)
    RCPs Reinforced Concrete Pipes
    LF Length in Feet
    RCBCs Reinforced Concrete Box Culverts
    CMP Corrugated Metal Pipe
    HFLM High Functioning Low Maintenance

Комментарии •