Montana Mounting Guide - modules in a vertical composition on a double layered drywall

Поделиться
HTML-код
  • Опубликовано: 11 сен 2024
  • This guide will help you mount Montana shelving modules in a vertical composition on a double layered drywall.

Комментарии • 2

  • @digitalmunky
    @digitalmunky 5 лет назад

    Hello... You use the word "plaster" in your video description... Yet I'm not seeing where your technique would vary between drywall or plaster walls... I don't even see how it is that you located the studs in the wall in this video... Is this in fact a "plaster" wall or was this a drywall wall?... Many people may be looking for specific instructions to work with one or the other and not all techniques apply to both surfaces.

    • @MontanaFurniture
      @MontanaFurniture  5 лет назад

      Hi, This actual wall is a double layered Drywall and not a plaster wall as described in the video. We apologize for the mistake. As it is a double layered plaster wall, it is not necessary to locate the stud. On plaster walls, you will need to locate the stud, as the plaster and support is not stable enough to carry the load. The plugs we use are suitable for both dry walls and concrete walls. The advantage with a drywall is that you can easily mark up where you need to drill the holes. This can be slightly more difficult on concrete walls, and you may need to adjust the screws more before mounting if the holes are not all aligned. If you have any further questions, please contact salessupport@montana.dk. Kind regards Montana Furniture