HS2 Construction Progress Lower Radbourne to Long Itchington Tunnel, September 2024

Поделиться
HTML-код
  • Опубликовано: 3 дек 2024

Комментарии •

  • @djengines
    @djengines 3 дня назад +2

    I guess the doughnut shop was open because I didn't see anyone actually doing any work.

    • @theboy-uk
      @theboy-uk  3 дня назад +1

      Do you ever see much activity on this construction project?

    • @StevieProton
      @StevieProton День назад +1

      I've watched all these videos and I've never seen even one person working.

    • @theboy-uk
      @theboy-uk  День назад

      @@StevieProton As they say on motorway repair works, I;m sure that "Our contractors are working out of sight" 🤣

  • @willhemmings
    @willhemmings 18 часов назад +1

    One great benefit of the HS2 route is that its south-east, north-west alignment gives lovely light conditions. You picked a beautiful day to go aloft. This is the first time I have seen a video across the top of the tunnel; and I can't help thinking that the surveyors were making a point to detractors by brazenly demonstrating that economies were being effected down to the millimetre when they built the north portal so tight to the edge of the wood a squirrel couldn't pass between them

    • @theboy-uk
      @theboy-uk  9 минут назад

      I do usually try to get both portals of this tunnel in in my 6 monthly updates, time and weather depending, although I don't often turn and look back at the North Portal in the videos I put up, as I usually edit the video to carry on a little further.
      The light was kind, in between the rain showers, on the days I filmed this section :).

  • @robodrone5662
    @robodrone5662 3 дня назад +2

    Do you think it will be ready during our lives time?

    • @theboy-uk
      @theboy-uk  3 дня назад +1

      Not in any useful way, no.