UPDATE: Cracked Blue Mesa Reservoir bridge shuts down travel on US 50 to Gunnison
HTML-код
- Опубликовано: 16 сен 2024
- UPDATE - A routine inspection late last week revealed a tiny crack only about four inches long in the steel of the bridge. CDOT crews took a closer look and studied the bridge with a sonar device revealing a much bigger crack inside the steel.
Officials don't know when the bridge will reopen. CDOT says more testing needs to be done to find out the true extent of the damage.
Holy cow what a great news story. I feel like I really learned about the situation and its impact and possible work arounds. I don't believe the national networks cover stories as well as this. Great job from that reporter and his team.
here in Montreal were were in the same situation for a bridge older than 55 years and we were going to a hell situation for the past 8 months. Hopefully you folks won't get that long until is re-opened.
how about welding the crack and welding new beams to the outside
The freakin bridge needs to be replaced
This is terrible. I hope the bridge re-opens soon.
When your company is dependant on one road to bring in customers, it's destined to fail. Time to pack up your bags and move to a new location.
They aren’t dependent on one road ya cha chi.