Richard I love it. It has been a great year with the progress of your layout. I thank you and your family for your friendship and help with my layout. Happy Holidays to you and your family.
Wow! That was very impressive, and thank you so much for the tour of the layout. I spotted your K-line remote for operating cars next to your transformers. I love those cars. They bring so much fun to the operation of delivering cars.
You got the Belt.King of the Model Railroad Layouts.You did a great job with that track pattern.How many switches do you have? And can I see see some uncoupling and coupling operations?
@@OgaugeTrainsplusslotCars thanks for subscribing and the great feedback! I have 93 switches and counting! Lol once i get the power plant area trac finished ill try to video a switching move of hopper cars
@ I building a third level.It will be connected to bottom two levels.I also have a rail set to go underneath bed.God willing I will be using some Atlas Track for third level.
Please like, share and Subscribe!
Ok iam subscribed and I watched the whole video and give you a like
I like those videos better than watching trains run around. Looking forward to seeing scenery.and Moore buildings
Thanks for the tour, love what you are doing. I also re-wired my layout when I added DCS. Its worth the effort !
Looking good. Merry Christmas 🎄
Thanks for Sharing! Merry Christmas to you and your Family.
WOW…thanks for the tour…hope you had a wonderful Christmas…
Richard I love it. It has been a great year with the progress of your layout. I thank you and your family for your friendship and help with my layout.
Happy Holidays to you and your family.
Looking forward to spending more time with you as well! Merry Christmas!
Wow! That was very impressive, and thank you so much for the tour of the layout. I spotted your K-line remote for operating cars next to your transformers. I love those cars. They bring so much fun to the operation of delivering cars.
Waiting on drone shots my friend
Its always funny watching the Alaska collection on the video. Got it. Got it. Have the MTH version. Got it, want it but got no space to put it... 😅😂
Me either!
happy holidays, love your layout
All my grandkids call me Poppop!
@@KandRCustomModels i have 6 grandkids they love my trains
You got the Belt.King of the Model Railroad Layouts.You did a great job with that track pattern.How many switches do you have? And can I see see some uncoupling and coupling operations?
@@OgaugeTrainsplusslotCars thanks for subscribing and the great feedback! I have 93 switches and counting! Lol once i get the power plant area trac finished ill try to video a switching move of hopper cars
@ I building a third level.It will be connected to bottom two levels.I also have a rail set to go underneath bed.God willing I will be using some Atlas Track for third level.