MBTA Commuter Rail on the Newburyport/Rockport Line - May 2023

Поделиться
HTML-код
  • Опубликовано: 27 дек 2024
  • Thank you for watching and I hope you enjoy the video. If you are new here, my channel mostly consists of railroad videography from around the Northeastern USA. Please note that all content that I post is mine and should not be used without my consent. If you are interested in more content from me, my photography can be viewed on Instagram at: / rail_spike_productions
    About this video: On my channel, I post monthly videos compiled of clips of MBTA commuter trains on the Newburyport/Rockport Line, the eastern most commuter rail line on the north side of MBTA’s system. The line runs from Boston’s North Station to Beverly, where it then splits and continues on to both Newburyport and Rockport. In the May 2023 edition, clips that appear were filmed in the towns of Salem, Beverly, Hamilton, Ipswich, or Rowley, Massachusetts.

Комментарии • 12

  • @mbtarailfanner63
    @mbtarailfanner63 Год назад +3

    Another awesome video!

  • @TLT_Productions
    @TLT_Productions Год назад +2

    do you know when f40-3C 1071 and 1072 are coming back from rebuilt?

    • @rail_spike_productions
      @rail_spike_productions  Год назад +1

      Considering that some F40s that were sent out for rebuild in 2021 like 1033 are still not back, I’m sure it will be at least a year

    • @TLT_Productions
      @TLT_Productions Год назад +1

      @@rail_spike_productions oof, that sucks. thanks for the info

    • @MBTAAmtrakProds6805
      @MBTAAmtrakProds6805 Год назад

      ​@@rail_spike_productionsThey Haven't been doing any MBTA tests because there on strike

    • @rail_spike_productions
      @rail_spike_productions  Год назад +1

      Yep, that’s why it’s expected to take a while

  • @ericschwartz3559
    @ericschwartz3559 10 месяцев назад

    Why is this rebuild program taking so long? The $78.3M contract awarded by the MBTA's FMCB at their 04/29/2019 board meeting to Motive Power, Incorporated of Boise, Idaho, originally called for the last of the 27 to be completed and shipped back to Boston by late autumn of 2021.

    • @rail_spike_productions
      @rail_spike_productions  10 месяцев назад

      Part of the delay is related to last year’s strike of employees at MPI

  • @ericschwartz3559
    @ericschwartz3559 10 месяцев назад

    Why does 1031 have a big dent on its nose just below the headlight? Needs to be repaired at bet.

    • @rail_spike_productions
      @rail_spike_productions  10 месяцев назад

      It hit a tree in at least 2021 and 2022. That unit keeps getting damaged and fixed haha

    • @ericschwartz3559
      @ericschwartz3559 9 месяцев назад +1

      I guess 1031 is just unlucky.😂