Northbound CSX S991-12 High & Wide Turbine

Поделиться
HTML-код
  • Опубликовано: 6 фев 2025
  • This was a loaded high & wide movement of an onshore wind turbine built at the GE plant in Schenectady, NY & headed to the Land O' Lakes/ Tampa, Fl area for offloading.

Комментарии •