Diamond Kote RigidShake Installation - Built on LP SmartSide
HTML-код
- Опубликовано: 17 окт 2024
- Learn more about 30-Year No Fade RigidShakes, a shake/shingle product from Diamond Kote Building Products: bit.ly/2Oqd29t
This installation instructional video will show you installation requirements for Diamond Kote RigidShakes, to include fastening, gapping and correct offset pattern.
We cover the proper starter options making it easy to select the right one for your application. After watching you’ll also have a better understanding of the advantages and benefits of installing RigidShakes.
Staggered Edge and Straight Edge RigidShakes are backed by LP® SmartSide® 5/50-Year Limited Warranty and Diamond Kote® 30-Year No Fade Finish Warranty.
For complete installation instructions, please refer to our application guide: bit.ly/2OB8v3V
#siding #lpsmartside #shakesiding
Can this go directly over painted cedar that is flat, not shake
7 year old new construction with Diamond kote over LP siding and it’s chalking and fading badly, their warranty was giving me 12 gallons of paint that I have to apply
Cari, please continue working with your Claims Representative. They are available for any questions you have regarding your claim.
what size top trim board is used in the video for the board and batten? Is it a 5/4 board and if so did you use the 1" drip cap for it
You are correct. A 5/4 trim board was used with a 1" drip cap.
What color is the board and batten and lap siding behind you in the video?
Thank you for your question. The color shown is no longer part of our color offering.
How much clearance between asphalt and LP Smartsuite should there be?
Great question Rock! There needs to be a minimum of 1 inch clearance between the bottom of the siding and a hard surface such as asphalt or concrete. Clearance from grass or mulch for example should always be a minimum of 6 inches. Hope this helps!
How is the squad charged?