Max power CT35 Bow thruster installation

Поделиться
HTML-код
  • Опубликовано: 2 ноя 2024

Комментарии • 13

  • @johnbeskow4820
    @johnbeskow4820 7 лет назад

    Measure twice cut once good job well done !

  • @madbstard1
    @madbstard1 7 лет назад

    Lovely work Fergal!

  • @Brenna79
    @Brenna79 7 лет назад

    Some job. Hope you're on the mend

  • @lasselaursen6400
    @lasselaursen6400 7 лет назад

    How did you measure out the placement ? Do you have any guides on that ? br Last

    • @1968ferg
      @1968ferg  7 лет назад

      The top of the tunnel should be 185mm below the waterline and as far forward in the bow as you can get it.

  • @jameshoward7845
    @jameshoward7845 3 года назад

    What size PVC pipe does that require?

    • @1968ferg
      @1968ferg  3 года назад +1

      It's a 125mm fiberglass tube, I'm not sure you could use PVC as it would be harder to fiberglass inplace.

  • @jonwallace7015
    @jonwallace7015 Год назад

    Arses would fit a system on this

  • @maliquepatterson72
    @maliquepatterson72 2 года назад

    Easy

  • @overlanderengel5787
    @overlanderengel5787 3 года назад

    Propeller does not seem to be well balanced

    • @1968ferg
      @1968ferg  3 года назад +1

      4 years later and no problems with it, there is a rubber gasket between the motor and the tube so I would expect a small bit of movement as it's quite a powerful motor.

    • @overlanderengel5787
      @overlanderengel5787 3 года назад +1

      @@1968ferg cool .