LTM1750 TYV2EN assembly (part2)

Поделиться
HTML-код
  • Опубликовано: 5 окт 2024

Комментарии • 41

  • @jbonegw
    @jbonegw 5 лет назад +17

    The engineering that went into designing this. 😳

  • @backho12
    @backho12 2 года назад

    Good to know that $6,000,000 still buys something of value!

  • @Hoka613
    @Hoka613 3 года назад +1

    Я давно работал на Terex CTT 721-40 hd83, очень хороший кран

  • @fightingirish8584
    @fightingirish8584 2 года назад

    Impressive. Great music at the end to go with the lift.

  • @FredPalmerJr1
    @FredPalmerJr1 5 лет назад +1

    This behemoth towered over the sky cranes. What an epic machine this is indeed. Extremely impressive.

  • @raphaelgmur3898
    @raphaelgmur3898 5 лет назад +6

    WOOWWW!!! What an incredible crazy machine!! 😳😳😳😳

  • @holbra
    @holbra 5 лет назад +1

    amazing video. Very good workers

  • @neilskineilo
    @neilskineilo 5 лет назад +14

    Epic crane
    Epic setup
    Epic video
    Well done
    I have a similar video of a Ltm 1750 build but not as good as yours
    Kudos

  • @l.a.2646
    @l.a.2646 5 лет назад +7

    enjoyed watching both parts. was the tower crane in the foreground disabled ( why the mobile unit brought into service?) very impressive machine I've loved mobile cranes ever since I was a young lad never able to get close enough to one of these monsters to see how it's set up, I would love to see more videos like this- thank you!

    • @davidruss7702
      @davidruss7702 5 лет назад +8

      Lon Shaffer pretty sure it was there to take down the tower cranes. You can see it removing counterweights from the tower crane that is mostly out of frame at the end of the video.

  • @iamsteveofficial8233
    @iamsteveofficial8233 4 года назад +4

    the red elevator.... 0.00 - 13.30

  • @V-Mann
    @V-Mann 5 лет назад +2

    Nice video with cool background music

  • @Patnaples5881
    @Patnaples5881 5 лет назад +5

    Holy shit , that is amazing 🤦‍♀️

  • @TimCBuilders
    @TimCBuilders 5 лет назад +7

    so wait a sec. That was to break down a tower crane? seems quite pricey.

    • @Niidforseat
      @Niidforseat 4 года назад +1

      Exactly my thoughts.
      An LTM1750 to disassemble a tower crane? Awesome! Than there's where I live: Use a four-axle crane to disassemble a tower crane :/

    • @Nobdy77
      @Nobdy77 4 года назад +1

      @@Niidforseat Yes, but try to disassemble a tower crane this far away with a 100 - 200t crane...
      This would not work

    • @Niidforseat
      @Niidforseat 4 года назад +1

      @@Nobdy77 Sure dude. I was certain they calculated their stuff before building up this giant.

  • @isaccozampieri3164
    @isaccozampieri3164 5 лет назад +5

    Thank you very much for posting these awesome videos! I'd love to see a 750 with my own eyes! Just curious: is the exact configuration 49,1 m of main boom (92-92-92), 10,0 m V2, 5,0 m VE and 45,5 m of luffing jib (and of course the Y guide)?

  • @johnsimpson4191
    @johnsimpson4191 5 лет назад +1

    Awesome JOB.. WHAT A MACHINCE..

  • @djbraginn
    @djbraginn 5 лет назад

    Очень круто! Супер :)

  • @BohdanAstro
    @BohdanAstro 5 лет назад +3

    Very good job! Thanks a lot! At the end of video LTM1750-9.1 dismantles Terex Comedil CTT561. The other tower cranes seems like Yongmao. But what models?

  • @paulcapel5251
    @paulcapel5251 5 лет назад +1

    Very good upload. Thank you.

  • @zavod-311
    @zavod-311 5 лет назад +1

    3:38 nice song

  • @한먱
    @한먱 5 лет назад

    very good~!!!!!!!!

  • @ger13nunyah56
    @ger13nunyah56 4 года назад

    Nice

  • @gutorocha2346
    @gutorocha2346 5 лет назад +1

    Top

  • @SiiliViin
    @SiiliViin 5 лет назад +3

    How much this full set weights? 1750 itself is 108 tonnes, maximum counterweight is little above 200 tonnes and boom extender also, so I think it is around 400 tonnes?
    How many hours you need to setup 1750 without boom extender as in part1?

    • @nostopalveluj.helaakoskioy5481
      @nostopalveluj.helaakoskioy5481  5 лет назад +15

      Close.. The weight is prox. 390tn. The assembly time is, of course, connected the site.
      If the site is challenging, some 12 to 16 hours. If site is "empty" and everything go smoothly 8 hours.

  • @rubemsousa152
    @rubemsousa152 5 лет назад

    🔝

  • @maozedong981
    @maozedong981 5 лет назад +1

    I bet, the crane can not lift itself. lul

  • @godbluffvdgg
    @godbluffvdgg 5 лет назад

    Hey, If you can think of an better way to move two small boxes from one side of the site to the other, 12:50, I'd like to hear about it!

    • @MrJonah53
      @MrJonah53 5 лет назад +1

      Counter weights from another tower crane, or were you trying to be funny.

    • @godbluffvdgg
      @godbluffvdgg 5 лет назад

      @@MrJonah53 :)...Yeah, I was just breakin balls...We senior construction guys are allowed to...:)

  • @samihhadid
    @samihhadid 5 лет назад

    I will buy one, one day inshalla

  • @MrBillFold
    @MrBillFold 5 лет назад

    What's the charted capacity for the furthest lift and/or set radius? Just was curious.