3rd Floor progress July 1, 2021

Поделиться
HTML-код
  • Опубликовано: 5 фев 2025
  • July 1, 2021 Progress since 6-14-2021 on the 3rd floor. Walls are up, vertical supports up. Preparing the reinforcing for the top horizontal beam that will cap the block wall. Steel roof structure mounting brackets will go on the horizontal beam. Pitched steel trussing on those and then the polymer tile on the structure.