Schindler Corporate Video - INEX

Поделиться
HTML-код
  • Опубликовано: 15 авг 2020
  • Schindler has introduced new machinery named INEX (Innovative Experience) which will occupy less space and give results much faster then previous machinery

Комментарии • 16

  • @aryanpatel9822
    @aryanpatel9822 2 месяца назад

    This technology inex is very smart and ezy installation , next level safety, not carry havey Lod .
    I'm trand inex installation This technology very useful I really like this.❤
    🍁 Schindler elevator 🍁

  • @dileswaradesudu
    @dileswaradesudu 8 месяцев назад

    Main rope hoisting machine side top balustrade could be damaged because a long time rubing to top balustrade.
    Main rope entry side small spring (Rope Protection)
    The spring is required big size (Example - Bottom side spring means rope exit way side spring)

  • @TheTest75
    @TheTest75 2 года назад +1

    I bought Schindler's elevator but unfortunately, it is not functional since installed (5 months) because the Schindler elevator does not work with a voltage stabilizer. In India, it is hard to get an area where all three-phase have proper voltage (May be in very few places).
    But when you ask Schindler for the solution they don't have a good option. They suggest to get the line voltage corrected, which is not in our control..
    In my opinion, Schindler should come forward to help customers for resolving the issue and gain customer satisfaction.

  • @tauhidalislam3799
    @tauhidalislam3799 3 года назад

    Indian product Schindler dotmitrx display not given good brightness. And TFT, LCD Display can use?

  • @TheTest75
    @TheTest75 2 года назад +1

    All good technology is a waste if end goal is not achieved..

  • @MinalShewale
    @MinalShewale 3 года назад

    Location?

  • @thecuberking8005
    @thecuberking8005 2 года назад

    Sir me Jaipur me kam karna h

  • @dineshkisku8847
    @dineshkisku8847 2 года назад

    May is filed me kam karna chta hu sir please help me iti pass out in fitter

  • @pipaliyaparvati9369
    @pipaliyaparvati9369 Год назад

    sighler narayan pura ahm office chhe and head office Mumbai chhe

  • @sunilclassical3013
    @sunilclassical3013 9 месяцев назад

    Sir I want to job in Raipur elevator installation I have one year experience for Schindler