Foundations for offshore wind turbines

Поделиться
HTML-код
  • Опубликовано: 15 ноя 2024

Комментарии • 4

  • @92Pyromaniac
    @92Pyromaniac 3 года назад +1

    Thanks for taking the time to upload this. Really interesting talk!

  • @michaelbacqalen1109
    @michaelbacqalen1109 2 года назад +1

    It seems better control of the centrifuge acceleration is necessary. For CEIGR, 50mm times 38 equals 1900mm, but for COFS, 52mm times 39 equals 2028 and UoN have 60mm times 31 equals 1860mm. The prototype pile each of centrifuge modelled is slightly different

  • @hasanshahriyer45
    @hasanshahriyer45 3 месяца назад

  • @mohamedalishafiqueahmed9496
    @mohamedalishafiqueahmed9496 2 года назад

    Au world island