How to install a fire-resistant vapour control layer - Partel IZOPERM PLUS FR Product Installation

Поделиться
HTML-код
  • Опубликовано: 15 июл 2024
  • Correct installation of IZOPERM PLUS FR Class A2 on the internal wall and ceiling will radically improve the structural fire safety in buildings, while controlling the water vapour for active moisture management. It ensures maximum fire protection and thermal performance.
    This video is part of the Smart Airtightness Works Series | Video 5.
    For further information about the Partel IZOPERM PLUS FR Class A2 product system, please visit:
    www.partel.com | www.partel.co.uk | www.partel.ie
    #smartairtightnessworks​​​ #airtightness​​​ #buildingenvelope​​​ #moisturemanagement​ #maximumfiresafety #fireprotection #partelbuildingenvelope​​​ #performancebuilding​​​ #structuralfiresafety
  • ХоббиХобби

Комментарии • 2

  • @rich7123
    @rich7123 2 года назад +1

    Hi,
    How do you fix the vcl on the head of envelope wall between concrete slab with deflection?
    Usually most vcl stick to the underside of the concrete slab

    • @PartelBuildingSystems
      @PartelBuildingSystems  2 года назад

      Hi Richard,
      For sealing to concrete, we recommend ECHOSEAL ALU FR to seal against.
      For the underside of the concrete slab, we recommend a seal as you would if you were installing an airtightness membrane onto a wall and turning it up onto a ceiling, this can be folded over onto the ceiling and sealed again with ECHOSEAL ALU FR.
      For further information, please contact technical@partel.com.