Underwater Metro Kolkata | Howrah Maidan To Esplanade Metro Full Information | Kolkata Metro Journey

Поделиться
HTML-код
  • Опубликовано: 4 окт 2024
  • The Kolkata Metro is a rapid transit system serving the city of Kolkata and the wider Kolkata Metropolitan Region in West Bengal, India. Opening in 1984, this is the first operational rapid transit system in India, beside being the second busiest and fourth-longest metro network in India. As of March 2024, it has four operational lines: the 32.33 km (20.09 mi) Line 1 from Dakshineswar to Kavi Subhash, 13.9 km (8.6 mi) Line 2 from Salt Lake Sector V to Howrah Maidan (with a gap between Sealdah and Esplanade), 7.75 km (4.82 mi) Line 3 from Joka to Majerhat and 5.4 km (3.4 mi) Line 6 from Kavi Subhash to Hemanta Mukherjee for a total of 59.38 km (36.90 mi).[3][4] Two other lines are in various phases of construction and planning. The system has a mix of underground, at-grade and elevated stations using both broad-gauge and standard-gauge tracks. Trains operate between 06:55 and 22:30 IST and the fares range from ₹5 to ₹50.
    The Line 1, Blue Line, also known as North-South Metro of the Kolkata Metro, is a rapid transit system serving Kolkata in Indian state of West Bengal. It consists of 26 operational stations from Dakshineswar to Kavi Subhash. Nine of the stations are elevated, 2 at-grade and the remaining 15 are underground, with a total distance of 32.13 km (19.96 mi). The line connects Dakshineswar and New Garia and uses 5 ft 6 in (1,676 mm) 5 ft 6 in (1,676 mm) broad gauge rolling stock. Dakshineswar was opened on 22 February 2021 is an elevated station located 4.1 km (2.5 mi) north of Noapara. It was the first underground railway to be built in India, with the first operations commencing in October 1984 and the full stretch that was initially planned being operational by February 1995. On 28 December 2010, it became the 17th zone of the Indian Railways.[2] Being the country's first, and a completely indigenous process, the construction of the Kolkata Metro was more of a trial-and-error affair, in contrast to the Delhi Metro, which has seen the involvement of numerous international consultants. As a result, it took nearly 23 years to completely construct around 15 km (9.3 mi) underground railway from Birpara up to Tollygunge Metro Station.
    Kolkata Metro Line 2, also known as the East-West Metro and Green Line, is a rapid transit line of the Kolkata Metro in the Indian state of West Bengal. It currently consists of two operational sections between Salt Lake and Sealdah, and Esplanade and Howrah by going underneath the Hooghly River, with an eastern extension planned for Teghoria.[1][9] It will cover a distance of 32.11 km (19.95 mi) and consist of 17 stations from Teghoria (Haldiram) in the east to Howrah Maidan in the west, of which it will consist of 11 elevated and 6 underground stations, and the operational section consists of 6 elevated and 5 underground stations, with a total distance of 22 km (14 mi). It is expected to derive a very high ridership, since it will connect India's two largest commuter railway and long-distance railway terminals, Howrah and Sealdah, along with two of its largest business districts, BBD Bagh and Salt Lake Sector V. At present, more than 100,000 passengers commute through the line everyday, and this figure is expected to go upto 1 million after it gets fully completed by 2035.[5] It will also connect the industrial hub of Kolkata, i.e., Howrah and the IT hub of Kolkata, i.e., Salt Lake Sector-V.[11] It connects Line 1 at Esplanade and will eventually connect Lines 3 and 6.
    The Line 2 has India's first and biggest underwater metro tunnel, along with the deepest metro ventilation shaft.[12][13] In the deepest metro shaft, the Howrah metro station is be the deepest metro station in India, at a depth of 33 m (108 ft).[14] The first phase between Salt Lake Sector V and Salt Lake Stadium was inaugurated by the then Minister of Railways, Piyush Goyal, on 13 February 2020, and commercial services started from 14 February 2020.[6][15] The underground stretch till Phoolbagan was opened on 4 October 2020 by the current Minister of Railways, Ashwini Vaishnaw, and then till Sealdah was opened on 12 July 2022.[7][8] The section between Esplanade and Howrah Maidan was inaugurated by Prime Minister Narendra Modi on 6 March 2024,[16] leaving the gap between Esplanade and Sealdah as the only remaining unopened section.
    In December 2023, Kolkata Metro added blue light in the underwater tunnel section to give passengers a sense of feeling under Hooghly River alongside other lights in the tunnel
    #kolkata #kolkatametro #howrah #metro #underwater

Комментарии • 6