HOW TO PROGRAM LAE AT2-5 INTO CHILLER AND FREEZER SETTINGS (ENGLISH/TAGALOG)

Поделиться
HTML-код
  • Опубликовано: 20 окт 2024
  • A step by step programming of Lae digital control of commercial refrigerators is hereby present to all newbies in Refrigeration industry by On Call Technician. English and Tagalog language's are used so the world may understand.
    #ProgrammingLaeAt2-5
    #hvacr
    #OCTTV
    My Dixell Programming and Alarm Fixing:
    • DIXELL PROGRAMMING, AL...
    The author is a top notcher in Refrigeration and Air-conditioning and in Consumer Electronics, a certified Diesel Mechanic, Welder (SMAW), Cellular Phone Servicing and experienced Computer technician.

Комментарии • 22

  • @THEMULTISKILLEDTECH
    @THEMULTISKILLEDTECH  8 месяцев назад +1

    DFR if set to 3 hrs it means every 3 hrs your unit will defrost. Please don't divide into 24 hrs, it was thought to us wrongfully 🙏 I personally corrected this by sitting on unit and by observation

  • @NN-rk4mn
    @NN-rk4mn 8 месяцев назад

    Thank you men you are the best!!

    • @THEMULTISKILLEDTECH
      @THEMULTISKILLEDTECH  8 месяцев назад +1

      Sharing is caring sir😉

    • @NN-rk4mn
      @NN-rk4mn 8 месяцев назад

      Just one thing in manual def is right as you said in video. Cheers

  • @muhammadmohsin8284
    @muhammadmohsin8284 3 месяца назад

    ❤thank you pary for help about consepet

  • @emmaelliott7658
    @emmaelliott7658 Год назад

    God saver 🙏 thank you very much sir!

  • @rizwanahmed5127
    @rizwanahmed5127 Год назад

    Many thanks bro

  • @muhammadmohsin8284
    @muhammadmohsin8284 3 месяца назад

    many thanks brothrr❤❤

  • @mkofficial228
    @mkofficial228 8 месяцев назад

    Hello for chiller
    What about
    Os1,T2,os2,Tld,sim and Adr
    Please explain

    • @THEMULTISKILLEDTECH
      @THEMULTISKILLEDTECH  8 месяцев назад

      Os1 is room calibration
      Os2 is evaporator calibration
      T2 is probe 2 enabling or disabling. For chiller you may disable this coz chiller is heater less defrosting
      The rest isn't in my list sorry. Any way you may download this manual in Google

  • @boombeachgame1305
    @boombeachgame1305 Год назад

    I have off in screen any help!!
    ( In user manual stand-by!! )

    • @THEMULTISKILLEDTECH
      @THEMULTISKILLEDTECH  Год назад

      Sorry i don't have lae control right now to explore, hence keep reading the manual sir. The answer is there

  • @luketurner2196
    @luketurner2196 Год назад +1

    Hey how are you?
    My names Luke Turner and I am based in Perth.
    I am currently building an Ice Bath and need a refrigeration technician with the ability to get water to the temperatures between 0 degrees - 15 Degrees. Water volume will be equivalent to the size of a standard bath.
    I need assistance on what parts we will need and then also installation.
    Of course I am happy to pay for your time and knowledge.
    I would like to get this project moving quickly. So if you are interested please contact me. This is not a one off project, I am looking to build multiple ice baths going forward in the future.
    Thanks
    Have a great day
    Luke Turner

    • @THEMULTISKILLEDTECH
      @THEMULTISKILLEDTECH  Год назад

      I can assist you with control set up only sir. For dixell xr02cx is ideal dor your project just install contactor if compressor is above 1 hp.
      Set 0
      Hy 15
      Ls 0
      Us 15
      Idf 0
      You need evaporator coil with capillary, filter drier, conderser, and a compressor. About sizing you may consult an engineer sir.

    • @THEMULTISKILLEDTECH
      @THEMULTISKILLEDTECH  Год назад

      0 to -15°c or 0 to 15°c ?

    • @luketurner2196
      @luketurner2196 Год назад

      @@THEMULTISKILLEDTECH 0 degrees / 15 degrees

    • @luketurner2196
      @luketurner2196 Год назад

      0 to 15 degrees

    • @THEMULTISKILLEDTECH
      @THEMULTISKILLEDTECH  Год назад

      Follow my parameters 👆👆👆sir. For water in let you may do refilling manualy sir with a floater. This is similar with our chilled water used for dough production.