An Introduction to Void-Filled Riprap (VFR)

Поделиться
HTML-код
  • Опубликовано: 3 авг 2024
  • This video is intended for engineers and inspectors who may find themselves observing a void-filled riprap (VFR) installation in the field. The video discusses the origins, the intended use, materials, mixing, placement, and common problems associated with a VFR installation.
    00:00 INTRODUCTION
    03:07 VFR CHARACTERISTICS AND USES
    05:42 VFR MATERIALS
    08:15 VFR MIXING
    12:09 VFR PLACEMENT
    14:55 VFR COMMON PROBLEMS
    19:41 CONCLUSION

Комментарии • 3

  • @AnthonyLevine007
    @AnthonyLevine007 Год назад +1

    Absolutely fantastic video for geotechs. Thank you for taking the time to spread this info. Using it on some projects in California right now.

  • @adonis563
    @adonis563 2 года назад

    Thanks. Very informative. Any additional videos on how the different stones are seperated inside the quarry on a bigger scale?

  • @mountains889
    @mountains889 2 года назад

    Brandy Gulch?