  • @oggl60
    @oggl60 Месяц назад +9

    I am an Arquitect, my name is Oscar and I live in Baja California México, I participate in the construction of building of 10 floors, and we us a foundation like the one on the video, this was on 1998 in Mexicali, in baja California, we found water a seven meters in the excavation, is thee best foundation I ever participate, and we did it in a very seismic zone, and the two buildings perfect, with no cracking or dishevel, until now.

  • @ericavendanio4540
    @ericavendanio4540 11 дней назад +1

    they must be contructing a high rise bldg. becoz there applying '' combined footing '' making it the whole are looks likes a flooring..👍

  • @eddiemuaiava9805
    @eddiemuaiava9805 2 месяца назад +14

    I think you should've pumped out the water before you laid your sheets down.

  • @Schools-tb3ix
    @Schools-tb3ix Месяц назад +1

    Great job
    When having clay with groundwater , the best foundation is raft with strap beams like the one you did

  • @billblock8090
    @billblock8090 3 месяца назад +4

    Great content, As a 81 year old contractor, I appreciate your work. Also as civil engineer I would like to state a well known fact . The re-bar is to keep the concrete from shifting if it cracks. Proper mix concrete, with fiber, will make great columns.

  • @lecoqchantecom3009
    @lecoqchantecom3009 2 месяца назад +2

    very cool.

  • @eddiemuaiava9805
    @eddiemuaiava9805 2 месяца назад +4

    I Agree You've a strong foundation and floor but your pole columns have only 4 rebar, giving it less stability. Your plans sort of don't make sense there should of been at least 12 to each column. If you're having a concrete floor above or roof. Is there no kitchen in this build, no plumbing system, toilets, bathrooms, shower? Water drainage on the side of the building?

  • @16Galatv
    @16Galatv 3 месяца назад +2

    ❤❤❤❤❤

  • @angomsandipsingh
    @angomsandipsingh 3 месяца назад +3

    Strong foundation yet weak columns using only four iron bars in the columns. Precious money has been spent in the foundation vis - a-vis column strength.

    • @constructiontech2411
      @constructiontech2411  2 месяца назад

      thank you for sharing

    • @oggl60
      @oggl60 Месяц назад

      I thik that an engineer specialized calculate that

  • @tatacarias5102
    @tatacarias5102 11 дней назад

    Los abrigos tienen calefacción que lo que se ve al costado
    Por eso esos países son desarrollados son un solo equipo todos ellos

  • @ronojpayeng637
    @ronojpayeng637 2 месяца назад +1

    We don't use this much of iron and we don't make floor like this... Only normal size 12/12 inch beam , 4(16mm) + 2(12mm) is enough (same amount for the posts).. Maybe we spend this much only in the first floor, second floor etc

  • @melisizwedukuda395
    @melisizwedukuda395 2 месяца назад +3

    What if u unscrew ur excavator from your wheels because you keep turning unticlockwise.

    • @constructiontech2411
      @constructiontech2411  2 месяца назад

      Hello - this excavator can rotate both forward and backward.

    • @peterthebricky
      @peterthebricky 2 месяца назад

      Silly question in a condescending tone 😊

  • @JohnByrne-n1d
    @JohnByrne-n1d 2 месяца назад +1

    This has got to be just a rough base coat to keep them out of the muck while they are working

  • @ngatran544
    @ngatran544 2 месяца назад +1

    Nền đất yếu tại sao k dùng biện pháp móng cọc nhồi cho cứng cáp hơn mà phải nhất thiết là móng bè như vậy. bê tông dày 70cm mà không xây tường bao giữ nước lại để phần nước trong bê tông thất thoát ra ngoài

    • @constructiontech2411
      @constructiontech2411  2 месяца назад

      Chào bạn - trước đây vị trí này là một cái ao sâu khi san lấp đã đổ một khối lượng lớn các tảng bê tông xuống lên bây giờ khi làm nhà ko thể sử dụng biện pháp khoan nhồi hoặc nén cọc bê tông ạ - lên đã phải xử lý chọn cách làm móng bè ạ

  • @franksaga3413
    @franksaga3413 Месяц назад

    I think you should have pumped out water and cover the entire wet ground by rocks or rubbles before provision of polyethylene sheet.

  • @chewkc65
    @chewkc65 28 дней назад

    No safety boot or helmets? One guy wearing shorts. Is this a norm?

  • @단호박-u5o
    @단호박-u5o 2 месяца назад +3

    물에다 집을 다 짓냐?
    몸에 안 좋을텐데

  • @oggl60
    @oggl60 Месяц назад

    But we put, before some rocks first, the granitic sand compact at 100 % then the poor concrete, and next the steel, sorry for my English.

  • @erikcable1755
    @erikcable1755 Месяц назад

    standing on rebar wearing flip flops good solid feet here

  • @rashidpervaiz3563
    @rashidpervaiz3563 Месяц назад +1

    Only waste of money, substandard working.

  • @oggl60
    @oggl60 Месяц назад

    It is so much concrete, and it is poor resistance, too much water

  • @robertbutler8004
    @robertbutler8004 2 месяца назад +1

    Here in Australia that build would not pass the pub test.

  • @钟金隆
    @钟金隆 20 дней назад

    会不会拍视频呢,镜头老是在动

  • @tomre2769
    @tomre2769 Месяц назад

    2 min in, what is he doing?..

  • @aliasismail4911
    @aliasismail4911 17 дней назад

    Puak mung cakap bahasa Alien ke😂😂😂

  • @SuperCOLDRICE
    @SuperCOLDRICE Месяц назад +1

    #GARBAGE

  • @Goooseff
    @Goooseff 2 месяца назад +1

    The customer was dupe for money))) It was cheaper to make a foundation on stilts.

    • @James-il5ny
      @James-il5ny 2 месяца назад +1

      right, waste of money