Using Bricks as cover for footing is not accepted. We in fact removed it before concreting. The monolithic concrete element is been compromised with this practice. We intentionally played it here. Mr. Ganeshkumar, noted and asked about it in the first minute itself. Very happy about it.
Very nice sir... i guess this house is wall to wall construction on one side.. can you make a separate video for wall to wall construction and pls explain abt suitable type of column for wall to wall structure (i meant, when already both side houses are there)
Hello, Firstly, good work on the Informative videos. I have a question on the impact of rain water harvesting on the durability & strength of the foundation. Some people say, overtime the Fe-rods get rusted, concrete gets corroded. What Is the real impact of sending rain water back into the ground, in particular, near borewell? Thank you.
Very well explained about lap area and column tie binding process...thanks sir for ur great effort. Sir, I saw brick bats used as cover instead of cover blocks for footing in the video. Is it a good practice technically? Pls explain. Thanks..keep rocking.
Hai sir, I can see eccentric columns in this video. If I am right,for the eccentric columns we need to provide strab beam to the non eccentric footing. Please clarify about this eccentric footings
Concrete directly contacted with side soil. This is not good practice. Must use side formwork. Kothanar only follow this type of practices to save money. My opinion that's all.
Good question bro. If sufficient space is not available to provide shuttering and removal of the same, we can use thermocol or tarpad. We use those concepts.
All are fine with different advantages. AAC can be used for framed structures only (lot of strict rules to be followed in Load bearing structure). Fly ash bricks and red bricks are also fine, the primary thing is they should be manufactured well. Kindly check for the standards and strength factors. Water absorption is relatively high in these two.
That is wrong practice. It is been removed. Thought of adding it in the video. Missed it. Thanks for adding here bro We need to use Concrete cover blocks
Those joints are weaker points in a stirrup. It is better to rotate those joints. If you have done that differently, during additional load times they may act differently.
Using Bricks as cover for footing is not accepted. We in fact removed it before concreting. The monolithic concrete element is been compromised with this practice. We intentionally played it here. Mr. Ganeshkumar, noted and asked about it in the first minute itself. Very happy about it.
HONEY BUILDERS cover means what sir?
It is the space between concrete outer profile and steel inside
சர் கம்பி கட்டி அதை கான்கிரட் போட்டு மூடிடுவோமா.பின்னர் அது மேலே மணல் போடனும்மா.அப்படி போட்ட அது வலிமையா இருக்குமா.ஆடாதுல அந்த காலம்.
Erection tamil mean
Sir,
All information is well but the footing bottom cover bricks is not preferable.
Arumai sir. Vazha valamudan.
Useful information. ❤
very good information Sir. I can watching every video. Thank you.
Super, Strup rod position explained is very good...... Thanks
Super sir basic levels la irunthu theliva soldringa
very useful video sir I want more videos civil field
Very nice explain sir.thanks
Neenga Upload Panra Yella Videovum Oru Nalla Information ah Irukku Sir Thank Sir
நன்றி
Good Information Sir. Keep it up.
sir stirrups la connect agura edathula overlapping rod ah inverted ah U shape la bend panalama ila neenga kamichuruka mathiri vitralama?
great video in tamil!
Sir, thanks for the explanation. I have doubt in the Matt. Pillar should be in centre of the matt or anywhere in the matt is fine.
Very nice sir... i guess this house is wall to wall construction on one side.. can you make a separate video for wall to wall construction and pls explain abt suitable type of column for wall to wall structure (i meant, when already both side houses are there)
Will do brother
Honey builder, வணக்கம் சார் 🍏🍎
Very useful video
Thanks brother
Hello,
Firstly, good work on the Informative videos.
I have a question on the impact of rain water harvesting on the durability & strength of the foundation.
Some people say, overtime the Fe-rods get rusted, concrete gets corroded.
What Is the real impact of sending rain water back into the ground, in particular, near borewell?
Thank you.
Thank you sir
Useful information sir
Can we break RCC main column concrete from footing concrete, due to column m20 ratio not achieved
super 👍
Sir, with this structure and combination of pillars, how many floors can you raise ???. Your videos are really nice with good awareness...
sir why did not bent tie road 45degress inside?
Sir column interesting irukku
Sir super..
In future joining new rods to old rods. can we use welding to join it strongly???
lot of new methods are there. google for it and learn.
Useful sir ...
Sir stirpes oda hooks 45° ula pathu thana sir irukanum
sir slab or beam any other ku concrete use pandrom ithula cement sand agg ithulam evolo thevai paduratha eppidi sir calculate panni kandupikurathu sir
Pl provide one video for loaded structure basement and column up-to basement level?
Very well explained about lap area and column tie binding process...thanks sir for ur great effort.
Sir, I saw brick bats used as cover instead of cover blocks for footing in the video. Is it a good practice technically? Pls explain. Thanks..keep rocking.
It is been explained in the comments section bro. Obviously we should not use bricks as cover blocks
12mm rod column ku podalama sir 4 rod
roma nandri sir
Thanks
Hai sir,
I can see eccentric columns in this video. If I am right,for the eccentric columns we need to provide strab beam to the non eccentric footing. Please clarify about this eccentric footings
Hi sir, column mat la 3" bend panni top la irukkura maari vaikirom.ithu ethunala vaikiromnu detail aah sollunga
the required numbers of cover blocks for a slab, column, beam, raft, footing
Any rough count. Sir
Sir,
All information is well but the bottom cover bricks is not preferable.
Please avoid bricks below the mat... use cover block sir...
Asaru Deen kindly go through the comments. We discussed about it brother
கம்பிகளை இணைக்கும் இடத்தில் கட்டு கம்பியை போட்டு கட்டும் இடங்களில் வெல்டிங் செய்தால் இன்னும் பலம் கிடைக்கலாம் அல்லவா ?
Ring hook sir ??
ACC block brick work are safe to load bearing slab ?
4:40 hook 135° bend pannala ya
Nice
Gd
Sir, footingla irunthu, column rod lapping entha height la panradhu advisable? Thanks
Regards,
Enoch R
Madurai
Land Isolated shape lae irunthntha eppadi land measure panrathu
Explain pannungae
Sir villupuratil veedu katti tharamudiyuma ungal team
Sir , Column footing ku center la irukanuma ?? Indha video la column footing ku center la illa ....One side mat adhigama iruku
Hook 135 degree illaiye
thank u sir
Thanks brother
11/2ஜல்லி 6 இஞ்ச் leaveling course 3/4 ஜல்லி 11/4 அடி footing concrat க்கு எவ்வளவு cement ஆகும்
Sir oru ring(lateral tie) kum innoru ring kum evlo gap?
Hiii sir, please upload Telugu, Hindi, English.
சார் வணக்கம் 🙏 22×37 அளவு வீடு கட்ட 9''×9" காலம் போடலாம?
Stirrups en sir clockwise aha irukkanum
sir side la shuttering adika thevai ilaya
Concrete directly contacted with side soil. This is not good practice. Must use side formwork. Kothanar only follow this type of practices to save money. My opinion that's all.
You are right bro. We use Thermocol or tarpad according to the situration.
Column la lapping enga varanum sir??
பீம் connection இல்லாத இடத்தில வருவது சிறப்பு
sir why you not done shuttering all around the footing if soil mix with concrete it reduce the strength ?
Good question bro. If sufficient space is not available to provide shuttering and removal of the same, we can use thermocol or tarpad. We use those concepts.
Same question I also had doubt.
Please tell me which Bricks is the best AAC, Concrete bricks or normal clay bricks
All are fine with different advantages. AAC can be used for framed structures only (lot of strict rules to be followed in Load bearing structure). Fly ash bricks and red bricks are also fine, the primary thing is they should be manufactured well. Kindly check for the standards and strength factors. Water absorption is relatively high in these two.
HONEY BUILDERS Thank you very much
In footing concrete brick la cover vachuerukeenga this is correct.... !
That is wrong practice. It is been removed. Thought of adding it in the video. Missed it. Thanks for adding here bro We need to use Concrete cover blocks
Thank u sir...
plz discuss about tube level
sure brother
Sir foundation depth how much sir
sir 1.5 ஐல்லி கான்கீரிட் முக்கால் அடி மற்றும் .75 ஐல்லி கான்கீரீட் 1.25 அடி இதற்கு சிமெண்ட் எங்வளவு ஆகும்?
Google for it brother
Between two rings how much inches/centimeters are required ?
Here we provided 7". These things will be provided in a structural design.
Nega use pandra sand a photo eduthu anupunga sir
ஓகே
Sir colum rings and striups both are equal thana
yes. same name
11/2 6inch 3/4 15 inch cemnt evvalavu agum?
கேள்வி புரியவில்லை
Sir antha ring antha maathiri clockwise use pannama oru maathiri iruntha Enna aagum sir
Those joints are weaker points in a stirrup. It is better to rotate those joints. If you have done that differently, during additional load times they may act differently.
நன்றி
Erection mean
Sir unga contact vanum
very good information Sir. I can watching every video. Thank you.
You welcome brother
Very helpul video sir