Balitanghali: (Part 1) July 26, 2024

Поделиться
HTML-код
  • Опубликовано: 16 окт 2024

Комментарии • 19

  • @waray1st-lg6fb
    @waray1st-lg6fb 2 месяца назад +3

    Regulations on water-ways
    90meters/300ft should be the easements. 100ft for board-walk, 200ft 12-lanes road.

  • @maribelledonesa8278
    @maribelledonesa8278 2 месяца назад +3

    Hwag na Tau mgkalat ng basura para Hindi mgbara sa mga drainage ntin

  • @erwinalicaway-k4q
    @erwinalicaway-k4q 2 месяца назад +2

    kht anong gawin kng talagang malakas ang ulan aapaw at aapaw talaga ung mga dainage

  • @YheBundoc
    @YheBundoc 2 месяца назад

    Ingat kayo madulas

  • @MikejohnPeralta
    @MikejohnPeralta 2 месяца назад

    First

  • @waray1st-lg6fb
    @waray1st-lg6fb 2 месяца назад

    NEEDED RIVER WALLS AND ZERO INFRASTRUCTURES WITHIN 90M/300FT.

  • @wilfredoolayao6231
    @wilfredoolayao6231 2 месяца назад

    Sa hindi tamang pag kukumpuni ng mga Drainage at pagtapon ng basura kung saan saan kaya bumabaha.

  • @tiffnaturechannel
    @tiffnaturechannel 2 месяца назад

    kumusta nmn kaya mga barko ng ccg sa wps natangay ba ni carina

  • @rjbabedamar2343
    @rjbabedamar2343 2 месяца назад

    Eh kung di Yun pinigilan sa Oras na Yun ,Kun di. Sana punayan sa Oras na Yun di pa sana lumubog at na matayan