Technical Webinar - Understanding Uninterruptible Power Supply Systems Designs

Поделиться
HTML-код
  • Опубликовано: 1 дек 2024
  • НаукаНаука

Комментарии • 18

  • @hoxuanloca7707
    @hoxuanloca7707 3 года назад +2

    Great video, thank you so much, sir!

  • @weir-doe3205
    @weir-doe3205 Год назад

    Hi, for CB1 & 52C of a commercial UPS(9:37) , does it detect DC current or voltage propagating into the AC mains?

  • @andresariza3451
    @andresariza3451 2 года назад +1

    Dear AMETEK,
    Do you have any kind of UPS suitable for connect variable frecuency inverters?

  • @JBafable
    @JBafable Год назад

    If thier is a problem to an any outlet from UPS ,how can I reset
    the UPS ?

  • @AMMOHL
    @AMMOHL Год назад

    awesome training

  • @markswamy5364
    @markswamy5364 Год назад

    Where are your products manufactured?

  • @azeddineabdoune6394
    @azeddineabdoune6394 Год назад

    good work!

  • @trvn0891
    @trvn0891 3 года назад +1

    When normal power is lost, but normal power is fed thru ATS and you get normal power back within a couple of cycles; what are the sequence of the UPS? my understanding is to batterie power and back to normal after normal is restore to UPS

    • @ameteksolidstatecontrols4657
      @ameteksolidstatecontrols4657  3 года назад

      Please email your questions to sci.marketing@ametek.com and we will connect you with someone to answer your questions.

    • @karbonphiber
      @karbonphiber 2 года назад

      Yea that’s correct.

    • @craigwilliams6158
      @craigwilliams6158 2 года назад

      Ricardo. When you have an ATS feeding the normal power (rectifier/charger) to the UPS, when normal power is lost a standby generator will start. This generator usually takes around 30 seconds to 1 minute to start and get up to speed. After it is up to speed, the ATS will transfer power supplied to the rectifier/charger to the generator. During the 30 seconds to 1minute, there will be no power into the rectifier/charger. Therefore the battery will supply the inverter while the generator is starting. Once the generator is on and the ATS transfers, power will be returned to the charger/rectifier section of the UPS and the batteries will start to charge again.
      It should be noted that the ATS does not have anything to do with the load circuits. Only the input power to the rectifier charger section of the UPS.

  • @abuelobarimene9712
    @abuelobarimene9712 Год назад

    how can I test a ups system after design before construction

    • @ameteksolidstatecontrols4657
      @ameteksolidstatecontrols4657  Год назад

      Hi, please email us at sci.marketing@ametek.com and we will get your question passed along to our technical manager.

  • @rfans4
    @rfans4 3 года назад +1

    07:26 what function of external transformer in UPS?
    for motor load did we also need transformer?

    • @ameteksolidstatecontrols4657
      @ameteksolidstatecontrols4657  3 года назад +1

      Thank you for watching the video and commenting! Please email your questions to sci.marketing@ametek.com and we will connect you with someone to answer your questions.

    • @karbonphiber
      @karbonphiber 2 года назад +2

      Function of the external transformer is to step up/down voltage, or derive a neutral source, or create a solid ground source for the ups. Not ideal to place motor load on ups as it will overload it during startup due to high in rush

    • @AMMOHL
      @AMMOHL Год назад

      Isolation of the inverter or electronic system in the inverter against inrush currents arising from industrial loads. Basically, it is for safety purposes of the UPS systems.

  • @janakapriyadarshana5835
    @janakapriyadarshana5835 Год назад

    Nice video, can I get your email pls?